Lincoln EfW, Paving Way Off Whisby Road, North Hykeham, Lincoln, Lincolnshire, LN6 3QW
LN6 3QW
Last updated: 12 Aug 2025 09:32 UTC
18 Components Coal/biomass Energy from Waste FCC Recycling (UK) Limited
Total Capacity: 11.53 MW
Components: 18
Technologies:
Coal/biomass, Energy from Waste
Unique CMUs: 3

Secondary Trading Contacts

Contact Information

Component Descriptions

FCC Lincoln Energy From Waste Plant Paving Way off Whisby Road Lincoln LN6 3QW. Energy from waste plant located in North Hykeham. The auxiliary load is not included in the connection capacity. i.e.the export is net.

Used by 1 CMU

New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 150kT Energy From Waste Plant with electrical output of c. 13MW. The auxiliary load is not included in the connection capacity. i.e.the export is net.

Used by 3 CMUs

New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 190kT Energy From Waste Plant with electrical output of c. 13MW. The auxiliary load is not included in the connection capacity. i.e.the export is net.

Used by 1 CMU

This new CMU identifier is the replacement of LINC01 due to change in the Connection Capacity to Grid Connection Capacity as per rule 3.5.2. FCC Environment Lincolnshire Ltd, 150kT Energy From Waste Plant with electrical output of c. 13MW. The auxiliary load is not included in the connection capacity. i.e.the export is net.

Used by 1 CMU

Components at this Location

Click on yellow auction year badges to see individual component pages

FCC Lincoln Energy From Waste Plant Paving Way off Whisby Road Lincoln LN6 3QW. Energy from waste plant located in North Hykeham. The auxiliary load is not included in the connection capacity. i.e.the export is net.
CMU: LINC01
Capacity Information:
De-Rated Capacity (Registry) 11.27
Connection/DSR Capacity 12.966
Anticipated Capacity 10.881
New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 150kT Energy From Waste Plant with electrical output of c. 13MW. The auxiliary load is not included in the connection capacity. i.e.the export is net.
CMU: FCCLI3
Energy from Waste FCC ENVIRONMENT (LINCOLNSHIRE) LIMITED Parent: Green Recovery Projects Limited
Capacity Information:
De-Rated Capacity (Registry) 11.6
Connection/DSR Capacity 13.1
Anticipated Capacity 11.6
2022-23 (T-1) One Year Ahead Capacity Auction
CMU: FCCLI4
Energy from Waste FCC ENVIRONMENT (LINCOLNSHIRE) LIMITED Parent: Green Recovery Projects Limited
Capacity Information:
De-Rated Capacity (Registry) 11.527
Connection/DSR Capacity 13.1
Anticipated Capacity 11.527
2023-24 (T-1) One Year Ahead Capacity Auction
New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 190kT Energy From Waste Plant with electrical output of c. 13MW. The auxiliary load is not included in the connection capacity. i.e.the export is net.
CMU: LINC01
Capacity Information:
De-Rated Capacity (Registry) 11.27
Connection/DSR Capacity 12.966
Anticipated Capacity 10.881
2028-29 (T-4) Four Year Ahead Capacity Auction 2027-28 (T-4) Four Year Ahead Capacity Auction
This new CMU identifier is the replacement of LINC01 due to change in the Connection Capacity to Grid Connection Capacity as per rule 3.5.2. FCC Environment Lincolnshire Ltd, 150kT Energy From Waste Plant with electrical output of c. 13MW. The auxiliary load is not included in the connection capacity. i.e.the export is net.
CMU: LINC01
Capacity Information:
De-Rated Capacity (Registry) 11.27
Connection/DSR Capacity 12.966
Anticipated Capacity 10.881