You can explore the basic features, but will need to register for continued access to premium features like the interactive map.
Secure payment • No subscription • Lifetime access
Understanding AuctionsSearch ResultsComponent GroupingSortingMap ViewContact UsThis registry provides comprehensive search capabilities across all Capacity Market components:
The search is intelligent and will try to determine what you're looking for based on your query.
You can combine search terms to narrow results, such as "London Battery" to find battery storage in London.
Searches are not case-sensitive, and partial matches are supported (e.g., "Manch" will find "Manchester").
The Capacity Market runs regular auctions where providers compete to secure agreements. There are two main types:
Each auction results in agreements that specify how much capacity providers must deliver and the payment they'll receive.
Auction years are displayed as badges (e.g., 2023-24) that you can click to view details for that specific auction year.
The Capacity Market ensures the UK has sufficient electricity supply during periods of high demand or system stress.
Providers receive payments for ensuring their capacity is available, creating a more stable and resilient electricity market.
Search results are grouped by location and show important details about each component:
Each result shows the component's capacity, location details, and participation in specific auction years.
You can sort results by relevance, location, or date using the sort options.
Pagination controls appear at the bottom when there are multiple pages of results.
Components at the same location with the same description are grouped together to reduce duplication.
Each group shows:
Grouping helps identify multi-year contracts and related components at the same site.
The total capacity shown combines all components in the group.
Components can be expanded to show individual details by clicking the expand icon.
You can sort search results by:
Click the column headers to change sort order.
You can filter results using the search refinements at the top of the results page:
We provide two map-based tools for exploring capacity market data:
The Map Explorer is our advanced interactive mapping tool, specifically designed for comprehensive data exploration with:
The Search Map View combines search functionality with map visualization, offering:
Both tools provide a visual representation of capacity distribution across the UK, but serve different exploration needs.
Use the map controls to zoom in on specific regions or areas of interest. The map automatically adjusts clustering based on your zoom level to provide the clearest view of capacity distribution.
We're here to help with any questions about the Capacity Market Registry.
For general inquiries and support:
32 unique locations (100 components)
Commercial sites
The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
6 x 1.1MW gas reciprocating engines at Cheshire Power Station (2)
CMU formed of multiple individual Reciprocating Engines
One (1) Open Cycle Gas Turbine MSID: 7382 (3)
Modular reciprocating engines
CMU consisting of multiple reciprocating engines and alternators (3)
The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
On-site Generating CMU. (2)
The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)
The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
22.5MW Gas Reciprocating Engines envisaged to be made up of multiple modules.
A new build, gas fueled generation station (2)
The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
A new build, gas fueled generation station (2)
The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (2)
Energy from waste Facility (3)
A new build, gas fuelled generation station (2)
The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
CMU consisting of a gas reciprocating engine and alternator (3)
CMU will be formed of multiple individual gas reiprocating engine units
The CMU will be formed of multiple battery storage units and medium voltage stations (inverter and battery transformer) connected in parallel. (2)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)
You can explore the basic features, but will need to register for continued access to premium features like the interactive map.
Secure payment • No subscription • Lifetime access