Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Capacity Market Search
Menu
Home
  • Technologies
  • Companies
  • Locations
  • Map Explorer
  • FAQ
  • Trading Board
  • Buy Me A Coffee
  • Help

  • Login
  • Register

  • Theme
  • Light
  • Dark
  • Auto
  • Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access

    Understanding AuctionsSearch ResultsComponent GroupingSortingMap ViewContact Us

    Search Guide

    This registry provides comprehensive search capabilities across all Capacity Market components:

    • Company Search: Enter a company name (e.g., "Drax", "EDF") to see all their components
    • Location Search: Search by city, region, or postcode (e.g., "Manchester", "SW1")
    • CMU ID Search: Enter a specific CMU ID to find exact components
    • Technology Search: Enter technology types like "Hydro", "OCGT", or "Battery"

    The search is intelligent and will try to determine what you're looking for based on your query.

    You can combine search terms to narrow results, such as "London Battery" to find battery storage in London.

    Searches are not case-sensitive, and partial matches are supported (e.g., "Manch" will find "Manchester").

    Understanding Auctions

    The Capacity Market runs regular auctions where providers compete to secure agreements. There are two main types:

    • T-4 auctions: Held 4 years ahead of the delivery year
    • T-1 auctions: Held 1 year ahead to fine-tune capacity requirements

    Each auction results in agreements that specify how much capacity providers must deliver and the payment they'll receive.

    Auction years are displayed as badges (e.g., 2023-24) that you can click to view details for that specific auction year.

    The Capacity Market ensures the UK has sufficient electricity supply during periods of high demand or system stress.

    Providers receive payments for ensuring their capacity is available, creating a more stable and resilient electricity market.

    Search Results

    Search results are grouped by location and show important details about each component:

    • Active Components with auction years 2024-25 or later
    • In-Active Components with only auction years before 2024-25
    • Company Name Click to view all components for this company
    • Technology Click to search for this technology type
    • CMU: XXX Click to search for this CMU ID
    • Auction Year Click to view details for this specific auction

    Each result shows the component's capacity, location details, and participation in specific auction years.

    You can sort results by relevance, location, or date using the sort options.

    Pagination controls appear at the bottom when there are multiple pages of results.

    Component Grouping

    Components at the same location with the same description are grouped together to reduce duplication.

    Each group shows:

    • All CMU IDs for components at that location
    • All auction years, sorted with newest first
    • An Active/Inactive status based on auction years

    Grouping helps identify multi-year contracts and related components at the same site.

    The total capacity shown combines all components in the group.

    Components can be expanded to show individual details by clicking the expand icon.

    Sorting and Filtering

    You can sort search results by:

    • Relevance: Most relevant matches first
    • Location: Alphabetical order by location name
    • Date: By auction year (newest or oldest first)
    • Capacity: Highest or lowest capacity first

    Click the column headers to change sort order.

    You can filter results using the search refinements at the top of the results page:

    • Filter by technology type (e.g., only show batteries)
    • Filter by active status (show only active or inactive components)
    • Filter by auction year (show only components from specific auctions)

    Map Explorer & Map View

    We provide two map-based tools for exploring capacity market data:

    Map Explorer

    The Map Explorer is our advanced interactive mapping tool, specifically designed for comprehensive data exploration with:

    • Mobile-Optimized Interface: Responsive design that works perfectly on phones and tablets
    • Advanced Filtering: Filter by technology type, company, delivery year, and active status
    • Smart Sidebar: Desktop users get a dedicated filter panel, mobile users get collapsible filters
    • Full-Screen Map: Maximizes map space for detailed geographical analysis
    Search Map View

    The Search Map View combines search functionality with map visualization, offering:

    • Search-First Approach: Start with text searches, then visualize results on the map
    • Integrated Results: Search results and map display work together
    • Performance Optimized: Streamlined for fast search result mapping

    Both tools provide a visual representation of capacity distribution across the UK, but serve different exploration needs.

    Map Features:
    • Technology Colors: Different technology types are shown with distinct colors on the map for easy identification:
      GasDSRNuclearCHPSolarWind
      BatteryBiomassHydroInterconnectorCoalOther
    • Technology Legend: The map legend shows all available technologies with their corresponding colors and component counts
    • Search Results on Map: You can view any search results on the map by clicking "View on Map" from search results pages
    • Smart Clustering: Areas with multiple components are automatically grouped into clusters - click clusters to zoom in and see individual components
    • Interactive Markers: Click on individual markers to see detailed information about components at that location

    Use the map controls to zoom in on specific regions or areas of interest. The map automatically adjusts clustering based on your zoom level to provide the clearest view of capacity distribution.

    Contact Us

    We're here to help with any questions about the Capacity Market Registry.

    Email

    For general inquiries and support:

    Loading...
    Loading...

    Search Results for "CH65"

    32 unique locations (100 components)

    All
  • Active
  • Inactive
  • All Markets
  • Capacity Market
  • SFFR
  • Sort by: Relevance A-Z Components MW Date
    All
  • Active
  • Inactive
  • All Markets
  • Capacity Market
  • SFFR
  • Sort:
    Asda Ellesmere Port, Grange Road CH65 0BZ(6 components)
    • Load drop (2)
    • Load curtailment from refridgeration
    DSRFLEXITRICITY LIMITEDCH65
    Active • 2028-29 (T-4), 2025-26 (T-4) ...
    Boots, Ellesmere Prt Cheshr Oak - Wirral and Chester CH65 9HD(1 component)

    Commercial sites

    DSROAKTREE POWER LIMITEDCH65
    Active • 2024-25 (T-1)
    Bridgewater Paper Mill, North Road, Ellesmere Port CH65 1AL(2 components)

    The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)

    OCGT and Reciprocating Engines (Fuel Type - Gas)UK Flexible Reserve LimitedCH65
    Inactive • 2021-22 (T-4), 2018-19 (T-1)
    Cheshire Power Station (Formally known as 'Bridgewater Paper') North Road Ellesmere Port CH65 1AF(2 components)
    • 12 x 1.1 MW Reciprocating gas engines at Cheshire Power Station
    • New build 12 x 1.1 MW Reciprocating gas engines at Cheshire Power Station
    Reciprocating enginesOCGT and Reciprocating Engines (Fuel Type - Gas)Aggreko UK LimitedCH65
    Inactive • 2019-20 (T-1), 2018-19 (T-1)
    Cheshire Power Station (Formerly known as 'Bridgewater Paper') North Road Ellesmere Port South Wirral CH65 1AF(2 components)

    6 x 1.1MW gas reciprocating engines at Cheshire Power Station (2)

    Reciprocating enginesOCGT and Reciprocating Engines (Fuel Type - Gas)Aggreko UK LimitedCH65
    Inactive • 2019-20 (T-1), 2018-19 (T-1)
    Cheshire Power Station North Road Ellesmere Port Cheshire CH65 1AF(6 components)
    • CMU will be formed of multiple individual reciprocating gas engines. (2)
    • CMU will be formed of multiple individual gas reciprocating gas engines.
    Reciprocating enginesRWE GENERATION UK PLCCH65
    Active • 2025-26 (T-4), 2024-25 (T-4) ...
    Cheshire Power Station, North Road, Ellesmere Port, Cheshire, CH65 1AF(1 component)

    CMU formed of multiple individual Reciprocating Engines

    Reciprocating enginesRWE GENERATION UK PLCCH65
    Active • 2024-25 (T-1)
    Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF(11 components)

    One (1) Open Cycle Gas Turbine MSID: 7382 (3)

    Open Cycle Gas Turbine (OCGT)RWE GENERATION UK PLCCH65
    Active • 2028-29 (T-4), 2025-26 (T-1) ...
    123.42 MW
    Cheshire Power Station, North Road, Ellesmere Port, South Wirral, CH65 1AF(1 component)

    Modular reciprocating engines

    Reciprocating enginesRWE GENERATION UK PLCCH65
    Active • 2028-29 (T-4)
    21.04 MW
    Dock Yard Power, Dock Yard Road, Ellesmere Port, CH65 4EF(4 components)

    CMU consisting of multiple reciprocating engines and alternators (3)

    Reciprocating enginesURBAN RESERVE (ASSETCO) LIMITEDCH65
    Active • 2025-26 (T-4), 2024-25 (T-1) ...
    Dock Yard Rd, Ellesmere Port, CH65 4EG(7 components)
    • BtM storage providing standby capacity (2)
    • BtM storage as standby generation, non-exporting
    DSRFLEXITRICITY LIMITEDCH65
    Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
    Eastham Refinery Ltd, North Road, Ellesmer Port, Cheshire CH65 1AJ(2 components)

    The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)

    OCGT and Reciprocating Engines (Fuel Type - Gas)UK Flexible Reserve LimitedCH65
    Inactive • 2021-22 (T-4), 2018-19 (T-1)
    Innospec Manufacturing Park, Oil Sites Road Ellesmere Port, Cheshire CH65 4EY(2 components)

    On-site Generating CMU. (2)

    Combined Heat and Power (CHP)GRIDBEYOND LIMITEDCH65
    Active • 2028-29 (T-4), 2025-26 (T-1)
    5.61 MW
    Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL(6 components)

    The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

    BatteryStorageStorage (Duration 1h)SIGBAT A LIMITEDCH65
    Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
    Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire, CH65 1AL(2 components)

    The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

    UK Strategic Reserve LimitedCH65
    Inactive • 2017-18 (T-1)
    Land at North Road, Vauxhall, Ellesmere Port, CH65 1BA(1 component)

    22.5MW Gas Reciprocating Engines envisaged to be made up of multiple modules.

    Reciprocating enginesPeel L&P Energy LimitedCH65
    Active • 2024-25 (T-4)
    Land off Merseyton Road, Ellesmere Port, Cheshire West and Chester, CH65 2JE(2 components)

    A new build, gas fueled generation station (2)

    Reciprocating enginesBAKER STREET GENERATION LIMITEDCH65
    Active • 2026-27 (T-4), 2025-26 (T-4)
    19.04 MW
    Land off Merseyton Road, Ellesmore Port CH65 2HQ(2 components)

    The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)

    OCGT and Reciprocating Engines (Fuel Type - Gas)UK Flexible Reserve LimitedCH65
    Inactive • 2021-22 (T-4), 2018-19 (T-1)
    Land off North Road, Vauxhall, Ellesmere Port, CH65 1BA(2 components)

    A new build, gas fueled generation station (2)

    Reciprocating enginesBAKER STREET GENERATION LIMITEDCH65
    Active • 2026-27 (T-4), 2025-26 (T-4)
    21.42 MW
    Land Off, Oil Sites Road, Ellesmere Port CH65 4EY(2 components)

    The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

    UK Capacity Reserve LtdCH65
    Inactive • 2017-18 (T-1)
    Land South of Stanlow, Oil Sites Road, Ellesmere Port CH65 4EY(2 components)

    The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (2)

    BatteryStorageUK Dynamic Reserve LimitedCH65
    Inactive • 2021-22 (T-4), 2018-19 (T-1)
    Land to the West of Chapterhouse Close, Ellesmere Port, CH65 4EL(2 components)
    • 49.5 MW Gas Reciprocating Engines envisaged to be made up of multiple modules.
    • 49.9 MW Gas Reciprocating Engines envisaged to be made up of multiple modules.
    Reciprocating enginesPeel L&P Energy LimitedCH65
    Active • 2024-25 (T-4), 2023-24 (T-4)
    North Road, Eastham, CH65 1AJ(4 components)

    Energy from waste Facility (3)

    Coal/biomassEnergy from WasteHOOTON BIO POWER LIMITEDCH65
    Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
    North Road, Vauxhall, Ellesmere Port, CH65 1BA(2 components)

    A new build, gas fuelled generation station (2)

    Reciprocating enginesFORSA ENERGY (DRUMCROSS) HOLDINGS LIMITEDCH65
    Active • 2028-29 (T-4), 2027-28 (T-4)
    42.26 MW
    Oil sites road, Ellesmere Port, Cheshire, CH65 4EQ(1 component)

    The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

    UK Energy Reserve LimitedCH65
    Inactive • 2020-21 (T-4)
    OIL SITES ROAD NYNAS REFINERY ELLESMERE PORT CHESHIRE WEST CH65 4EF(5 components)

    CMU consisting of a gas reciprocating engine and alternator (3)

    Reciprocating enginesURBAN RESERVE (ASSETCO) LIMITEDCH65
    Active • 2024-25 (T-4), 2023-24 (T-4) ...
    RWE Cogen UK Limited (formerly know as Bridgewater Paper CHP) North Road Ellesmere Port South Wirral CH65 1AF(2 components)
    • CMU will be formed of multiple individual gas reciprocating engine units
    • One (1) Open Cycle Gas Turbine
    OCGT and Reciprocating Engines (Fuel Type - Gas)RWE Cogen UK LimitedCH65
    Inactive • 2021-22 (T-4)
    RWE Cogen UK Ltd North Road Ellesmere Port Cheshire CH65 1AF(2 components)

    CMU will be formed of multiple individual gas reiprocating engine units

    Aggreko UK LimitedCH65
    Inactive • 2017-18 (T-1)
    RWE Cogen UK Ltd North Road Ellesmere Port South Wirral CH65 1AF(5 components)
    • Cheshire OCGT - Currently no additional load on the Private Network - Auxiliary load behind boundary meter (2)
    • CMU will be formed of multiple individual gas reiprocating engine units
    OCGTRWE Cogen UK LimitedCH65
    Inactive • 2020-21 (T-4), 2017-18 (T-1)
    RWE Generation UK plc, Cheshire Power Station North Road, Ellesmere Port Cheshire CH65 1AF(2 components)

    The CMU will be formed of multiple battery storage units and medium voltage stations (inverter and battery transformer) connected in parallel. (2)

    BatteryStorage (Duration 2h)RWE GENERATION UK PLCCH65
    Active • 2026-27 (T-4), 2025-26 (T-4)
    3.55 MW
    Stanlow Manufacturing Complex, Ellesmere Port, Cheshire, CH65 4HB(3 components)
    • 2 x On-site turbo alternators
    • 6 x On-site turbo alternators
    • Power Recovery Train
    Combined Heat and Power (CHP)CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITEDCH65
    Inactive • 2019-20 (T-1)
    Veolia, Bridges Rd, Ellesmere Port, Cheshire, CH65 4EQ(6 components)

    Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

    DSRGRIDBEYOND LIMITEDCH65
    Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
    Loading map...
    Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access