Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Search / All Locations / All Postcodes / DG6 / DG6 4LT

Tongland, Kirkcudbrightshire, DG6 4LT, Scotland

30.03 MW (CMU DX24TO)
Total Capacity
DG6 4LT
Postcode
21
Components
Active*
2028-29
Prequalified
Prequalification (2028)
Existing Generating CMU
* Latest auction year on record
Company:
DRAX RIVER HYDRO LIMITED Active 2028 21 components
Descriptions:
β€’ Tongland hydro power station - Unit 1, part of the Galloway hydroelectric scheme The registered capacity of the Tongland power …
β€’ Tongland hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Tongland Power …
β€’ Tongland hydro power station - Unit 3, part of the Galloway hydroelectric scheme The registered capacity of the Tongland Power …
β€’ Tongland hydro power station - Unit 1, part of the Galloway hydroelectric scheme
β€’ Tongland hydro power station - Unit 2, part of the Galloway hydroelectric scheme
β€’ Tongland hydro power station - Unit 3, part of the Galloway hydroelectric scheme
Trading Contacts:
DRAX RIVER HYDRO LIMITED
Other Locations at This Postcode 1 location

CMU Registry Data

CMU DX24TO
30.03 DRAX RIVER HYDRO …
Existing Generating CMU 2028-29
CMU DX23TO
30.096 DRAX RIVER HYDRO …
Existing Generating CMU 2027-28
CMU DX22TO
31.628 DRAX RIVER HYDRO …
Existing Generating CMU 2026-27
CMU DX21TO
31.763 DRAX RIVER HYDRO …
Existing Generating CMU 2025-26
CMU DX20TO
30.027 DRAX RIVER HYDRO …
Existing Generating CMU 2024-25
CMU DX19TO
29.586 DRAX RIVER HYDRO …
Existing Generating CMU 2023-24