Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

Search Results for "EH42"

10 unique locations (56 components)

Aikengall 2a Wind Farm Innerwick EH42 1SG (2 components)

New Build Battery Energy Storage System. To be connected at WesterDod 132kV substation. (2)

Active • 2027-28 (T-4), 2024-25 (T-1)
6.70 MW
Aikengall IIa Wind Farm Innerwick EH42 1SG (5 components)

Existing Generation CMU - Onshore Wind. Connected at WesterDod 132kV substation. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.47 MW
Asda Dunbar, Spott Road EH42 1LE (8 components)
• Load drop (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Dunbar BESS, Dunbar, East Lothian, EH42 1RG, Scotland, UK (1 component)

Total Connection capacity of 49.99MW for Energy Storage. The component will be LFP BESS.

Active • 2028-29 (T-4)
8.17 MW
Dunbar Cement Works, Dunbar Plant, Dunbar, EH42 1SL (3 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
Dunbar ERF, Oxwell Mains, Dunbar, East Lothian, EH42 1SW (2 components)
• Dunbar ERF, Energy from Waste
• Twin stream Energy from Waste plant with a connection capacity of 36MW and an expected export of 34MW. Located in …
Inactive • 2020-21 (T-4), 2019-20 (T-1)
Dunbar Works, Dunbar, East Lothian, EH42 1SL (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QS (8 components)
• Torness Power Station CMU 1: [TN1-16] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 1: [TN1-17] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 2: [TN2-17] T_TORN-2 + (50% x T_TORN-D)
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU (20 components)
• Torness Power Station CMU 1: [TN1-23] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 1: [TN1-24] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 2: [TN2-24] T_TORN-2 + (50% x T_TORN-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1886.00 MW
Tarmac Dunbar, Dunbar Works, Dunbar, East Lothian, EH42 1SL (1 component)

New Build CMU comprising of Solar PV and associated plant.

Active • 2028-29 (T-4)
1.25 MW
Loading map...
Showing 10 locations