Asda Havant, Larchwood Avenue Bedhampton PO9 3QW (8 components)
• Load drop (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
BEDHAMPTON QUAY, HARTS FARM WAY, HAVANT, HAMPSHIRE, PO9 1JN (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Bedhampton Quay, Harts Farm Way, Havant, PO9 1JN (2 components)

29 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets disputes: 29*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions … (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Boots, Havant West St - Hampshire and South Downs PO9 1PG (1 component)

Commercial sites

Active • 2024-25 (T-1)
Brockhampton Road, Havant Pumping Station, Havant, PO9 1NU (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1)
BUDDS FARM HAVANT WTW SOUTHMOOR LANE HAVANT HAMPSHIRE PO9 1JW (2 components)

Diesel Generator at Budds Farm Havant WTW

Inactive • 2016-17 (TR)
Castle road rowland's castle hampshire PO9 (4 components)

EV charging at residential premises (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
DURRANTS ROAD ROWLAND'S CASTLE HAMPSHIRE PO9 (4 components)

EV charging at residential premises (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Finchdean Road ROWLAND'S CASTLE HAMPSHIRE PO9 (1 component)

EV charging at residential premises

Inactive • 2023-24 (T-1)
FINCHDEAN ROAD ROWLAND'S CASTLE HAMPSHIRE PO9 (4 components)

EV charging at residential premises (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Harts Farm Way Havant Hampshire PO9 1HS (2 components)
• A new power plant, with associated civil works, switchgear and electrical connection.
• Recently completed power plant, with associated civil works, switchgear and electrical connection.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Harts Farm Way, Havant, PO9 1HS (3 components)
• Gas fired reciprocating engines
• Gas fired reciprocating engines.
• gas fired reciprocating engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Land at Hermitage Park, Harts Farm Way, Havant, PO9 1HS (2 components)

Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear

Inactive • 2022-23 (T-4)
Langstone Power Generation Plant, Southmoor Lane, Havant, Hampshire, PO9 1JW (5 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.48 MW
LINKS LANE ROWLAND'S CASTLE HAMPSHIRE PO9 (1 component)

EV charging at residential premises

Inactive • 2023-24 (T-1)
OAKLANDS AVENUE ROWLAND'S CASTLE HAMPSHIRE PO9 (4 components)

EV charging at residential premises (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Park Way, Havant, Hampshire , PO9 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Plot 2, Hermitage Park, Harts Farm Way,Havant PO9 1JU (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
Plot 4 Hermitage Park, Harts Farm Way, Havant, PO91FA (2 components)
• 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Hermitage Park
• A new build, gas fuelled generation station
Active • 2026-27 (T-4), 2025-26 (T-4)
19.04 MW
PO9 (5 components)
• Domestic EV charger (2)
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
Ranelagh Road, Bedhampton Pump Station, Havant, PO9 1NR (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1)
Southmoor Lane Havant Hampshire PO9 1JW (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Southmoor Lane, Havant, Hampshire, PO9 1JW (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
7.09 MW
Southmoor Lane Havant PO9 1JW (1 component)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2020-21 (T-4)
Southmoor Lane, Havant, PO9 1JW (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4)
Woodstock Road, Havant, PO9 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)