Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing last 111 of 111 unique locations - Page 1 of 5

Sort by: A-Z Components MW Date
to be provided once CMU Components are known (1 component)

to be provided once CMU Components are known

Inactive • 2020-21 (T-4), 2017-18 (TR) ...
91.69 MW (Est from CMU)
(Estimated)
West Thorpe, Willoughby on the Wolds, LE12 6TD (2 components)
• Additional capacity alongside other plant at Willoughby. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW. The Financial Milestone was been completed before the previous auction.
• Reciprocating engines
Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
No capacity data
(Estimated)
Warsop 1 Energy Park Carter Lane Warsop Vale NG20 8XG (1 component)

1x 1.35MW Containerised Generating sets.

Inactive • 2016-17 (TR)
1.07 MW (Est from CMU) (part of 1.07 MW aggregated CMU)
(Estimated)
WHITTON-WW, Thurleston Lane, Ipswich, Suffolk, IP1 6TG (1 component)

Diesel Generator, Perkins

Inactive • 2017-18 (T-1), 2016-17 (TR)
1.08 MW (Est from CMU) (part of 1.08 MW aggregated CMU)
(Estimated)
WELLINGBOROUGH-ISE VALLEY TPS, Ditchford Road, Wellingborough, Northamptonshire, NN8 1RG (1 component)

Generator, Perkins, 4016TAG1A

Inactive • 2017-18 (T-1), 2016-17 (TR)
1.08 MW (Est from CMU) (part of 1.08 MW aggregated CMU)
(Estimated)
Unit B1-B3 Coed Cae Industrial Estate, Pontyclun, South Wales, CF72 9HG (1 component)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The Power plant is connected to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution network and WWU gas network.
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
15.13 MW (Est from CMU)
(Estimated)
Trostre Works Llanelli Carmarthenshire SA14 9SD OS 52850E 99360N (1 component)

Industrial Manufacturing Site with multiple processes. Energy Demand Management Operational plans already in place.

Inactive • 2016-17 (TR)
No capacity data
(Estimated)
Toray 1 Energy Park Crown Farm Way Forest Town Mansfield Notts NG19 0FT (1 component)

1x 1.55MW Containerised Generating sets.

Inactive • 2016-17 (TR)
1.07 MW (Est from CMU) (part of 1.07 MW aggregated CMU)
(Estimated)
Titanium Rd, Swansea, SA5 4SF (1 component)

Reciprocating engines

Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
18.91 MW (Est from CMU)
(Estimated)
Tir John N Rd, St Thomas, SA1 8NZ (1 component)

Reciprocating engines

Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
No capacity data
(Estimated)
These sites are already generating and exporting to the distribution grid. We are aggregating their output in the context of and FFR Growth programme. (1 component)

Different sites with generation increase that already participate in the FFR growth programme

Inactive • 2016-17 (TR)
No capacity data
(Estimated)
TILBURY STW, Fort Road, Thurrock, Essex, RM18 8UJ (1 component)
• Diesel Generator, Dorman, 16SETCA
• Cummins - Natural Gas Engine
• Diesel Generator, Cummins, KTA38G
Inactive • 2017-18 (T-1), 2016-17 (TR)
2.51 MW (Est from CMU) (part of 2.51 MW aggregated CMU)
(Estimated)
Sully Moors Industrial Estate, Barry, South Wales, CF64 5RP (1 component)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
15.13 MW (Est from CMU)
(Estimated)
Somerden Rd, Hull, HU9 5PE (1 component)

Reciprocating engines

Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
No capacity data
(Estimated)
Sites across Great Britain. See business plan. (1 component)

A combination of standby generation and load reduction.

Inactive • 2017-18 (TR), 2017-18 (T-1) ...
8.68 MW (Est from CMU)
(Estimated)
Severnside Energy Recovery Centre Severn Road Hallen, Bristol South Gloucestershire BS10 7SP (1 component)
• Existing Energy from Waste Plant
• New Build Energy from Waste Plant
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
28.91 MW (Est from CMU)
(Estimated)
Seedy Mill Treatment Works, Lichfield Road, Elmhurst, Lichfield WS13 8HQ (1 component)

Onsite generation

Inactive • 2017-18 (T-1), 2016-17 (TR)
1.71 MW (Est from CMU) (part of 1.71 MW aggregated CMU)
(Estimated)
SUTTERTON RESERVOIR, Spalding Road, Sutterton, Lincolnshire, PE20 2EW (1 component)

Diesel Generator, Dorman, 12STCAR3

Inactive • 2017-18 (T-1), 2016-17 (TR)
0.72 MW (Est from CMU) (part of 0.72 MW aggregated CMU)
(Estimated)
RUSHBROOKE-WS, Rushbrooke Lane, Rushbrooke, Suffolk, IP30 2RS (1 component)

Diesel Generator, Perkins, 3012TAG1A

Inactive • 2017-18 (T-1), 2016-17 (TR)
0.72 MW (Est from CMU) (part of 0.72 MW aggregated CMU)
(Estimated)
ROTHERHAM WORKS POBOX 50 ALDWARKE LANE S60 1DW OS: SK45009500 (3 components)
• Industrial Site comprising multiple electro intensive process Reduction in Imported Electricity Site is directly connected but not CMRS CMU ( see business plan)
• Industrial Site comprising multiple electro intensive proceses_ Reduction in Imported Electricity Directly connected but not CMRS CMU ( see business plan)
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
75.71 MW (Est from CMU)
(Estimated)
RAVENSTHORPE WW, Teeton Road, Ravensthorpe, Northamptonshire, NN6 8LS (1 component)

Diesel Generator, Perkins

Inactive • 2017-18 (T-1), 2016-17 (TR)
0.72 MW (Est from CMU) (part of 0.72 MW aggregated CMU)
(Estimated)
Prince of Wales CMM Generation Land off Skinner Lane Pontefract West Yorkshire WF8 1HG (1 component)

1x 1.55MW Containerised Generating sets.

Inactive • 2016-17 (TR)
1.07 MW (Est from CMU) (part of 1.07 MW aggregated CMU)
(Estimated)
Prestwood Pumping Station, Greenforge Lane,  Prestwood,  Stourbridge, DY7 5BB (1 component)

Onsite generation

Inactive • 2017-18 (T-1), 2016-17 (TR)
1.42 MW (Est from CMU) (part of 1.42 MW aggregated CMU)
(Estimated)
Pipe Hill Pumping Station, Walsall Road, Pipehill, Lichfield, WS14 0DF (1 component)

Onsite generation

Inactive • 2017-18 (T-1), 2016-17 (TR)
1.42 MW (Est from CMU) (part of 1.42 MW aggregated CMU)
(Estimated)
Pengarnddu Ind Est, Dowlais Top, Merthyr Tydfil, CF48 2TA (2 components)
• Reciprocating Engines
• New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
18.91 MW (Est from CMU)
(Estimated)
Loading map...