Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing last 508 of 508 unique locations - Page 1 of 21

Sort by: A-Z Components MW Date
Wytch Farm, Wareham BH20 5JR (1 component)

Two gas turbines (CX501-KB7) rated at 5.3MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
No capacity data
(Estimated)
Wormald Green, Land North of Sunnyside Gardens, Harrogate HG3 3RX (1 component)

8MW Energy Storage facility located in Harrogate.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Woodend Farm, Bigrigg, Cumbria, CA22 2TA (1 component)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
No capacity data
(Estimated)
Wolverhampton EfW Crown Street West Midlands WV1 1QB (1 component)
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 8.35MW
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 7.3MW. We have added covering letters on the following, change in registered address for WWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
No capacity data
(Estimated)
Woburn Sands HL, WOBURN SANDS HL, Off Woburn Sands Road, Woburn Sands, MILTON KEYNES, MK17 8RR, (2 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
1.63 MW (part of 1.63 MW aggregated CMU)
(Estimated)
Wixoe BS, WIXOE BS, Off Church Terrace, Wixoe, HALSTEAD Essex, CO10 8UA, (2 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
(Estimated)
Winteringham STW, INTERINGHAM STW, Ermine Street, Winteringham, LINCOLN, DN15 0AA, (2 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
(Estimated)
Windsor Road, Redditch, Worcestershire, B97 6EF (1 component)

The CMU is composed of two CHPs (ECOMAX® 15 NGS) with an electrical output capacity of 1.501 MWe each. The CMU will supply electricty on site to METTIS AEROSPACE LIMITED.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Wimbourne Bournemouth BH21 5EP (1 component)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (2 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
No capacity data
(Estimated)
Willow Farm Doncaster Road Tadcaster LS24 9PA (1 component)

New build power station comprised of multiple reciprocating engines.

Active • 2022-23 (T-4), 2019-20 (T-1)
No capacity data
(Estimated)
Willand reserve Power EX15 2PJ (1 component)

16MW gas fired engines provide back up power to the local grid

Active • 2019-20 (T-1)
No capacity data
(Estimated)
Whitwell Energy Park, Southfield Lane, Whitwell, Derbys S80 3LH (1 component)
• Gas reciprocating engines
• Reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.07 MW (Est from CMU) (part of 2.07 MW aggregated CMU)
(Estimated)
Whitton WTW, Whitton WTW, Thurleston Lane, IPSWICH, IP1 6TG, (2 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
(Estimated)
Whittington Rd, Barrow Hill, Chesterfield S43 2PW (2 components)

New reciprocating genset in acoustic enclosure

Inactive • 2020-21 (T-4), 2019-20 (T-1)
No capacity data
(Estimated)
Whilton STW, Anglian Water WRC, Whilton Locks, Whilton, NORTHAMPTON, NN11 2NH (2 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
(Estimated)
Wherstead WR, WHERSTEAD-WB, Track off 137 (op The Street), Wherstead, IPSWICH, IP9 2AP, (2 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
(Estimated)
Wheldale 2 Wheldale Road Castleford West Yorkshire WF10 2RT (1 component)

Gas reciprocating engines

Inactive • 2022-23 (T-4), 2019-20 (T-1)
No capacity data
(Estimated)
Weston WB, WESTON WB, High Road, Weston, SPALDING Lincolnshire, PE12 6RA, (2 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
(Estimated)
West Thurrock London Road, W THURROCK-LONDON RD SP, London Road, West Thurrock, GRAYS Essex, RM20 3LG (2 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
(Estimated)
West Pinchbeck WTW, WEST PINCHBECK WTW, Parsons Drove, West Pinchbeck, SPALDING Lincolnshire, PE11 3QW, (2 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
(Estimated)
West Marsh Road Spalding Lincolnshire PE11 3BB (2 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
259.70 MW (Est from CMU)
(Estimated)
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (2 components)
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2330.50 MW (Est from CMU)
(Estimated)
Watling Road Bishop Auckland DL14 9AS (1 component)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
No capacity data
(Estimated)
Warrington Hospital, Lovely Lane, Warrington, CheshireWA5 1QG (1 component)

1 x Natural Gas Fired CHP unit

Active • 2019-20 (T-1)
No capacity data
(Estimated)
Loading map...