Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing last 357 of 357 unique locations - Page 1 of 15

Sort by: A-Z Components MW Date
Yeomans Way, Bournemouth, BH8 0BQ (1 component)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
0.73 MW (part of 0.73 MW aggregated CMU)
(Estimated)
Wormald Green, Land North of Sunnyside Gardens, Harrogate HG3 3RX (1 component)

8MW Energy Storage facility located in Harrogate.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Worlds End, Forest Road, Hambledon, PO7 4QU (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2020-21 (T-1)
No capacity data
(Estimated)
Woodlands Centre, Composting Facility, Whitesmith, Lewes, East Sussex, BN8 6JD (1 component)

In- vessel composting facility. Heavy plant used to produce animal feed and garden compost that can be turned down for DSR.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Wolstanton Retail Park, Wolstanton, Newcastle, ST5 0AP (1 component)
• Import/Export metering with diesel generation at a retail store
• DSR Component providing load turn down at a retail store
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
0.87 MW (part of 0.87 MW aggregated CMU)
(Estimated)
Woburn Sands HL, WOBURN SANDS HL, Off Woburn Sands Road, Woburn Sands, MILTON KEYNES, MK17 8RR, (2 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
1.63 MW (part of 1.63 MW aggregated CMU)
(Estimated)
Wixoe BS, WIXOE BS, Off Church Terrace, Wixoe, HALSTEAD Essex, CO10 8UA, (2 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
(Estimated)
Winteringham STW, INTERINGHAM STW, Ermine Street, Winteringham, LINCOLN, DN15 0AA, (2 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
(Estimated)
Windsor Road, Redditch, Worcestershire, B97 6EF (1 component)

The CMU is composed of two CHPs (ECOMAX® 15 NGS) with an electrical output capacity of 1.501 MWe each. The CMU will supply electricty on site to METTIS AEROSPACE LIMITED.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Wincham Lane, Wincham, Northwich, CW9 6DE (1 component)

New build power station comprised of multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Whitwell Energy Park, Southfield Lane, Whitwell, Derbys S80 3LH (1 component)
• Gas reciprocating engines
• Reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.07 MW (Est from CMU) (part of 2.07 MW aggregated CMU)
(Estimated)
Whitton WTW, Whitton WTW, Thurleston Lane, IPSWICH, IP1 6TG, (2 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
(Estimated)
Whilton STW, Anglian Water WRC, Whilton Locks, Whilton, NORTHAMPTON, NN11 2NH (2 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
(Estimated)
Wherstead WR, WHERSTEAD-WB, Track off 137 (op The Street), Wherstead, IPSWICH, IP9 2AP, (2 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
(Estimated)
Weston WB, WESTON WB, High Road, Weston, SPALDING Lincolnshire, PE12 6RA, (2 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
(Estimated)
West Thurrock London Road, W THURROCK-LONDON RD SP, London Road, West Thurrock, GRAYS Essex, RM20 3LG (2 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
(Estimated)
West Street, Soberton, Southampton, SO32 3PH (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2020-21 (T-1)
No capacity data
(Estimated)
West Pinchbeck WTW, WEST PINCHBECK WTW, Parsons Drove, West Pinchbeck, SPALDING Lincolnshire, PE11 3QW, (2 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
(Estimated)
Waterswallows, Tunstead Quarry, Tunstead, Buxton, Derbyshire SK17 8TG (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
37.31 MW (Est from CMU)
(Estimated)
Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (1 component)

29MW of DSR

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
No capacity data
(Estimated)
Wansford Intake, WANSFORD INTAKE,  Track Off A47,  Sutton,  STAMFORD Lincolnshire,  PE8 6PN, (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
(Estimated)
Walderton, Walderton Pumping Station, Walderton, PO18 9EE (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2020-21 (T-1)
No capacity data
(Estimated)
WTI UK Ltd Parc Adfer, Weighbridge road, Deeside Industrial Estate zone 4, Flintshire, CH5 2LL (1 component)

An energy from waste facility located in North Wales and designed to generate electricity

Active • 2028-29 (T-4), 2023-24 (T-4) ...
45.66 MW (Est from CMU)
(Estimated)
WOLVERHAMPTON BATTERY STORAGE, 34 COMMERCIAL ROAD, WOLVERHAMPTON, WEST MIDLANDS, WV1 3RD (1 component)

4MW of DSR

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
No capacity data
(Estimated)
WELTON WW, WELTON WW, Hackthorn Road, Welton, LINCOLN, LN2 3PT (2 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
(Estimated)
Loading map...