Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing first 130 of 130 unique locations - Page 1 of 6

Sort by: A-Z Components MW Date
Covenbrook Hall, Stisted, Braintree, Essex, CM77 8AJ (1 component)

A new build diesel fuelled generating station.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Decoy Farm, Spalding Road, Crowland, Peterborough, PE6 0LX (1 component)

A new build gas fuelled generating station.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Dering Way, Gravesend, DA12 2QX (1 component)

CMU Component is 500kVA reciprocating diesel engine.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Ebbsfleet Farm, Ebbsfleet Ln, Ramsgate CT12 5DL (1 component)

A new build gas fuelled generating station.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Edwinstowe, Ollerton Road, NG22 9DX (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Essex Road, Hoddesdon,Herts, EN11 0DN (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Ex Gas Works Site Land west of Afan Way Port Talbot SA12 6HQ (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Fenton Ind Est ST4 2TE (1 component)

0.5 MW diesel gensets

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
First Renewable Beta Limited, Southam Road, Banbury OX16 2SN (1 component)

New build diesel or gas generating station.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Former Albert Mill Site, Barons Way, Blackburn, BB6 7DL, (1 component)

Gas fired reciprocating engines

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Former Depot West of Phoenix Mills, Nottingham Road, Long Eaton, Derbyshire NG10 2AA (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Garrison Road, Sheerness, ME12 1BU (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Gaywood Farm Hole Lane Edenbridge TN8 6SL (1 component)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Grain CHP Power Station Isle of Grain Rochester Kent ME3 0AR (1 component)

Gas-fired reciprocating engine

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Greys Hall, Greys Hall Corner, Great Cornard, Sudbury CO10 0QG (1 component)

A new build gas fuelled generating station.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
HULTON PARK, BOLTON, BL5 3JA (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Hallam way, Old Mill Lane Industrial Estate, Manfield, Woodhouse, Nottingham, NG19 9BG (1 component)

New reciprocating genset in acoustic enclosure.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Haslingbourne Lane Petworth GU28 0JH (1 component)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
High Common Lane, Rossington DN11 0HP (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Hill Field Charlcutt Calne Wiltshire SN11 9HL (1 component)

The CMU component at Leverton Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 9.975 MW export capacity and an import capacity of 4.75MW.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Hill Rd, Morecambe LA3, UK LA3 3PP (1 component)

47.5 MW power plant comprising gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Hirwaun House, Hirwaun Industrial Estate, Hirwaun CF44 9UL (1 component)

5 x 2.0 MW OCGT gas reciprocating engines

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Kings Barn Farm Steyning West Sussex BN44 3YR (1 component)

The CMU component at Kings Barn Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of …

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Kinoulton, Hickling Road, Kinoulton, Nottinghamshire NG12 3ED (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
No capacity data
(Estimated)
Loading map...