Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing first 229 of 229 unique locations - Page 1 of 10

Sort by: A-Z Components MW Date
10-14 Birmingham Road, West Bromwich, B71 4LD (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2021-22 (T-1)
No capacity data
(Estimated)
160 Corporation Road, Newport, Gwent, NP19 0WF (1 component)

0.39MW Battery Storage located at Newport Bus depot

Active • 2026-27 (T-4), 2024-25 (T-4) ...
6.42 MW (Est from CMU) (part of 6.42 MW aggregated CMU)
(Estimated)
195 Aylesone Rd, Leicester LE2 7QJ (2 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
2 Ford St, Coventry CV1 5WT (1 component)

1.2MW Battery Storage located at National Express Coventry

Active • 2024-25 (T-4), 2022-23 (T-1) ...
No capacity data
(Estimated)
4 Chemistry Ln, Pentre, Deeside, CH5 2DA (1 component)
• Peak power plant
• Reciprocating engine
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
53 Valley Road Plymouth PL7 1RF (2 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
4.75 MW (Est from CMU)
(Estimated)
530 London Road, Croydon, CR7 7YE (1 component)

Gas fired CHP unit

Active • 2024-25 (T-1), 2023-24 (T-1) ...
5.63 MW (Est from CMU)
(Estimated)
66 Molesworth Street, London SE13 7EY (3 components)
• CHP plant
• Behind the Meter CHP Unit
• Gas fired CHP unit
Active • 2025-26 (T-1), 2024-25 (T-1) ...
20.29 MW (Est from CMU)
(Estimated)
7 COWLEY WAY CREWE CW1 6AE (1 component)

CMU consisting of multiple gas reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-1) ...
10.25 MW (Est from CMU)
(Estimated)
Aaron Road Industrial Estate Peterborough Cambridgeshire PE7 2EX (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
7.12 MW (Est from CMU)
(Estimated)
Aber Park Road, Flint Flintshire CH6 5EX (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2024-25 (T-4), 2021-22 (T-1)
0.71 MW (Est from CMU)
(Estimated)
Adsworth Road, Stockport, SK3 8LF (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2021-22 (T-1)
No capacity data
(Estimated)
Applied Automation Eastern Wood Road Langage Industrial Estate PL7 5ET (2 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
4.04 MW (Est from CMU)
(Estimated)
Ardagh Group - Barnsely Site 1, Burton Road, Monk Bretton South Yorkshire S71 5RP (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2025-26 (T-4) ...
16.24 MW (Est from CMU) (part of 16.24 MW aggregated CMU)
(Estimated)
Ardochrig Substation, off Ardochrig Road, Whitelee Windfarm, South Lanarkshire, G75 0QN (1 component)
• 1 x 50MW Lithium-ion batteryw with duration of 1 hour
• 1 x 50MW Lithium-ion battery with duration of 1 hour
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
10.68 MW (Est from CMU)
(Estimated)
Ashland Cottage Farm, Beck Lane, Sutton in Ashfield, NG17 3AH (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-1) ...
30.46 MW (Est from CMU)
(Estimated)
Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU (2 components)
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
• Twin stream Energy from Waste plant with a connection capacity of 37.216MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and an expected export of 36MW. Located in the Chittering Industrial Estate in Avonmouth.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
32.61 MW (Est from CMU)
(Estimated)
BOC Brinsworth, Bawtry Road, Brinsworth, Rotherham, S60 5NT (2 components)
• Industrial Gases production processes. DSR delivered through process interruption
• Industrial Gases production site. DSR delivered through reduction of import at site boundary, primarily process interruption.
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
49.68 MW (Est from CMU) (part of 49.68 MW aggregated CMU)
(Estimated)
BOC Fawley, Cadland Road, Hythe, SO45 3NX (2 components)
• Industrial Gases production processes. DSR delivered through process interruption
• Industrial Gases production processes. DSR delivered through reduction of import at site boundary, primarily process interruption.
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
49.68 MW (Est from CMU) (part of 49.68 MW aggregated CMU)
(Estimated)
BOC Margam, Longlands Lane, Port Talbot, SA13 2NS (2 components)
• Industrial Gases production processes. DSR delivered through process interruption
• Industrial Gases production site. DSR delivered through reduction of import at site boundary, primarily through process interruption.
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
80.96 MW (Est from CMU) (part of 80.96 MW aggregated CMU)
(Estimated)
BOC Middlesbrough, Teessdock Road, Grangetown, TS6 7RT (2 components)
• Industrial Gases production site. DSR provided through process interruption.
• Industrial Gases production site. DSR delivered through reduction of import at site boundary, primarily through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
80.96 MW (Est from CMU) (part of 80.96 MW aggregated CMU)
(Estimated)
BOC Motherwell, Chapelknowle Road, Carfin, ML1 5LF (2 components)
• Industrial Gases production processes. DSR delivered through process interruption
• Industrial Gases production processes. DSR delivered through reduction of import at site boundary, primarily process interruption.
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
40.48 MW (Est from CMU) (part of 40.48 MW aggregated CMU)
(Estimated)
BOC Scunthorpe, Warren Road, Scunthorpe, DN15 6XH (2 components)
• Industrial Gases production processes. DSR delivered through process interruption
• Industrial Gases production site. DSR delivered through reduction of import at site boundary, primarily through process interruption.
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
80.96 MW (Est from CMU) (part of 80.96 MW aggregated CMU)
(Estimated)
BPI. Films - Bromborough, 40 Thursby Road, Croft Business Park, Bromborough, CH62 3PZ (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
18.01 MW (Est from CMU) (part of 18.01 MW aggregated CMU)
(Estimated)
BPI. Industrial - Ardeer, Lundholm Road, Ardeer, Stevenston, Ayrshire, KA20 3NQ (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-1)
No capacity data
(Estimated)
Loading map...