Showing last 1255 of 1255 unique locations - Page 1 of 51

Sort by: A-Z Components MW Date
land adj West Melton Electricity substation Elsecar Road Brampton Bierlow, S63 6AG (1 component)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
No capacity data
(Estimated)
entre Bailey Road,Central Park, Rugby CV23 0PD (1 component)
• Load curtailment & standby generation
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
(Estimated)
bournville place, Bournville Ln, Birmingham B30 2LU, UK (1 component)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
No capacity data
(Estimated)
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (4 components)
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
No capacity data
(Estimated)
Yorkshire Way, Armthorpe, Doncaster DN3 3GW (1 component)

Behind-the-meter battery storage system at IKEA's Doncaster distribution centre

Inactive • 2021-22 (T-4)
No capacity data
(Estimated)
Yeomans Way, Bournemouth, BH8 0BQ (1 component)

DSR component offering load turn down at a retail store

Inactive • 2021-22 (T-4)
No capacity data
(Estimated)
No capacity data
(Estimated)
Yard (see map) near to 137 Netherton Street, Wishaw, ML2 0EY (1 component)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
(Estimated)
YEWTREE HOUSE, CROXALL ROAD, ALREWAS, BURTON ON TRENT, STAFFORDSHIRE, DE13 7BA (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
(Estimated)
Wytch Farm, Wareham BH20 5JR (1 component)

Two gas turbines (CX501-KB7) rated at 5.3MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
No capacity data
(Estimated)
Wylfa Site Cemas Ynys Môn LL67 0DH (1 component)

Wylfa Nuclear power station is a Magnox power station standing on a 20.8 hectare site on the north coast of Anglesey between Holyhead and Amlwch (address is Wylfa Site- Cemas- …

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
(Estimated)
Wrexham Industrial Estate Wrexham LL13 9UG (1 component)

Load reduction

Active • 2025-26 (T-4), 2022-23 (T-4) ...
1.02 MW (Est from CMU) (part of 1.02 MW aggregated CMU)
(Estimated)
Wordsworth Crushing Limited, Whaley Road, Barugh, Barnsley S75 1FJ (1 component)

The CMU Component will be made up of gas fired engines.

Inactive • 2021-22 (T-4)
No capacity data
(Estimated)
No capacity data
(Estimated)
Woodlands Centre, Composting Facility, Whitesmith, Lewes, East Sussex, BN8 6JD (1 component)

In- vessel composting facility. Heavy plant used to produce animal feed and garden compost that can be turned down for DSR.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (1 component)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
9.05 MW (Est from CMU)
(Estimated)
Wolverhampton Powerhouse, Commercial Road, Wolverhampton WV1 3QS (2 components)
• A 4MW generating gas grid support plant.
• A 4MW generating grid support plant.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
(Estimated)
Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (1 component)
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
29.17 MW
(Estimated)
Wolverhampton EfW Crown Street West Midlands WV1 1QB (1 component)
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 8.35MW
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 7.3MW. We have added covering letters on the following, change in registered address for WWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
No capacity data
(Estimated)
Wolstanton Retail Park, Wolstanton, Newcastle, ST5 0AP (1 component)
• Import/Export metering with diesel generation at a retail store
• DSR Component providing load turn down at a retail store
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
0.87 MW (part of 0.87 MW aggregated CMU)
(Estimated)
No capacity data
(Estimated)
No capacity data
(Estimated)
Loading map...