Showing last 732 of 732 unique locations - Page 1 of 30

Sort by: A-Z Components MW Date
land to the east of Worset Lane, Hartlepool, TS27 3BG (2 components)

A new build, gas fuelled generation station.

Active • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
land adjacent to Netherlands Way / Europa Way Stallingborough Grimsby DN41 8DT (1 component)

10 x 2MW gas reciprocating engines

Active • 2023-24 (T-4), 2022-23 (T-3)
No capacity data
(Estimated)
bournville place, Bournville Ln, Birmingham B30 2LU, UK (1 component)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
No capacity data
(Estimated)
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (4 components)
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
No capacity data
(Estimated)
XPO - Warrington, 48 Hardwick Grange, Woolston, Warrington WA1 4RF, United Kingdom (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
No capacity data
(Estimated)
XPO - Southampton, Goodward Road, Eastleigh, SO50 4NT (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2025-26 (T-4) ...
11.96 MW (Est from CMU) (part of 11.96 MW aggregated CMU)
(Estimated)
XPO - Logistics Luton, Skimpot Road, Luton LU4 0JD (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2024-25 (T-4) ...
17.61 MW (Est from CMU) (part of 17.61 MW aggregated CMU)
(Estimated)
XPO - Logistics Bedworth, St. Davids Way, Bermuda Park, Nuneaton, Warwickshire CV10 7SD  (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2024-25 (T-4) ...
17.61 MW (Est from CMU) (part of 17.61 MW aggregated CMU)
(Estimated)
XPO - Easton, Easton, Grantham, NG33 5AU (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2024-25 (T-4) ...
11.60 MW (Est from CMU) (part of 11.60 MW aggregated CMU)
(Estimated)
Wrexham Industrial Estate Wrexham LL13 9UG (1 component)

Load reduction

Active • 2025-26 (T-4), 2022-23 (T-4) ...
1.02 MW (Est from CMU) (part of 1.02 MW aggregated CMU)
(Estimated)
Wormald Green, Land North of Sunnyside Gardens, Harrogate HG3 3RX (1 component)

8MW Energy Storage facility located in Harrogate.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Woodlands Centre, Composting Facility, Whitesmith, Lewes, East Sussex, BN8 6JD (1 component)

In- vessel composting facility. Heavy plant used to produce animal feed and garden compost that can be turned down for DSR.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (1 component)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
9.05 MW (Est from CMU)
(Estimated)
Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (1 component)
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
29.17 MW
(Estimated)
Windsor Road, Redditch, Worcestershire, B97 6EF (1 component)

The CMU is composed of two CHPs (ECOMAX® 15 NGS) with an electrical output capacity of 1.501 MWe each. The CMU will supply electricty on site to METTIS AEROSPACE LIMITED.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Wincham Lane, Wincham, Northwich, CW9 6DE (1 component)

New build power station comprised of multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Wimbourne Bournemouth BH21 5EP (1 component)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Wight Salads Arreton Newport Isle of Wight PO30 3AR (1 component)

The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used

Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
5.48 MW (Est from CMU)
(Estimated)
Whitwell Energy Park, Southfield Lane, Whitwell, Derbys S80 3LH (1 component)
• Gas reciprocating engines
• Reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.07 MW (Est from CMU) (part of 2.07 MW aggregated CMU)
(Estimated)
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (1 component)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …

Active • 2025-26 (T-4), 2024-25 (T-4) ...
No capacity data
(Estimated)
No capacity data
(Estimated)
6.22 MW (Est from CMU)
(Estimated)
104.35 MW (Est from CMU)
(Estimated)
Westerham Road Sundridge Kent TN14 6ED (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2023-24 (T-4), 2022-23 (T-3)
No capacity data
(Estimated)
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (1 component)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. …

Active • 2026-27 (T-4), 2025-26 (T-4) ...
2154.60 MW (Est from CMU)
(Estimated)