Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing last 873 of 873 unique locations - Page 1 of 35

Sort by: A-Z Components MW Date
land to the east of Worset Lane, Hartlepool, TS27 3BG (2 components)

A new build, gas fuelled generation station.

Active • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
No capacity data
(Estimated)
land adj West Melton Electricity substation Elsecar Road Brampton Bierlow, S63 6AG (1 component)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
No capacity data
(Estimated)
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (4 components)
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
No capacity data
(Estimated)
XPO Lowestoft Mobbs Way, Lowestoft NR32 3BN, United Kingdom (1 component)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2026-27 (T-4) ...
9.14 MW (Est from CMU) (part of 9.14 MW aggregated CMU)
(Estimated)
Wytch Farm, Wareham BH20 5JR (1 component)

Two gas turbines (CX501-KB7) rated at 5.3MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
No capacity data
(Estimated)
Wrexham Industrial Estate Wrexham LL13 9UG (1 component)

Load reduction

Active • 2025-26 (T-4), 2022-23 (T-4) ...
1.02 MW (Est from CMU) (part of 1.02 MW aggregated CMU)
(Estimated)
Wormald Green, Land North of Sunnyside Gardens, Harrogate HG3 3RX (1 component)

8MW Energy Storage facility located in Harrogate.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Woodlands Centre, Composting Facility, Whitesmith, Lewes, East Sussex, BN8 6JD (1 component)

In- vessel composting facility. Heavy plant used to produce animal feed and garden compost that can be turned down for DSR.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (1 component)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
9.05 MW (Est from CMU)
(Estimated)
Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (1 component)
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
29.17 MW
(Estimated)
207.86 MW (Est from CMU)
(Estimated)
No capacity data
(Estimated)
Windsor Road, Redditch, Worcestershire, B97 6EF (1 component)

The CMU is composed of two CHPs (ECOMAX® 15 NGS) with an electrical output capacity of 1.501 MWe each. The CMU will supply electricty on site to METTIS AEROSPACE LIMITED.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Windmill Hill Business Park, Swindon, SN5 6QR (1 component)
• Load curtailment and standby generation
• Load reduction via standby generation taking onsite load
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
No capacity data
(Estimated)
Wincham Lane, Wincham, Northwich, CW9 6DE (1 component)

New build power station comprised of multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Wimbourne Bournemouth BH21 5EP (1 component)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Willow Holme Road, Carlisle, CA3 9PF (1 component)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4)
No capacity data
(Estimated)
Willow Farm Doncaster Road Tadcaster LS24 9PA (1 component)

New build power station comprised of multiple reciprocating engines.

Active • 2022-23 (T-4), 2019-20 (T-1)
No capacity data
(Estimated)
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP (1 component)
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire. Metering of output is Net of auxillary load.
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
• Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
720.00 MW (Est from CMU)
(Estimated)
Wichling Pumping Station, Syndal Bottom, Sittingbourne, ME9 0BL (1 component)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
No capacity data
(Estimated)
Whitwell Energy Park, Southfield Lane, Whitwell, Derbys S80 3LH (1 component)
• Gas reciprocating engines
• Reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.07 MW (Est from CMU) (part of 2.07 MW aggregated CMU)
(Estimated)
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (1 component)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …

Active • 2025-26 (T-4), 2024-25 (T-4) ...
No capacity data
(Estimated)
No capacity data
(Estimated)
Loading map...