Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing first 975 of 975 unique locations - Page 1 of 39

Sort by: A-Z Components MW Date
'The Black Shed', Belleknowes Industrial Estate, Inverkeithing, KY11 1HY (1 component)

A new build, gas fuelled generation station.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
37.95 MW (Est from CMU)
(Estimated)
*Please see cover letter regarding postcode Aberarder Wind Farm, Aberarder Estate, Strathnairn, Highland Scotland (1 component)

New build wind farm at Aberarder consisting of 12 wind turbines.

Active • 2023-24 (T-4), 2022-23 (T-3)
4.10 MW (Est from CMU)
(Estimated)
*Please see cover letter regarding postcode Blary Hill wind farm, Off C20 road (Barr Glen Road), Glenbarr, Tarbert, Scotland, UK (1 component)

New build wind farm at Blary Hill consisting of 14 wind turbines.

Active • 2023-24 (T-4), 2022-23 (T-3)
2.87 MW (Est from CMU)
(Estimated)
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (1 component)

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 …

Active • 2024-25 (T-4), 2023-24 (T-4) ...
2.14 MW (Est from CMU)
(Estimated)
1 Ratty's Lane, Hoddesdon, Hertsfordshire, EN11 0RF (1 component)

Combined Cycle Gas Turbine

Active • 2023-24 (T-4), 2022-23 (T-3)
No capacity data
(Estimated)
1 Rivington Rd, Preston Brook, Runcorn WA7 3DP, United Kingdom (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
48.29 MW (Est from CMU) (part of 48.29 MW aggregated CMU)
(Estimated)
1 Waterfront Avenue, Edinburgh, EH5 1SG (2 components)
• Office site with behind the meter back up generation
• Office site with behind the meter generation
• Office site with behind the meter generation.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
0.81 MW (Est from CMU) (part of 0.81 MW aggregated CMU)
(Estimated)
53.56 MW (Est from CMU)
(Estimated)
1020 Slutchers Lane, Centre Park, Warrington, WA1 1QL (1 component)
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
59.66 MW (Est from CMU)
(Estimated)
132 Manchester Road, Carrington, Manchester, M31 4AY (1 component)
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
• New combined cycle gas turbine unit comprising the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed on Carrington Manchester
• 5 x 9.98MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
Active • 2027-28 (T-4), 2024-25 (T-4) ...
1761.93 MW (Est from CMU)
(Estimated)
133 Balornock Road, Glasgow, G21 3UW (1 component)

Generators on hospital site

Active • 2024-25 (T-1), 2023-24 (T-4) ...
13.41 MW (Est from CMU) (part of 13.41 MW aggregated CMU)
(Estimated)
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (2 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• CMU consisting of multiple reciprocating engines and alternators
Active • 2024-25 (T-4), 2023-24 (T-4) ...
9.68 MW (Est from CMU)
(Estimated)
15-17 Deer Park Rd, Moulton Park Industrial Estate, Northampton NN3 6RX, United Kingdom (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
160 Ipswich Road, Stoke Holy Cross, Norwich NR14 8PQ, UK (1 component)
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
167 - 600 Hollands Recycling, Bentley Road South, Darlaston, WS10 8LN (1 component)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
174 - 601 Farnham Road, Upper Froyle, Alton, GU34 4JD (1 component)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
3.07 MW (Est from CMU) (part of 3.07 MW aggregated CMU)
(Estimated)
19 Howard Road, Park Farm Industrial Estate, Redditch, Worcestershire, B98 7SE (1 component)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have an import capacity of 4000kVa and an export capacity …

Active • 2023-24 (T-4), 2022-23 (T-3)
No capacity data
(Estimated)
195 Aylesone Rd, Leicester LE2 7QJ (2 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (1 component)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.23 MW (Est from CMU)
(Estimated)
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (1 component)
• Operational Reciprocating Engine
• Operational gas reciprocating engine.
• New build gas generator
Active • 2028-29 (T-4), 2024-25 (T-4) ...
11.29 MW (Est from CMU)
(Estimated)
24-25 Eastern Way, Bury St Edmunds, IP32 7AD (1 component)

CHP Unit

Active • 2025-26 (T-4), 2025-26 (T-1) ...
43.69 MW (Est from CMU)
(Estimated)
24a Flightway Dunkeswell Honiton EX14 4LG (1 component)

New Build Generating CMU comprising of a battery storage asset

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
2600 John Smith Drive, Oxford, OX4 2JY (2 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Active • 2024-25 (T-4), 2023-24 (T-4) ...
No capacity data
(Estimated)
3 Longwalk Road, Stockley Park, Uxbridge, UB11 1AW (1 component)
• DSR Component providing load turn down at a retail store
• Import/Export metering with diesel generation at a retail store
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
0.77 MW (Est from CMU) (part of 0.77 MW aggregated CMU)
(Estimated)
3 Opal Way, Stone ST15 0BQ, UK (1 component)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
No capacity data
(Estimated)
Loading map...