Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing last 975 of 975 unique locations - Page 1 of 39

Sort by: A-Z Components MW Date
land to the east of Worset Lane, Hartlepool, TS27 3BG (2 components)

A new build, gas fuelled generation station.

Active • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
land adjacent to Netherlands Way / Europa Way Stallingborough Grimsby DN41 8DT (1 component)

10 x 2MW gas reciprocating engines

Active • 2023-24 (T-4), 2022-23 (T-3)
No capacity data
(Estimated)
bournville place, Bournville Ln, Birmingham B30 2LU, UK (1 component)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
No capacity data
(Estimated)
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (4 components)
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
No capacity data
(Estimated)
Yearsley Coleshill, Coleshill, Birmingham B46 1JU (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.76 MW (Est from CMU) (part of 17.76 MW aggregated CMU)
(Estimated)
Yearsley - Seaham, Fox Cover industrial Est, Admiralty Way, Dawdon, Seaham SR7 7DN, United Kingdom (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
23.19 MW (Est from CMU) (part of 23.19 MW aggregated CMU)
(Estimated)
Yearsley - Belle Eau Park, Belle Eau Park, Bilsthorpe, Newark NG22 8TX, UK (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
29.79 MW (Est from CMU) (part of 29.79 MW aggregated CMU)
(Estimated)
XPO Lowestoft Mobbs Way, Lowestoft NR32 3BN, United Kingdom (1 component)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2026-27 (T-4) ...
9.14 MW (Est from CMU) (part of 9.14 MW aggregated CMU)
(Estimated)
XPO - Warrington, 48 Hardwick Grange, Woolston, Warrington WA1 4RF, United Kingdom (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
No capacity data
(Estimated)
XPO - Taunton, 29 Frobisher Way, Taunton TA2 6BB (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
29.21 MW (Est from CMU) (part of 29.21 MW aggregated CMU)
(Estimated)
XPO - Southampton, Goodward Road, Eastleigh, SO50 4NT (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2025-26 (T-4) ...
11.96 MW (Est from CMU) (part of 11.96 MW aggregated CMU)
(Estimated)
XPO - Plymouth, Estover Road, Plymouth, Devon, PL6 7PF (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
23.19 MW (Est from CMU) (part of 23.19 MW aggregated CMU)
(Estimated)
XPO - Logistics Luton, Skimpot Road, Luton LU4 0JD (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2024-25 (T-4) ...
17.61 MW (Est from CMU) (part of 17.61 MW aggregated CMU)
(Estimated)
XPO - Logistics Bedworth, St. Davids Way, Bermuda Park, Nuneaton, Warwickshire CV10 7SD  (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2024-25 (T-4) ...
17.61 MW (Est from CMU) (part of 17.61 MW aggregated CMU)
(Estimated)
XPO - Easton, Easton, Grantham, NG33 5AU (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2024-25 (T-4) ...
11.60 MW (Est from CMU) (part of 11.60 MW aggregated CMU)
(Estimated)
Wormald Green, Land North of Sunnyside Gardens, Harrogate HG3 3RX (1 component)

8MW Energy Storage facility located in Harrogate.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Woodlands Centre, Composting Facility, Whitesmith, Lewes, East Sussex, BN8 6JD (1 component)

In- vessel composting facility. Heavy plant used to produce animal feed and garden compost that can be turned down for DSR.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (1 component)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
9.05 MW (Est from CMU)
(Estimated)
Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (1 component)
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
29.17 MW
(Estimated)
207.86 MW (Est from CMU)
(Estimated)
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (1 component)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
232.80 MW (Est from CMU)
(Estimated)
Windsor Road, Redditch, Worcestershire, B97 6EF (1 component)

The CMU is composed of two CHPs (ECOMAX® 15 NGS) with an electrical output capacity of 1.501 MWe each. The CMU will supply electricty on site to METTIS AEROSPACE LIMITED.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Wincham Lane, Wincham, Northwich, CW9 6DE (1 component)

New build power station comprised of multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Wimbourne Bournemouth BH21 5EP (1 component)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Wilmington WTW, Powder Mill Lane, Wilmington, Dartford, United Kingdom, DA1 1NT (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.09 MW (Est from CMU) (part of 4.09 MW aggregated CMU)
(Estimated)
Loading map...