Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing first 4671 of 4671 unique locations - Page 1 of 187

Sort by: A-Z Components MW Date
(TEESSIDE), ORMESBY PUMPING STATION, MIDDLESBROUGH, CLEVELAND,TS7 9JH (1 component)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW (Est from CMU) (part of 3.74 MW aggregated CMU)
(Estimated)
1 Rivington Rd, Preston Brook, Runcorn WA7 3DP, United Kingdom (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
48.29 MW (Est from CMU) (part of 48.29 MW aggregated CMU)
(Estimated)
1 Thane Road West, Nottingham, NG2 3AA (1 component)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
101.02 MW (Est from CMU)
(Estimated)
100 Cathcart Rd, Glasgow G42 7BH (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2025-26 (T-1) ...
10.11 MW (Est from CMU)
(Estimated)
133 Balornock Road, Glasgow, G21 3UW (1 component)

Generators on hospital site

Active • 2024-25 (T-1), 2023-24 (T-4) ...
13.41 MW (Est from CMU) (part of 13.41 MW aggregated CMU)
(Estimated)
1345 Govan Rd., Glasgow, G51 4TF (1 component)

CHPs at Queen Elizabeth Hospital

Active • 2024-25 (T-1), 2023-24 (T-1) ...
8.60 MW (Est from CMU)
(Estimated)
2 Engineers Way, Wembley, Middlesex, HA9 0JS (1 component)

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
24.98 MW (Est from CMU)
(Estimated)
2 Samworth Way, Melton Mowbray LE13 1GA (1 component)

Existing Generation on existing site - CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.34 MW (Est from CMU)
(Estimated)
20 Marine Esplanade, Leith Docks, Leith, EH6 7LU (1 component)

1x diesel generator with a total rated gross power capacity of 2.900 MW

Active • 2024-25 (T-1)
No capacity data
(Estimated)
23 Whittle Road, Ferndale Industrial Estate, Wimborne, BH21 7PW (1 component)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2024-25 (T-1) ...
19.28 MW (Est from CMU)
(Estimated)
301 Camberwell New Rd, Camberwell, London, SE5 0TF (2 components)
• Battery Storage and demand reduction located at Abellio Walworth bus depot
• 1.26MW Battery Storage located at Abellio Walworth depot
• Bus depot site
Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.58 MW (Est from CMU) (part of 7.58 MW aggregated CMU)
(Estimated)
318 Edinburgh Rd, Brakes Newhouse, Motherwell, ML1 5SY, United Kingdom (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.05 MW (Est from CMU) (part of 18.05 MW aggregated CMU)
(Estimated)
4 Norman Rd, Belvedere DA17 6LD (1 component)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
5.33 MW (Est from CMU) (part of 5.33 MW aggregated CMU)
(Estimated)
5 Greenock Rd, Inchinnan, Renfrew PA4 9PG (2 components)

Bus depot site

Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.29 MW (Est from CMU)
(Estimated)
530 London Road, Croydon, CR7 7YE (1 component)

Gas fired CHP unit

Active • 2024-25 (T-1), 2023-24 (T-1) ...
5.63 MW (Est from CMU)
(Estimated)
6 Firswood Rd, Lathom, Skelmersdale WN8 8UT (1 component)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
5.33 MW (Est from CMU) (part of 5.33 MW aggregated CMU)
(Estimated)
66 Molesworth Street, London SE13 7EY (3 components)
• CHP plant
• Behind the Meter CHP Unit
• Gas fired CHP unit
Active • 2025-26 (T-1), 2024-25 (T-1) ...
20.29 MW (Est from CMU)
(Estimated)
AB10 (2 components)
• Domestic demand turn down
• Domestic EV charger
Active • 2024-25 (T-4), 2024-25 (T-1)
28.21 MW (Est from CMU) (part of 28.21 MW aggregated CMU)
(Estimated)
AB11 (1 component)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-4) ...
14.08 MW (Est from CMU) (part of 14.08 MW aggregated CMU)
(Estimated)
AB12 (2 components)
• Domestic demand turn down
• Domestic EV charger
Active • 2027-28 (T-4), 2025-26 (T-4) ...
54.45 MW (Est from CMU) (part of 54.45 MW aggregated CMU)
(Estimated)
AB14 (2 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
36.75 MW (Est from CMU) (part of 36.75 MW aggregated CMU)
(Estimated)
AB15 (4 components)
• Domestic demand turn down
• Domestic EV charger
• Domestic EV charge point
Active • 2027-28 (T-4), 2025-26 (T-4) ...
270.71 MW (Est from CMU) (part of 270.71 MW aggregated CMU)
(Estimated)
AB21 (3 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
56.39 MW (Est from CMU) (part of 56.39 MW aggregated CMU)
(Estimated)
AB22 (3 components)
• Domestic EV
• Domestic demand turn down
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
18.91 MW (Est from CMU) (part of 18.91 MW aggregated CMU)
(Estimated)
Loading map...