Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing first 2849 of 2849 unique locations - Page 1 of 114

Sort by: A-Z Components MW Date
"Mercia EnvirRecover EfW Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB" (1 component)
• This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 MW grid connection size, in line with rule 3.5.3 using historic data. Mercia Waste Management Ltd 250kT Energy from Waste plant with c. 19MW electrical output net. Auxilliary load is not included in connection capacity .i.e the export is net.
• Mercia Waste Management Ltd Hartlebury Trading Estate Kidderminster DY10 4JB. In build Energy from Waste plant in Hartlebury. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
168.99 MW (Est from CMU)
(Estimated)
'The Black Shed', Belleknowes Industrial Estate, Inverkeithing, KY11 1HY (1 component)

A new build, gas fuelled generation station.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
37.95 MW (Est from CMU)
(Estimated)
1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD (2 components)
• CMU FES002 which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 8MW. The CMU is located at: 1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD.
• AN 8MW new build gas generating station..
Active • 2024-25 (T-4)
15.24 MW (Est from CMU)
(Estimated)
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (1 component)

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 …

Active • 2024-25 (T-4), 2023-24 (T-4) ...
2.14 MW (Est from CMU)
(Estimated)
1 Waterfront Avenue, Edinburgh, EH5 1SG (2 components)
• Office site with behind the meter back up generation
• Office site with behind the meter generation
• Office site with behind the meter generation.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
0.81 MW (Est from CMU) (part of 0.81 MW aggregated CMU)
(Estimated)
10-14 Birmingham Road, West Bromwich, B71 4LD (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2021-22 (T-1)
No capacity data
(Estimated)
100 Montifichet Road, Westfield, Stratford E20 1GR (2 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
52.51 MW (Est from CMU)
(Estimated)
11 BURSOM ROAD, LEICESTER, LE4 1BS (1 component)

2.52MW Battery Storage located at PepsiCo Leicester factory

Active • 2024-25 (T-4)
8.69 MW (Est from CMU)
(Estimated)
111 Brancroft Way Enfield Middlesex EN3 7PL (1 component)

Enfield CCGT Power Station - (one unit station)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1595.21 MW (Est from CMU)
(Estimated)
132 Manchester Road, Carrington, Manchester, M31 4AY (1 component)
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
• New combined cycle gas turbine unit comprising the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed on Carrington Manchester
• 5 x 9.98MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
Active • 2027-28 (T-4), 2024-25 (T-4) ...
1761.93 MW (Est from CMU)
(Estimated)
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (2 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• CMU consisting of multiple reciprocating engines and alternators
Active • 2024-25 (T-4), 2023-24 (T-4) ...
9.68 MW (Est from CMU)
(Estimated)
160 Corporation Road, Newport, Gwent, NP19 0WF (1 component)

0.39MW Battery Storage located at Newport Bus depot

Active • 2026-27 (T-4), 2024-25 (T-4) ...
6.42 MW (Est from CMU) (part of 6.42 MW aggregated CMU)
(Estimated)
17 Oak Tree Road, Fen Drayton, Cambridge, CB24 4SS (1 component)

2 x gas fired CHP generators located at a horticultural site.

Active • 2028-29 (T-4), 2024-25 (T-4)
5.48 MW (Est from CMU)
(Estimated)
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (1 component)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.23 MW (Est from CMU)
(Estimated)
2 Bar Lane, York, YO51 9LS (1 component)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Active • 2028-29 (T-4), 2027-28 (T-4) ...
45.41 MW (Est from CMU) (part of 45.41 MW aggregated CMU)
(Estimated)
2 Ford St, Coventry CV1 5WT (1 component)

1.2MW Battery Storage located at National Express Coventry

Active • 2024-25 (T-4), 2022-23 (T-1) ...
No capacity data
(Estimated)
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (1 component)
• Operational Reciprocating Engine
• Operational gas reciprocating engine.
• New build gas generator
Active • 2028-29 (T-4), 2024-25 (T-4) ...
11.29 MW (Est from CMU)
(Estimated)
24-25 Eastern Way, Bury St Edmunds, IP32 7AD (1 component)

CHP Unit

Active • 2025-26 (T-4), 2025-26 (T-1) ...
43.69 MW (Est from CMU)
(Estimated)
2600 John Smith Drive, Oxford, OX4 2JY (2 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Active • 2024-25 (T-4), 2023-24 (T-4) ...
No capacity data
(Estimated)
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (1 component)
• District heating implementation of two gas CHP engines with no auxilliary load
• Two 3.0 MW gas CHP engines. Primary fuel type = Natural Gas
Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.08 MW (Est from CMU)
(Estimated)
4 Finway Road Hemel Hempstead HP2 7PT (1 component)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.23 MW (Est from CMU)
(Estimated)
46 Station Road Stokesley Middlesbrough TS9 7AA (2 components)
• Gas CHP engines in commercial horticultural usage with no auxilliary load
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
Active • 2027-28 (T-4), 2025-26 (T-4) ...
20.43 MW (Est from CMU)
(Estimated)
60-70 Reach Road Burwell CB25 0AH (2 components)
• 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
• 10MW of onshore wind generation
• 49.900MW storage installation
Active • 2024-25 (T-4)
29.34 MW (Est from CMU)
(Estimated)
7 COWLEY WAY CREWE CW1 6AE (1 component)

CMU consisting of multiple gas reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-1) ...
10.25 MW (Est from CMU)
(Estimated)
7 Market Street, Manchester, M1 1WT (1 component)
• DSR Component providing load turn down at a retail store
• Import/Export metering with diesel generation at a retail store
Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.35 MW (Est from CMU) (part of 3.35 MW aggregated CMU)
(Estimated)
Loading map...