Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing last 4126 of 4126 unique locations - Page 1 of 166

Sort by: A-Z Components MW Date
to be provided after the auction (1 component)

domestic demand turn down

Active • 2028-29 (T-4), 2025-26 (T-1)
15.00 MW (Est from CMU)
(Estimated)
to be provided after auction (1 component)

domestic demand turn down

Active • 2028-29 (T-4), 2025-26 (T-1)
15.00 MW (Est from CMU)
(Estimated)
provided after auction (1 component)
• domestic demand turn down
• domestic demand DSR
Active • 2028-29 (T-4), 2025-26 (T-1)
2738.05 MW (Est from CMU)
(Estimated)
not known (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2025-26 (T-1)
454.98 MW (Est from CMU)
(Estimated)
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (1 component)
• A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity.
• A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
15.25 MW (Est from CMU)
(Estimated)
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (2 components)
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
• Battery Storage plant
• Gas reciprocating engines
Active • 2027-28 (T-4), 2026-27 (T-4) ...
286.73 MW
(Estimated)
land at Keelings Road, Southminster, CM0 7JF (1 component)
• New build generating CMU component known as Dengie Solar Park
• New build generating CMU component known as Dengie BESS
Active • 2027-28 (T-4), 2025-26 (T-1)
4.43 MW
(Estimated)
enfinium Skelton Grange Limited South Road Knowsthorpe Leeds LS10 1RR (1 component)

SG is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network.

Active • 2027-28 (T-4), 2025-26 (T-1)
86.46 MW (Est from CMU)
(Estimated)
adjacent to Kilmarnock South Substation KA1 3TN (1 component)

Lithium ion battery storage plant

Active • 2026-27 (T-4), 2025-26 (T-1)
107.51 MW
(Estimated)
Young's House, Wickham Road, Grimsby DN32 8HW (1 component)
• On-site Generating CMU
• on site generating CMU
Active • 2028-29 (T-4), 2025-26 (T-1) ...
30.13 MW (Est from CMU) (part of 30.13 MW aggregated CMU)
(Estimated)
York Road, Stevenage, Hertfordshire, SG1 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW (Est from CMU) (part of 8.23 MW aggregated CMU)
(Estimated)
Yardley Close, Corby, NN17 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
1.21 MW (part of 1.21 MW aggregated CMU)
(Estimated)
YWA CENTRAL DIVISION ECCUP WTW, ECCUP MOOR ROAD, LEEDS, WEST YORKSHIRE, LS16 8AW (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
No capacity data
(Estimated)
YORKSHIRE WATER SERVICES LIMITED, SOUTH MILFORD/WPS, COMMON LANE, SOUTH MILFORD, LEEDS, LS25 5BZ (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
No capacity data
(Estimated)
YORKSHIRE WATER PLC, KNOSTROP TREATMENT WORKS, KNOWSTHORPE LANE, LEEDS, LS9 0PJ (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
No capacity data
(Estimated)
YO8 (4 components)
• Domestic demand turn down
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
171.01 MW (Est from CMU) (part of 171.01 MW aggregated CMU)
(Estimated)
YO7 (4 components)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
110.08 MW (Est from CMU) (part of 110.08 MW aggregated CMU)
(Estimated)
YO62 (4 components)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic EV
• Domestic EV charger
Active • 2025-26 (T-1), 2024-25 (T-4) ...
48.27 MW (Est from CMU) (part of 48.27 MW aggregated CMU)
(Estimated)
YO61 (3 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
64.27 MW (Est from CMU) (part of 64.27 MW aggregated CMU)
(Estimated)
YO60 (2 components)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic EV charger
Active • 2025-26 (T-1), 2024-25 (T-4) ...
36.45 MW (Est from CMU) (part of 36.45 MW aggregated CMU)
(Estimated)
YO51 (4 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
84.51 MW (Est from CMU) (part of 84.51 MW aggregated CMU)
(Estimated)
YO43 (2 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
94.19 MW (Est from CMU) (part of 94.19 MW aggregated CMU)
(Estimated)
YO42 (2 components)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
43.47 MW (Est from CMU) (part of 43.47 MW aggregated CMU)
(Estimated)
YO41 (3 components)
• Domestic EV charger
• Domestic EV charge point
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
110.82 MW (Est from CMU) (part of 110.82 MW aggregated CMU)
(Estimated)
Loading map...