Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing first 3330 of 3330 unique locations - Page 1 of 134

Sort by: A-Z Components MW Date
"Mercia EnvirRecover EfW Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB" (1 component)
• This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 MW grid connection size, in line with rule 3.5.3 using historic data. Mercia Waste Management Ltd 250kT Energy from Waste plant with c. 19MW electrical output net. Auxilliary load is not included in connection capacity .i.e the export is net.
• Mercia Waste Management Ltd Hartlebury Trading Estate Kidderminster DY10 4JB. In build Energy from Waste plant in Hartlebury. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
168.99 MW (Est from CMU)
(Estimated)
1 Maxwell Road, Woodston Industrial Estate, Peterborough PE2 7JB (1 component)
• This CMU is 10*2MW reciprocating engines using HVO.
• This CMU is 6*2MW reciprocating engines.
• This CMU is 10*2MW reciprocating engines.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
37.40 MW (Est from CMU) (part of 37.40 MW aggregated CMU)
(Estimated)
1 Ratty's Lane, Hoddesdon, Hertfordshire, EN11 0RF (1 component)
• Combined Cycle Gas Turbine plant
• Combined Cycle Gas Turbine
Active • 2028-29 (T-4), 2026-27 (T-4)
978.64 MW
(Estimated)
1020 Slutchers Lane, Centre Park, Warrington, WA1 1QL (1 component)
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
59.66 MW (Est from CMU)
(Estimated)
111 Brancroft Way Enfield Middlesex EN3 7PL (1 component)

Enfield CCGT Power Station - (one unit station)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1595.21 MW (Est from CMU)
(Estimated)
160 Corporation Road, Newport, Gwent, NP19 0WF (1 component)

0.39MW Battery Storage located at Newport Bus depot

Active • 2026-27 (T-4), 2024-25 (T-4) ...
6.42 MW (Est from CMU) (part of 6.42 MW aggregated CMU)
(Estimated)
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (1 component)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.23 MW (Est from CMU)
(Estimated)
2 Bar Lane, York, YO51 9LS (1 component)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Active • 2028-29 (T-4), 2027-28 (T-4) ...
45.41 MW (Est from CMU) (part of 45.41 MW aggregated CMU)
(Estimated)
2 Engineers Way, Wembley, Middlesex, HA9 0JS (1 component)

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
24.98 MW (Est from CMU)
(Estimated)
3 Nairn Road, Deans Industrial Estate, Livingston, West Lothian, EH54 8AY (1 component)
• Newbuild gas generator
• Reciprocating engine (natural gas fuelled)
Active • 2026-27 (T-4), 2025-26 (T-1) ...
31.48 MW (Est from CMU)
(Estimated)
301 Camberwell New Rd, Camberwell, London, SE5 0TF (2 components)
• Battery Storage and demand reduction located at Abellio Walworth bus depot
• 1.26MW Battery Storage located at Abellio Walworth depot
• Bus depot site
Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.58 MW (Est from CMU) (part of 7.58 MW aggregated CMU)
(Estimated)
318 Edinburgh Rd, Brakes Newhouse, Motherwell, ML1 5SY, United Kingdom (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.05 MW (Est from CMU) (part of 18.05 MW aggregated CMU)
(Estimated)
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (1 component)
• District heating implementation of two gas CHP engines with no auxilliary load
• Two 3.0 MW gas CHP engines. Primary fuel type = Natural Gas
Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.08 MW (Est from CMU)
(Estimated)
37 Wenlock Way, Leicester LE4 9HU (1 component)

bus depot

Active • 2026-27 (T-4), 2023-24 (T-1)
4.13 MW (Est from CMU) (part of 4.13 MW aggregated CMU)
(Estimated)
4 Finway Road Hemel Hempstead HP2 7PT (1 component)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.23 MW (Est from CMU)
(Estimated)
44-48 E Dock St, Dundee DD1 3JS (3 components)

Bus depot site

Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.89 MW (Est from CMU) (part of 7.89 MW aggregated CMU)
(Estimated)
47-53 Charterhouse Street, London, EC1M 6PB (1 component)
• A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
• A site with two reciprocating gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
28.03 MW (Est from CMU)
(Estimated)
5 Greenock Rd, Inchinnan, Renfrew PA4 9PG (2 components)

Bus depot site

Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.29 MW (Est from CMU)
(Estimated)
; THE AVENUE CLIFTON BRISTOL BS8 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
No capacity data
(Estimated)
; FURZEFIELD ROAD BEACONSFIELD BUCKINGHAMSHIRE HP9 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
No capacity data
(Estimated)
ABBEY HILL ROAD, WINCHESTER, HAMPSHIRE, SO23 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
No capacity data
(Estimated)
ABBEY ROAD LLANGOLLEN CLWYD LL20 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
No capacity data
(Estimated)
ABBEYDALE PARK RISE, SHEFFIELD, S17 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
No capacity data
(Estimated)
ABBOT ROAD, BURTON-UPON-TRENT, STAFFORDSHIRE, DE13 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
No capacity data
(Estimated)
ABBOTS MEWS SELBY YO8 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
189.08 MW (Est from CMU) (part of 189.08 MW aggregated CMU)
(Estimated)
Loading map...