Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing last 3997 of 3997 unique locations - Page 1 of 160

Sort by: A-Z Components MW Date
winter lane west hanney wantage OX12 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
17.35 MW (Est from CMU) (part of 17.35 MW aggregated CMU)
(Estimated)
via entrance at 132 Manchester Road, Carrington, Manchester, M31 4AY (1 component)

247.5MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.

Active • 2027-28 (T-4)
28.51 MW
(Estimated)
stevenson ave polmont POLMONT falkirk FALKIRK FK2 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
No capacity data
(Estimated)
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (2 components)
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
• Battery Storage plant
• Gas reciprocating engines
Active • 2027-28 (T-4), 2026-27 (T-4) ...
286.73 MW
(Estimated)
land at Keelings Road, Southminster, CM0 7JF (1 component)
• New build generating CMU component known as Dengie Solar Park
• New build generating CMU component known as Dengie BESS
Active • 2027-28 (T-4), 2025-26 (T-1)
4.43 MW
(Estimated)
kingsfield WINDSOR BERKSHIRE SL4 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
No capacity data
(Estimated)
hill wynd KIRKNEWTON MIDLOTHIAN EH27 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
14.29 MW (Est from CMU) (part of 14.29 MW aggregated CMU)
(Estimated)
hill barn witney road abingdon oxfordshire OX13 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
151.70 MW (Est from CMU) (part of 151.70 MW aggregated CMU)
(Estimated)
erwyn dyserth TRELAWNYD RHYL CLWYD LL18 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
No capacity data
(Estimated)
enfinium Skelton Grange Limited South Road Knowsthorpe Leeds LS10 1RR (1 component)

SG is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network.

Active • 2027-28 (T-4), 2025-26 (T-1)
86.46 MW (Est from CMU)
(Estimated)
enfinium Ferrybridge 2 Limited Kirkhaw Lane, off Stranglands Lane Knottingley West Yorkshire WF11 8DX (1 component)

FM2 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network

Active • 2028-29 (T-4), 2027-28 (T-4)
67.78 MW
(Estimated)
enfinium Ferrybridge 1 Limited Kirkhaw Lane off Stranglands Lane Knottingley West Yorkshire WF11 8DX (1 component)

FM1 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network.

Active • 2028-29 (T-4), 2027-28 (T-4)
139.47 MW
(Estimated)
church road worle weston-super-mare avon BS22 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
No capacity data
(Estimated)
castle park drive TORQUAY TQ4 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
27.42 MW (Est from CMU) (part of 27.42 MW aggregated CMU)
(Estimated)
adjacent to National Grid Stalybridge substation SK15 3DA (1 component)

75MW battery storage located near to the National Grid Stalybridge substation.

Active • 2027-28 (T-4)
23.09 MW
(Estimated)
ZUBRON GROVE MILTON KEYNES BUCKINGHAMSHIRE MK8 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.00 MW (Est from CMU) (part of 18.00 MW aggregated CMU)
(Estimated)
Yorkshire Water, Huddersfield HD2 1GQ (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2027-28 (T-4), 2024-25 (T-1)
14.00 MW (Est from CMU)
(Estimated)
York Road Cliffe Selby YO8 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
170.17 MW (Est from CMU) (part of 170.17 MW aggregated CMU)
(Estimated)
Yew Tree Close Basingstoke Hampshire RG23 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
No capacity data
(Estimated)
Yeasrley - Bellshill, Belgowan Street, Bellshill ML4 3LB, UK (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.83 MW (Est from CMU) (part of 21.83 MW aggregated CMU)
(Estimated)
Yearsley Coleshill, Coleshill, Birmingham B46 1JU (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.76 MW (Est from CMU) (part of 17.76 MW aggregated CMU)
(Estimated)
Yearsley - Wisbech, Weasenham La, Wisbech, PE13 2RN (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.20 MW (Est from CMU) (part of 4.20 MW aggregated CMU)
(Estimated)
Yearsley - Seaham, Fox Cover industrial Est, Admiralty Way, Dawdon, Seaham SR7 7DN, United Kingdom (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
23.19 MW (Est from CMU) (part of 23.19 MW aggregated CMU)
(Estimated)
Yearsley - Portbury, Garonor Way Royal Portbury Dock, Portbury, Bristol BS20 7XT (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.99 MW (Est from CMU) (part of 28.99 MW aggregated CMU)
(Estimated)
Yearsley - Holmewood - Site 2, Holmewood Field Industrial Park, Park Rd, Holmewood Industrial Park, Holmewood, Chesterfield, Derbyshire S42 5BX (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
23.55 MW (Est from CMU) (part of 23.55 MW aggregated CMU)
(Estimated)
Loading map...