Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing first 1541 of 1541 unique locations - Page 1 of 62

Sort by: A-Z Components MW Date
"Mercia EnvirRecover EfW Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB" (1 component)
• This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 MW grid connection size, in line with rule 3.5.3 using historic data. Mercia Waste Management Ltd 250kT Energy from Waste plant with c. 19MW electrical output net. Auxilliary load is not included in connection capacity .i.e the export is net.
• Mercia Waste Management Ltd Hartlebury Trading Estate Kidderminster DY10 4JB. In build Energy from Waste plant in Hartlebury. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
168.99 MW (Est from CMU)
(Estimated)
15.46 MW (Est from CMU)
(Estimated)
1 Ratty's Lane, Hoddesdon, Hertfordshire, EN11 0RF (1 component)
• Combined Cycle Gas Turbine plant
• Combined Cycle Gas Turbine
Active • 2028-29 (T-4), 2026-27 (T-4)
978.64 MW
(Estimated)
1 Rivington Rd, Preston Brook, Runcorn WA7 3DP, United Kingdom (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
48.29 MW (Est from CMU) (part of 48.29 MW aggregated CMU)
(Estimated)
1 To 17 Inclusive, Titan Drive, Peterborough, PE1 5XN (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW (part of 0.05 MW aggregated CMU)
(Estimated)
100 Cathcart Rd, Glasgow G42 7BH (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2025-26 (T-1) ...
10.11 MW (Est from CMU)
(Estimated)
100 Montifichet Road, Westfield, Stratford E20 1GR (2 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
52.51 MW (Est from CMU)
(Estimated)
1020 Slutchers Lane, Centre Park, Warrington, WA1 1QL (1 component)
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
59.66 MW (Est from CMU)
(Estimated)
111 Brancroft Way Enfield Middlesex EN3 7PL (1 component)

Enfield CCGT Power Station - (one unit station)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1595.21 MW (Est from CMU)
(Estimated)
165 Fordhouse Lane Stirchley Birmingham B30 3AG (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
8.38 MW
(Estimated)
17 Oak Tree Road, Fen Drayton, Cambridge, CB24 4SS (1 component)

2 x gas fired CHP generators located at a horticultural site.

Active • 2028-29 (T-4), 2024-25 (T-4)
5.48 MW (Est from CMU)
(Estimated)
2 Bar Lane, York, YO51 9LS (1 component)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Active • 2028-29 (T-4), 2027-28 (T-4) ...
45.41 MW (Est from CMU) (part of 45.41 MW aggregated CMU)
(Estimated)
2 Samworth Way, Melton Mowbray LE13 1GA (1 component)

Existing Generation on existing site - CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.34 MW (Est from CMU)
(Estimated)
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (1 component)
• Operational Reciprocating Engine
• Operational gas reciprocating engine.
• New build gas generator
Active • 2028-29 (T-4), 2024-25 (T-4) ...
11.29 MW (Est from CMU)
(Estimated)
288 And 290 Hillgrounds Road Kempston Bedford MK42 8SZ (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW (part of 0.05 MW aggregated CMU)
(Estimated)
318 Edinburgh Rd, Brakes Newhouse, Motherwell, ML1 5SY, United Kingdom (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.05 MW (Est from CMU) (part of 18.05 MW aggregated CMU)
(Estimated)
322 Broomloan Rd, Glasgow G51 2JQ (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
20.94 MW
(Estimated)
4 Chemistry Lane, Pentre, Deeside CH5 2DA, UK (1 component)

14MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Active • 2028-29 (T-4)
25.71 MW
(Estimated)
4 Sidings Rd, Kirkby in Ashfield, Nottingham NG17 7JZ (1 component)

Battery energy storage unit

Active • 2028-29 (T-4), 2025-26 (T-1)
1.37 MW (part of 1.37 MW aggregated CMU)
(Estimated)
47-53 Charterhouse Street, London, EC1M 6PB (1 component)
• A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
• A site with two reciprocating gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
28.03 MW (Est from CMU)
(Estimated)
5 Foxwood Rd, Chesterfield, S41 9RA (1 component)

Battery energy storage unit

Active • 2028-29 (T-4), 2025-26 (T-1)
1.07 MW (part of 1.07 MW aggregated CMU)
(Estimated)
72-77 Lower Tower Street, Hockley, Birmingham, B19 3NF (1 component)

New build battery storage

Active • 2028-29 (T-4)
17.80 MW
(Estimated)
4.57 MW
(Estimated)
96 Kings Rd, Immingham DN40 1QS (1 component)

New-Build CHP Generating Unit at Knauf (UK) Immingham Plant.

Active • 2028-29 (T-4)
6.45 MW
(Estimated)
A Pumping Station On The North East Side Of Pigeon Lane Fornham All Saints IP28 6JP (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW (part of 0.05 MW aggregated CMU)
(Estimated)
Loading map...