Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing first 16044 of 16044 unique locations - Page 1 of 642

Sort by: A-Z Components MW Date
"Land to the east of Marl Road, Knowsley, Kirkby, L33 7UH (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
No capacity data
(Estimated)
"Mercia EnvirRecover EfW Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB" (1 component)
• This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 MW grid connection size, in line with rule 3.5.3 using historic data. Mercia Waste Management Ltd 250kT Energy from Waste plant with c. 19MW electrical output net. Auxilliary load is not included in connection capacity .i.e the export is net.
• Mercia Waste Management Ltd Hartlebury Trading Estate Kidderminster DY10 4JB. In build Energy from Waste plant in Hartlebury. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
168.99 MW (Est from CMU)
(Estimated)
' WHISTLEY HALL LOVE LANE ASHBURTON NEWTON ABBOTT DEVON TQ13 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
No capacity data
(Estimated)
'The Black Shed', Belleknowes Industrial Estate, Inverkeithing, KY11 1HY (1 component)

A new build, gas fuelled generation station.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
37.95 MW (Est from CMU)
(Estimated)
*Please see cover letter regarding postcode Blary Hill wind farm, Off C20 road (Barr Glen Road), Glenbarr, Tarbert, Scotland, UK (1 component)

New build wind farm at Blary Hill consisting of 14 wind turbines.

Active • 2023-24 (T-4), 2022-23 (T-3)
2.87 MW (Est from CMU)
(Estimated)
05-07 Middleton Park Avenue Middleton West Yorkshire Great Britain LS10 4HP (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4), 2025-26 (T-1)
No capacity data
(Estimated)
06-10 Farndale Avenue Osbaldwick North Yorkshire Great Britain YO10 3PE (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4), 2025-26 (T-1)
No capacity data
(Estimated)
08-12 Worple Road Great Britain SW19 4DD (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4), 2025-26 (T-1)
No capacity data
(Estimated)
09-Nov Moor Allerton Centre Kings Lane Great Britain LS17 5NY (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4), 2025-26 (T-1)
No capacity data
(Estimated)
15.46 MW (Est from CMU)
(Estimated)
1 Berners Street Great Britain W1T 3LA (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4), 2025-26 (T-1)
0.0098 MW (Est from CMU) (part of 0.01 MW aggregated CMU)
(Estimated)
1 Brazen Gate Great Britain NR1 3RX (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4), 2025-26 (T-1)
0.0098 MW (Est from CMU) (part of 0.01 MW aggregated CMU)
(Estimated)
1 Cambridge Heath Road Great Britain E1 5SD (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4), 2025-26 (T-1)
0.0098 MW (Est from CMU) (part of 0.01 MW aggregated CMU)
(Estimated)
1 Charleston Road North Cove Aberdeenshire Great Britain AB12 3SZ (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4), 2025-26 (T-1)
0.0098 MW (Est from CMU) (part of 0.01 MW aggregated CMU)
(Estimated)
1 Common Garden Square Cumbria Great Britain CA11 7FG (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
0.0098 MW (Est from CMU) (part of 0.01 MW aggregated CMU)
(Estimated)
1 High Street Oxfordshire Great Britain OX9 2BU (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
0.0098 MW (Est from CMU) (part of 0.01 MW aggregated CMU)
(Estimated)
1 Kirkhaw Lane Knottingley WF11 8RD (1 component)

20 MW Storage facility located at Knottingley.

Active • 2021-22 (T-4)
No capacity data
(Estimated)
1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD (2 components)
• CMU FES002 which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 8MW. The CMU is located at: 1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD.
• AN 8MW new build gas generating station..
Active • 2024-25 (T-4)
15.24 MW (Est from CMU)
(Estimated)
1 Loicher Ln, Sheffield S35 9XN, UK (1 component)

2MW 60 minute frequency response battery storage

Active • 2021-22 (T-4)
No capacity data
(Estimated)
1 Mallard Road, Peterborough, PE3 8YN (1 component)

"Planet Ice - UK 1 Mallard Road, Peterborough, PE3 8YN The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Active • 2017-18 (TR)
No capacity data
(Estimated)
1 Maxwell Road, Woodston Industrial Estate, Peterborough PE2 7JB (1 component)
• This CMU is 10*2MW reciprocating engines using HVO.
• This CMU is 6*2MW reciprocating engines.
• This CMU is 10*2MW reciprocating engines.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
37.40 MW (Est from CMU) (part of 37.40 MW aggregated CMU)
(Estimated)
1 Mercury House 4-8 Cheam Road Surrey Great Britain KT17 1SN (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
0.0098 MW (Est from CMU) (part of 0.01 MW aggregated CMU)
(Estimated)
1 Merton High Street Colliers Wood Great Britain SW19 1DD (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4), 2025-26 (T-1)
0.0098 MW (Est from CMU) (part of 0.01 MW aggregated CMU)
(Estimated)
1 Midland Road, London, NW1 1AT (1 component)

One GE Genbacher 612GS 2MWe CHP

Inactive • 2019-20 (T-1)
No capacity data
(Estimated)
1 Midland Road, London, NW1 IAT (1 component)

One GE Genbacher 612GS 2MWe CHP engine and one Caterpillar C175-16 ACERT 2.4MWe diesel backup generator

Active • 2019-20 (T-1)
No capacity data
(Estimated)
Loading map...