Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing last 86 of 86 unique locations - Page 1 of 4

Sort by: A-Z Components MW Date
land at Hoon Hay Farm, Marston Lane, Hatton, Derbyshire, DE65 5EA (1 component)

gas powered generator to be installed on designated land within a manufacturing compound at the Hoon Hay Farm.

Active • 2024-25 (T-4)
No capacity data
(Estimated)
West of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4)
8.98 MW
(Estimated)
West House Farm, Scruton, Northallerton, DL7 0RQ (1 component)

18MW, 2-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. Solar PV farm has secured …

Active • 2028-29 (T-4)
7.54 MW
(Estimated)
West Benhar Windfarm off the B717 Benhar Road, Nr Shotts, ML7 5BJ (1 component)
• West Benhar MPAN ID: 1800061208159 The CMU is a onshore windfarm connection to the distribution system at a Drumcross substation
• The CMU is an onshore windfarm connection to the distribution system at Drumcross substation
Active • 2025-26 (T-1), 2024-25 (T-1)
4.64 MW (Est from CMU)
(Estimated)
Watson Head Farm Watson Head Road Allanton Wishaw ML2 9PL (1 component)

1 x 4.2MW Onshore Wind Turbine Generator

Active • 2026-27 (T-4), 2023-24 (T-1)
1.66 MW (Est from CMU) (part of 1.66 MW aggregated CMU)
(Estimated)
1.66 MW (Est from CMU) (part of 1.66 MW aggregated CMU)
(Estimated)
No capacity data
(Estimated)
Todholes Farm, Denny Road, Fintry, Glasgow, G63 0XH (1 component)

Earlsburn Wind Farm

Active • 2028-29 (T-4)
4.89 MW
(Estimated)
The site is located next to A836, Crask, Highland, Scotland (1 component)
• 22 wind turbines new built with expected capacity installed of 79.2 MW
• 22 wind turbines new built with expected capacity installed of 92.4 MW
Active • 2024-25 (T-4), 2022-23 (T-3)
7.08 MW (Est from CMU)
(Estimated)
The fields close to Chear Farm Bungalow, Ely Road, Chittering, Cambridge, CB25 9PN (1 component)
• FENGH2 (CMU) is a new build generating 06.000MW gas fired CHP plant.
• FENGEN (CMU) is a load reduction asset using lighting and battery energy storage (BESS) for growing of vegetables on an industrial scale.
Active • 2028-29 (T-4)
12.92 MW (Est from CMU)
(Estimated)
17.42 MW (Est from CMU)
(Estimated)
Tealing Substation, Myreton Farm Cottages, Strathmartine, Dundee DD3 0PY. (1 component)
• Offshore Wind Farm with 30 Wind Turbines
• Offshore wind farm with 38 wind turbines
• Wind Farm with 38 wind turbines
Active • 2028-29 (T-4), 2027-28 (T-4) ...
386.49 MW (Est from CMU)
(Estimated)
44.87 MW (Est from CMU)
(Estimated)
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HX (2 components)
• 5 MW of demand reduction
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
No capacity data
(Estimated)
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HW (1 component)
• NEW BUILD GAS FUELLED GENERATING STATION
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2020-21 (T-4), 2019-20 (T-1)
No capacity data
(Estimated)
TWIN OAKS FARM LAND TO THE EAST OF YELT FARM LOWER STREET DOVERIDGE DE6 5JW (3 components)
• NEW BUILD GAS GENERATION STATION
• NEW BUILD GAS FUELLED GENERATING STATION
• NEW BUILD DIESEL GENERATION STATION
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
(Estimated)
Stokeford Farm, East Stoke, Wareham, Dorset, BH20 7NU, England (1 component)

4 x 2MW wind turbine generators to be installed on the lands of Stokeford Farm, East Stoke, Dorset, England.

Active • 2025-26 (T-4)
0.50 MW (Est from CMU)
(Estimated)
South Kyle Wind Farm, New Cumnock (off B741), Dalmellington, Ayr, KA6 7FP (1 component)

50 Turbine onshore wind farm with a gross installed capacity of 240 MW in East Ayrshire, Scotland

Active • 2028-29 (T-4), 2025-26 (T-1)
33.72 MW
(Estimated)
2.39 MW
(Estimated)
Rosper Road South Killingholme Immingham DN40 3DZ (1 component)

Gas CHP on South bank of river Humber providing electricity and industrial steam

Inactive • 2020-21 (T-4), 2017-18 (T-1)
712.80 MW (Est from CMU)
(Estimated)
Rosper Road Immingham North Lincolnshire DN40 3DZ (3 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2028-29 (T-4), 2024-25 (T-1) ...
1165.32 MW (Est from CMU)
(Estimated)
Rolleston Park Farm, Lodge Hill, Tutbury, Staffordshire, DE13 9HQ (1 component)

12 MW Solar PV Array

Active • 2028-29 (T-4), 2025-26 (T-1)
1.41 MW
(Estimated)
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (1 component)
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
33.26 MW (Est from CMU)
(Estimated)
Radstone Rd, Radstone, Brackley NN13 5PY (1 component)
• An Existing diesel grid support plant
• An Exiting diesel grid support plant
• A new build diesel or gas grid support plant
Active • 2025-26 (T-1), 2024-25 (T-1) ...
14.07 MW (Est from CMU)
(Estimated)
Loading map...