Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing last 148 of 148 unique locations - Page 1 of 6

Sort by: A-Z Components MW Date
to be provided once CMU Components are known (1 component)

to be provided once CMU Components are known

Inactive • 2020-21 (T-4), 2017-18 (TR) ...
91.69 MW (Est from CMU)
(Estimated)
Yeomans Way, Bournemouth, BH8 0BQ (1 component)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
0.73 MW (part of 0.73 MW aggregated CMU)
(Estimated)
Wolstanton Retail Park, Wolstanton, Newcastle, ST5 0AP (1 component)
• Import/Export metering with diesel generation at a retail store
• DSR Component providing load turn down at a retail store
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
0.87 MW (part of 0.87 MW aggregated CMU)
(Estimated)
207.86 MW (Est from CMU)
(Estimated)
Waterhouse Mills, Beetham, Milnthorpe, Cumbria, LA7 7AR (1 component)

Paper products manufacturing site carrying out DSR by load turn-down

Active • 2028-29 (T-4), 2026-27 (T-4) ...
20.01 MW (Est from CMU)
(Estimated)
Waddon Marsh Purley Way Croydon CR0 4NX (1 component)

A reciprocating gas engine CHP providing hot water to a local heat network

Active • 2021-22 (T-4), 2018-19 (T-1)
0.09 MW (part of 0.09 MW aggregated CMU)
(Estimated)
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (1 component)

A gas engine CHP site providing hot water to a local district heating network

Active • 2026-27 (T-4), 2025-26 (T-4) ...
15.95 MW (Est from CMU) (part of 15.95 MW aggregated CMU)
(Estimated)
The Owlcotes Centre, Varley Street, Pudsey, LS28 6AR (1 component)
• DSR Component providing load turn down at a retail store
• Import/Export metering with diesel generation at a retail store
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
2.49 MW (part of 2.49 MW aggregated CMU)
(Estimated)
The Mall, Patchway, Bristol, BS34 5QT (1 component)
• DSR Component providing load turn down at a retail store
• Import/Export metering with diesel generation at a retail store
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
0.77 MW (Est from CMU) (part of 0.77 MW aggregated CMU)
(Estimated)
12.58 MW
(Estimated)
7.20 MW
(Estimated)
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (1 component)
• Staythorpe 3 - CCGT MSID: 7210
• Staythorpe 1 - CCGT MSID: 7210
• Staythorpe 2 - CCGT MSID: 7210
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6018.18 MW (Est from CMU)
(Estimated)
Stainland Boardmill, Holywell Green, Halifax, HX4 9PY (1 component)

Gas Fired CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
12.67 MW
(Estimated)
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (1 component)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.69 MW (Est from CMU) (part of 0.69 MW aggregated CMU)
(Estimated)
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (1 component)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
55.09 MW (Est from CMU)
(Estimated)
SMACC Melting Shop, Shepcote Lane, Europa Link, Sheffield, S9 1TZ (1 component)
• DSR component providing load turn-down at a steel melting facility with electric arc-furnaces
• DSR Component providing load turndown at a steel melting facility with electric arc furnaces
• Component is a steel melting facility with electric arc-furnaces, which can be controlled to reduce their power demand when required
Active • 2028-29 (T-4), 2027-28 (T-4) ...
141.03 MW (Est from CMU)
(Estimated)
Runnings Road, Swindon Village, Cheltenham, GL51 9NQ (1 component)

A gas engine CHP site providing steam and electricity to an industrial unit

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
1.59 MW (Est from CMU) (part of 1.59 MW aggregated CMU)
(Estimated)
River E Hydroelectric Generating Station, Gorthleck,Inverness IV2 6UL (1 component)

Hydroelectric run of river generating plant

Active • 2028-29 (T-4)
5.46 MW
(Estimated)
Red Roofs Nursery Limited, North Moor Lane, Cottingham, Hull, HU16 4JN (2 components)

A gas engine CHP site providing hot water to agricultural greenhouses

Active • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Red Roofs Nursery Limited North Moor Lane Cottingham HU16 4JN (1 component)

CHP engine supplying heat and power to agricultural greenhouses

Inactive • 2021-22 (T-4), 2018-19 (T-1)
1.20 MW (part of 1.20 MW aggregated CMU)
(Estimated)
Red Roofs Nursery Limited Dunswell Road Cottingham Hull East Yorkshire HU16 4JT (1 component)

CHP engine supplying heat and power to agricultural greenhouses

Inactive • 2021-22 (T-4), 2018-19 (T-1)
0.80 MW (part of 0.80 MW aggregated CMU)
(Estimated)
Racecourse Road Newbury West Berkshire RG14 7NZ (1 component)

A reciprocating gas engine CHP providing hot water to a local heating network

Active • 2021-22 (T-4), 2018-19 (T-1)
0.09 MW (part of 0.09 MW aggregated CMU)
(Estimated)
RWE Generation UK plc, Cheshire Power Station North Road, Ellesmere Port Cheshire CH65 1AF (1 component)

The CMU will be formed of multiple battery storage units and medium voltage stations (inverter and battery transformer) connected in parallel.

Active • 2026-27 (T-4), 2025-26 (T-4)
21.42 MW (Est from CMU)
(Estimated)
RWE Generation UK plc Ferrybridge A Workshop Site Old Great North Road Knottingley WF11 8PR (1 component)

A CMU will be formed of an Open Cycle Gas Turbine unit.

Active • 2022-23 (T-4)
No capacity data
(Estimated)
RWE Cogen UK Ltd North South Access Road Seal Sands Middlesbrough TS2 1FB (1 component)

Conoco Phillips CCGT - Private Network connected to Conoco Phillips Refinery - Auxiliary load behind CMU meter

Active • 2020-21 (T-4), 2017-18 (T-1)
19.26 MW (Est from CMU)
(Estimated)
Loading map...