All Locations
Showing first 34 of 34 unique locations - Page 1 of 2
*Please see cover letter regarding postcode Aberarder Wind Farm, Aberarder Estate, Strathnairn, Highland Scotland (1 component)
New build wind farm at Aberarder consisting of 12 wind turbines.
Carlton Forest, Blyth Road, Worksop, S81 0TP (1 component)
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (1 component)
Forum House, Gorsey Lane, Widnes, WA8 0YZ (1 component)
A New Build 14MW Gas Fuelled Generating Station.
Land Adjacent to Braintree Substation Braintree 400kV substation Braintree Road Cressing CM77 8DJ (1 component)
New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection
Land Adjacent to Norwich Substation Mangreen Lane Stoke Holy Cross Norwich NR14 8PG (1 component)
New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection
Land Adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (1 component)
New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (1 component)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (1 component)
The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Land at Ellbridge Farm, Ellbridge Lane, Hatt Saltash PL12 6PU (1 component)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Land at Shell Green, Gorsey Lane, Widness, WA8 0YZ (1 component)
A New Build 14MW Gas Fuelled Generating Station.
Land directly South to Coventry Substation Parrotts Grove Coventry CV2 1NQ (1 component)
The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (1 component)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Land north east of Bustleholm Substation Painswick Close Walsall WS5 4SJ (1 component)
The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Land north east of Bustleholm Substation, M6, Walsall, WS5 4SJ (1 component)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Land north of Indian Queens Substation, Domellick Hill (B3279), St Dennis, St Austell, Cornwall, PL26 8BY (1 component)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Land north west of Braintree Substation, Braintree Road, Cressing, Braintree, CM77 8EZ (1 component)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (1 component)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Land on the north west side of Holt Road, Mannington Heath, Wimborne BH21 6SE (1 component)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB (1 component)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Land to the West of Harker Grid Sub Station Low Harker Harker Carlisle CA6 4DQ (1 component)
New build transmission connected battery storage site
Land west of the B788, Auchenfoil Road, Inverclyde, PA13 4TL (nearest) (1 component)
New build onshore wind farm.
MAGNA PARK, CROSSLEY DRIVE, Milton Keynes MK17 8FL (1 component)
The CMU component BARR17 will consist of one CHP engine with a generation capacity of 4.5 MW.
Mill Rig Wind Farm Waterhead Peelhill and Linbank Highway ML10 6RQ Scotland United Kingdom (1 component)
6 turbine onshore wind farm located in South Lanarkshire, Scotland.