Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing last 30 of 30 unique locations - Page 1 of 2

Sort by: A-Z Components MW Date
via entrance at 132 Manchester Road, Carrington, Manchester, M31 4AY (1 component)

247.5MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.

Active • 2027-28 (T-4)
28.51 MW
(Estimated)
West of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4)
8.98 MW
(Estimated)
West Benhar Windfarm off the B717 Benhar Road, Nr Shotts, ML7 5BJ (1 component)
• West Benhar MPAN ID: 1800061208159 The CMU is a onshore windfarm connection to the distribution system at a Drumcross substation
• The CMU is an onshore windfarm connection to the distribution system at Drumcross substation
Active • 2025-26 (T-1), 2024-25 (T-1)
4.64 MW (Est from CMU)
(Estimated)
The Loddon Centre, Basingstoke RG24 8QW, UK (1 component)

We are currently in discussions with a number of DSR Customers, with the aggregate of the customers capacity totalling 50MW. Contracts are currently being written and reviewed between the parties …

Active • 2018-19 (T-1)
No capacity data
(Estimated)
Slutchers Lane, Warrington WA1 1QY, UK (1 component)

We are currently in discussions with a number of DSR Customers, with the aggregate of the customers capacity totalling 50MW. Contracts are currently being written and reviewed between the parties …

Active • 2018-19 (T-1)
No capacity data
(Estimated)
Rosper Road South Killingholme Immingham DN40 3DZ (1 component)

Gas CHP on South bank of river Humber providing electricity and industrial steam

Inactive • 2020-21 (T-4), 2017-18 (T-1)
712.80 MW (Est from CMU)
(Estimated)
Rosper Road Immingham North Lincolnshire DN40 3DZ (3 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2028-29 (T-4), 2024-25 (T-1) ...
1165.32 MW (Est from CMU)
(Estimated)
Peel Mills Industrial Estate, Chamberhall St, Bury BL9 0LU, UK (1 component)

We are currently in discussions with a number of DSR Customers, with the aggregate of the customers capacity totalling 50MW. Contracts are currently being written and reviewed between the parties …

Active • 2018-19 (T-1)
No capacity data
(Estimated)
Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (2 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• We are currently in discussions with a number of DSR Customers, with the aggregate of the customers capacity totalling 50MW. Contracts are currently being written and reviewed between the parties involved.
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
No capacity data
(Estimated)
Mill Rig Wind Farm Waterhead Peelhill and Linbank Highway ML10 6RQ Scotland United Kingdom (1 component)

6 turbine onshore wind farm located in South Lanarkshire, Scotland.

Active • 2028-29 (T-4)
4.44 MW
(Estimated)
MAGNA PARK, CROSSLEY DRIVE, Milton Keynes MK17 8FL (1 component)

The CMU component BARR17 will consist of one CHP engine with a generation capacity of 4.5 MW.

Active • 2021-22 (T-4)
No capacity data
(Estimated)
Land west of the B788, Auchenfoil Road, Inverclyde, PA13 4TL (nearest) (1 component)

New build onshore wind farm.

Active • 2023-24 (T-4), 2022-23 (T-3)
No capacity data
(Estimated)
Land to the West of Harker Grid Sub Station Low Harker Harker Carlisle CA6 4DQ (1 component)

New build transmission connected battery storage site

Active • 2022-23 (T-4)
No capacity data
(Estimated)
Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4), 2025-26 (T-1)
32.75 MW (Est from CMU)
(Estimated)
Land on the north west side of Holt Road, Mannington Heath, Wimborne BH21 6SE (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2028-29 (T-4)
13.64 MW
(Estimated)
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2027-28 (T-4), 2025-26 (T-1)
32.18 MW
(Estimated)
Land north west of Braintree Substation, Braintree Road, Cressing, Braintree, CM77 8EZ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2025-26 (T-1)
30.96 MW
(Estimated)
Land north of Indian Queens Substation, Domellick Hill (B3279), St Dennis, St Austell, Cornwall, PL26 8BY (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4), 2025-26 (T-1)
32.03 MW
(Estimated)
Land north east of Bustleholm Substation, M6, Walsall, WS5 4SJ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2023-24 (T-1)
33.32 MW (Est from CMU)
(Estimated)
Land north east of Bustleholm Substation Painswick Close Walsall WS5 4SJ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2024-25 (T-4)
No capacity data
(Estimated)
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2023-24 (T-1)
49.98 MW (Est from CMU)
(Estimated)
Land directly South to Coventry Substation Parrotts Grove Coventry CV2 1NQ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2024-25 (T-4)
No capacity data
(Estimated)
Land at Ellbridge Farm, Ellbridge Lane, Hatt Saltash PL12 6PU (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2028-29 (T-4)
16.07 MW
(Estimated)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
7.10 MW (Est from CMU)
(Estimated)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (1 component)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
12.74 MW
(Estimated)
Loading map...