Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing first 74 of 74 unique locations - Page 1 of 3

Dolgarrog Power Station, Conway Rd, Dolgarrog, Conwy LL32 8QE (1 component)

A New Build 5 MW Battery Storage system

Inactive • 2021-22 (T-4)
No capacity data
(Estimated)
Edwinstowe, Ollerton Road, NG22 9DX (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Essex Road, Hoddesdon,Herts, EN11 0DN (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Ex Gas Works Site Land west of Afan Way Port Talbot SA12 6HQ (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Farr and Glenkyllachy Estate, Inverness-shire. (1 component)

20 wind turbines forming an Onshore wind farm.

Inactive • 2021-22 (T-4)
No capacity data
(Estimated)
Former Depot West of Phoenix Mills, Nottingham Road, Long Eaton, Derbyshire NG10 2AA (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
No capacity data
(Estimated)
Fortis Green WBS, Woodside Avenue, Haringey, London, United Kingdom, N10 3HX (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4)
No capacity data
(Estimated)
Garrison Road, Sheerness, ME12 1BU (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
No capacity data
(Estimated)
Grain CHP Power Station Isle of Grain Rochester Kent ME3 0AR (1 component)

Gas-fired reciprocating engine

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
HULTON PARK, BOLTON, BL5 3JA (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
High Common Lane, Rossington DN11 0HP (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Honor Oak Ring Main Compound, Homestall Road, Southwark, London, United Kingdom, SE22 0SB (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4)
No capacity data
(Estimated)
Kinoulton, Hickling Road, Kinoulton, Nottinghamshire NG12 3ED (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Knapton Quarry, East Knapton, Malton, YO17 8JA (1 component)

A thermal treatment / CHP power generating unit located at Knapton Quarry in North Yorkshire.

Inactive • 2022-23 (T-4)
No capacity data
(Estimated)
Land at Durham Tees Valley Airport, DL2 1LU (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Land at Futura Park, West of Ransomes Way, Ipswich IP3 9SQ (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Land in the vicinity of Feeder Road, to the east of Phillip Street, Bristol BS2 0TH, UK (1 component)

The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Inactive • 2021-22 (T-4)
No capacity data
(Estimated)
Land off Dryden Road, Barnsley, S71 1JE (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Land off Nottingham Road, Loughborough Leicestershire LE11 1ET (1 component)

Energy centre comprising of lean burn, acoustically treated, national gas reciprocating engines.

Inactive • 2022-23 (T-4)
No capacity data
(Estimated)
No capacity data
(Estimated)
Land on Manchester Road, Carrington, Manchester, M31 4QN (1 component)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Loading map...