Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing last 2309 of 2309 unique locations - Page 1 of 93

Sort by: A-Z Components MW Date
to be provided once CMU Components are known (1 component)

to be provided once CMU Components are known

Inactive • 2020-21 (T-4), 2017-18 (TR) ...
91.69 MW (Est from CMU)
(Estimated)
former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (1 component)

CMU to comprise multiple individual storage units metered and despatched centrally

Active • 2026-27 (T-4), 2025-26 (T-4)
73.76 MW (Est from CMU)
(Estimated)
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (4 components)
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
No capacity data
(Estimated)
Yeomans Way, Bournemouth, BH8 0BQ (1 component)

DSR component offering load turn down at a retail store

Inactive • 2021-22 (T-4)
No capacity data
(Estimated)
Yeomans Way, Bournemouth, BH8 0BQ (1 component)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
0.73 MW (part of 0.73 MW aggregated CMU)
(Estimated)
No capacity data
(Estimated)
YWA CENTRAL DIVISION ECCUP WTW, ECCUP MOOR ROAD, LEEDS, WEST YORKSHIRE, LS16 8AW (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
No capacity data
(Estimated)
YORKSHIRE WATER SERVICES LIMITED, SOUTH MILFORD/WPS, COMMON LANE, SOUTH MILFORD, LEEDS, LS25 5BZ (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
No capacity data
(Estimated)
YORKSHIRE WATER PLC, KNOSTROP TREATMENT WORKS, KNOWSTHORPE LANE, LEEDS, LS9 0PJ (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
No capacity data
(Estimated)
YO8 (4 components)
• Domestic demand turn down
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
171.01 MW (Est from CMU) (part of 171.01 MW aggregated CMU)
(Estimated)
YO7 (4 components)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
110.08 MW (Est from CMU) (part of 110.08 MW aggregated CMU)
(Estimated)
YO51 (4 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
84.51 MW (Est from CMU) (part of 84.51 MW aggregated CMU)
(Estimated)
YO43 (2 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
94.19 MW (Est from CMU) (part of 94.19 MW aggregated CMU)
(Estimated)
YO41 (3 components)
• Domestic EV charger
• Domestic EV charge point
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
110.82 MW (Est from CMU) (part of 110.82 MW aggregated CMU)
(Estimated)
YO32 (4 components)
• Domestic EV charge point
• Domestic EV
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
103.05 MW (Est from CMU) (part of 103.05 MW aggregated CMU)
(Estimated)
YO30 (3 components)
• Domestic EV charger
• Domestic EV charge point
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
82.99 MW (Est from CMU) (part of 82.99 MW aggregated CMU)
(Estimated)
YO26 (4 components)
• Domestic demand turn down
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic EV charge point
Active • 2027-28 (T-4), 2025-26 (T-4) ...
104.74 MW (Est from CMU) (part of 104.74 MW aggregated CMU)
(Estimated)
YO25 (3 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
166.36 MW (Est from CMU) (part of 166.36 MW aggregated CMU)
(Estimated)
YO21 (3 components)
• Domestic EV charger
• Domestic EV charge point
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
54.41 MW (Est from CMU) (part of 54.41 MW aggregated CMU)
(Estimated)
YO17 (3 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
96.31 MW (Est from CMU) (part of 96.31 MW aggregated CMU)
(Estimated)
YO16 6GT (1 component)

Domestic EV charge point

Active • 2025-26 (T-1)
39.94 MW (Est from CMU) (part of 39.94 MW aggregated CMU)
(Estimated)
YO16 (3 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
54.10 MW (Est from CMU) (part of 54.10 MW aggregated CMU)
(Estimated)
YEWTREE HOUSE, CROXALL ROAD, ALREWAS, BURTON ON TRENT, STAFFORDSHIRE, DE13 7BA. (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4)
No capacity data
(Estimated)
YEWTREE HOUSE, CROXALL ROAD, ALREWAS, BURTON ON TRENT, STAFFORDSHIRE, DE13 7BA (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
(Estimated)
Wyelands RI, Lower Lydbrook, Gloucester, Gloucestershire, GL17 9PA (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
No capacity data
(Estimated)
Loading map...