Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing first 2270 of 2270 unique locations - Page 1 of 91

Sort by: A-Z Components MW Date
"Land to the east of Marl Road, Knowsley, Kirkby, L33 7UH (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
No capacity data
(Estimated)
15.46 MW (Est from CMU)
(Estimated)
1 Mallard Road, Peterborough, PE3 8YN (1 component)

"Planet Ice - UK 1 Mallard Road, Peterborough, PE3 8YN The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Active • 2017-18 (TR)
No capacity data
(Estimated)
1 Midland Road, London, NW1 1AT (1 component)

One GE Genbacher 612GS 2MWe CHP

Inactive • 2019-20 (T-1)
No capacity data
(Estimated)
1 Midland Road, London, NW1 IAT (1 component)

One GE Genbacher 612GS 2MWe CHP engine and one Caterpillar C175-16 ACERT 2.4MWe diesel backup generator

Active • 2019-20 (T-1)
No capacity data
(Estimated)
1 Thane Road West, Nottingham, NG2 3AA (1 component)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
101.02 MW (Est from CMU)
(Estimated)
1 Waterfront Avenue, Edinburgh, EH5 1SG (2 components)
• Office site with behind the meter back up generation
• Office site with behind the meter generation
• Office site with behind the meter generation.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
0.81 MW (Est from CMU) (part of 0.81 MW aggregated CMU)
(Estimated)
1-3 Loicher Lane, Ecclesfield, Sheffield, S35 9XN (1 component)

Generating unit

Active • 2025-26 (T-4)
No capacity data
(Estimated)
100 Montifichet Road, Westfield, Stratford E20 1GR (2 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
52.51 MW (Est from CMU)
(Estimated)
106 Scrubs Lane, Willesden, NW10 6QY (1 component)

"EMR European Metal Recycling 106 Scrubs Lane, Willesden, NW10 6QY The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Inactive • 2017-18 (TR)
No capacity data
(Estimated)
112 Beddington Lane, Beddington CR0 4TB (2 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
(Estimated)
112 Beddington Lane, Croydon, CR0 4TB (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Active • 2022-23 (T-4)
No capacity data
(Estimated)
13 - 18 Queen Street, Oxford, OX1 1AB (1 component)

DSR Component providing load turn down at a retail store

Active • 2021-22 (T-4)
No capacity data
(Estimated)
13-18 Queen Street, Oxford, OX1 1AB (1 component)

DSR component providing load turn down at a retail store

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
0.77 MW (Est from CMU) (part of 0.77 MW aggregated CMU)
(Estimated)
150 Maylands Avenue, Hemel Hempstead, Hertfordshire, HP2 7DF (1 component)

Back up generator at a data centre

Inactive • 2018-19 (T-1)
8.63 MW (Est from CMU) (part of 8.63 MW aggregated CMU)
(Estimated)
150 Maylands Avenue, Hemel Hempstead, Herts, HP2 7DF (1 component)

DSR Component providing load turn down at a data centre

Active • 2021-22 (T-4)
No capacity data
(Estimated)
16-18 Stall Street, Bath, BA1 1QB (1 component)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
0.73 MW (Est from CMU) (part of 0.73 MW aggregated CMU)
(Estimated)
167 - 600 Hollands Recycling, Bentley Road South, Darlaston, WS10 8LN (1 component)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
17 SHANNON WAY, ASHCHURCH, TEWKESBURY, GL20 8ND (1 component)

The CMU ComponeThe CMU Component reduces import demand by turning off equipment and other non-essential loads.nt reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-4), 2020-21 (T-1)
No capacity data
(Estimated)
173 High Street, Cheltenham, United Kingdom, GL50 1DF (1 component)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
0.77 MW (Est from CMU) (part of 0.77 MW aggregated CMU)
(Estimated)
174 - 601 Farnham Road, Upper Froyle, Alton, GU34 4JD (1 component)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
3.07 MW (Est from CMU) (part of 3.07 MW aggregated CMU)
(Estimated)
195 Aylesone Rd, Leicester LE2 7QJ (2 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
2 LIVINGSTONE BOULEVARD, HAMILTON INTNL TECHNOLOGY PARK, BLANTYRE, GLASGOW, G72 0BP (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-4), 2020-21 (T-1)
No capacity data
(Estimated)
2 Leeds City Office Park, Leeds, LS11 5BD (2 components)
• Office site with behind the meter back-up generation.
• Office site with behind the meter back-up generation
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
No capacity data
(Estimated)
2 Ratty's Lane, Hoddesdon, Hertfordshire EN11 0RF (1 component)

Municipal Waste Incineration Plant located in Hoddesdon, Hertfordshire. It is based on two boilers supplying steam to a turbine-generator.

Active • 2021-22 (T-4)
No capacity data
(Estimated)
Loading map...