Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing last 28 of 28 unique locations - Page 1 of 2

lLand off Lincomb Lane, Lincomb, Stourport On Severn, DY13 9RB (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
41.46 MW
(Estimated)
Unit A ? Apex 30, 233-269 London Road, Stainess, TW18 4JU (1 component)

The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW.

Active • 2022-23 (T-4), 2021-22 (T-4)
No capacity data
(Estimated)
Stevenage Electric Forecourt Knebworth Stevenage SG1 2AX (1 component)

6.000MW Battery Energy Storage System to be installed at Stevenage Electric Forecourt

Active • 2026-27 (T-4), 2023-24 (T-1)
4.06 MW (Est from CMU)
(Estimated)
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (1 component)
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
• 5MW, 1 hour/5MWh lithium-ion battery
• Slamseys is a 10MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
5.32 MW (Est from CMU)
(Estimated)
Plot B Land at Waterswallows Road, Buxton, SK17 7JT (1 component)

5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road

Active • 2024-25 (T-4)
No capacity data
(Estimated)
Plot A Land at Waterswallows Road, Buxton, SK17 7JT (1 component)
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
Active • 2024-25 (T-4)
16.00 MW (Est from CMU)
(Estimated)
Norwich East Electric Forecourt Broadland Gate Norwich NR13 5HB (1 component)

6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt

Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.40 MW (Est from CMU)
(Estimated)
Mill Hill, North West Industrial Estate, Peterlee, Durham, SR8 2JF (1 component)

The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Mill Hill, North West Industrial …

Active • 2027-28 (T-4)
28.30 MW
(Estimated)
Land to the south of Edinburgh Rd, Maryport, Cumbria, CA15 8ES. (1 component)

Electro-Chemical Battery Energy Storage System (BESS)

Active • 2020-21 (T-4)
No capacity data
(Estimated)
Land to the back of Kingdom Advance Network, Hawkins Ln, Burton-on-Trent DE14 1EJ (1 component)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 1.5 hours

Active • 2027-28 (T-4), 2026-27 (T-4)
7.32 MW
(Estimated)
Land parcel to the North of The Byre, Badsey Lane, Willersey, Gloucestershire, WR11 7HF (1 component)

Electro-Chemical Battery Energy Storage System (BESS)

Active • 2020-21 (T-4)
No capacity data
(Estimated)
Land off Sir William Smith Road, Kirkton Industrial Estate, D11 3RD (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
20.94 MW
(Estimated)
Land off Barge Way, Kemsley Fields Business Park, Sittingbourne ME10 2FE (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
41.84 MW
(Estimated)
Land at William Nadin Way, Tetron Point, Swadlincote, DE11 0WT (1 component)

2 x 2MW Gas fuelled generator units to be installed on designated land within a compound located at Tetron point

Active • 2024-25 (T-4)
3.81 MW (Est from CMU)
(Estimated)
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (1 component)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Active • 2026-27 (T-4)
2.36 MW
(Estimated)
Land at Lincomb Farm, Lincomb, Stourport-On-Severn, DY13 9RB (1 component)

Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.

Active • 2027-28 (T-4)
18.47 MW
(Estimated)
Land West Of Slack Lane, Westhoughton, Bolton, BL5 3LB (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
6.28 MW
(Estimated)
Land West Of Slack Lane, Westhoughton, Bolton BL5 3LB (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
6.28 MW
(Estimated)
Land West Of Kegworth Road, Ratcliffe On Soar, Nottinghamshire,NG11 0EA (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
41.84 MW
(Estimated)
Land Off Severn Road Hallen Bristol South Gloucestershire BS10 7SE (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
29.32 MW
(Estimated)
Land North Of Stoke Lane Dunston Norfolk, NR14 8QD (1 component)

" Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration"

Active • 2028-29 (T-4)
29.32 MW
(Estimated)
Land Lying To The South Of Manor Farm, Ratcliffe On Soar, Nottingham NG11 0EA (1 component)

Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.

Active • 2027-28 (T-4)
18.47 MW
(Estimated)
Generation Compound Land Off Titanium Road, Swansea, SA5 4SG (1 component)

A new build gas fuelled generation plant with ancilliary equipment.

Active • 2028-29 (T-4)
37.40 MW
(Estimated)
Gatwick Electric Forecourt Buckingham Gate Gatwick RH6 0NT (1 component)

A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt

Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.92 MW (Est from CMU)
(Estimated)
Gateshead Electric Forecourt Park Road Felling by-pass Gateshead NE10 0EA (1 component)

6.000MW Battery Energy Storage System to be installed at Gateshead Electric Forecourt

Active • 2026-27 (T-4), 2023-24 (T-1)
4.77 MW (Est from CMU)
(Estimated)
Loading map...