Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing last 1412 of 1412 unique locations - Page 1 of 57

Sort by: A-Z Components MW Date
llanddewi Brefi Road, Tregaron, SY25 6JP (1 component)

STOR diesel engines that will operate environmentally with mixed fuel

Active • 2026-27 (T-4), 2023-24 (T-1)
18.92 MW (Est from CMU)
(Estimated)
134.75 MW
(Estimated)
land adjacent to Netherlands Way / Europa Way Stallingborough Grimsby DN41 8DT (1 component)

10 x 2MW gas reciprocating engines

Active • 2023-24 (T-4), 2022-23 (T-3)
No capacity data
(Estimated)
Yard (see map) near to 137 Netherton Street, Wishaw, ML2 0EY (1 component)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
(Estimated)
YWA CENTRAL DIVISION ECCUP WTW, ECCUP MOOR ROAD, LEEDS, WEST YORKSHIRE, LS16 8AW (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
No capacity data
(Estimated)
14.00 MW (Est from CMU) (part of 14.00 MW aggregated CMU)
(Estimated)
YORKSHIRE WATER SERVICES LIMITED, SOUTH MILFORD/WPS, COMMON LANE, SOUTH MILFORD, LEEDS, LS25 5BZ (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
No capacity data
(Estimated)
YORKSHIRE WATER PLC, SEWAGE TREATMENT WORKS, ALDWARKE, ROTHERHAM, SOUTH YORKSHIRE, S65 3SR (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
No capacity data
(Estimated)
YORKSHIRE WATER PLC, KNOSTROP TREATMENT WORKS, KNOWSTHORPE LANE, LEEDS, LS9 0PJ (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
No capacity data
(Estimated)
YORKSHIRE WATER PLC, CHELLOW HEIGHTS W T W, HAWORTH ROAD, BRADFORD, BD9 6NX (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
14.00 MW (Est from CMU) (part of 14.00 MW aggregated CMU)
(Estimated)
No capacity data
(Estimated)
YORKSHIRE WATER PLC, CALDER VALE ROAD, WAKEFIELD, WF1 5PJ (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
No capacity data
(Estimated)
YORKSHIRE WATER PLC, ASHGROVE ROAD, BRADLEY, HUDDERSFIELD, HD2 1FE (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
No capacity data
(Estimated)
No capacity data
(Estimated)
14.00 MW (Est from CMU) (part of 14.00 MW aggregated CMU)
(Estimated)
No capacity data
(Estimated)
YO7 (4 components)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
110.08 MW (Est from CMU) (part of 110.08 MW aggregated CMU)
(Estimated)
YO62 (4 components)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic EV
• Domestic EV charger
Active • 2025-26 (T-1), 2024-25 (T-4) ...
48.27 MW (Est from CMU) (part of 48.27 MW aggregated CMU)
(Estimated)
YO61 (3 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
64.27 MW (Est from CMU) (part of 64.27 MW aggregated CMU)
(Estimated)
YO32 (4 components)
• Domestic EV charge point
• Domestic EV
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
103.05 MW (Est from CMU) (part of 103.05 MW aggregated CMU)
(Estimated)
YO23 (3 components)
• Domestic demand turn down
• Domestic EV charger
• Domestic EV
Active • 2027-28 (T-4), 2025-26 (T-4) ...
68.97 MW (Est from CMU) (part of 68.97 MW aggregated CMU)
(Estimated)
Loading map...