Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing first 44 of 44 unique locations - Page 1 of 2

Sort by: A-Z Components MW Date
Arreton Valley Nursery, Hale common, Arreton, Isle of Wight, PO30 3AR (1 component)

Industrial flexible demand used for manufacturing processes and remotely controlled via SCADA.

Active • 2028-29 (T-4), 2024-25 (T-1)
10.16 MW (Est from CMU)
(Estimated)
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (1 component)
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• !MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.83 MW (Est from CMU) (part of 14.83 MW aggregated CMU)
(Estimated)
Birmingham Children?s Hospital, Steelhouse Lane, Birmingham, B4 6NH (1 component)

1.6MW Combined Heat and Power Plant at Birmingham Children Hospital

Active • 2025-26 (T-4), 2024-25 (T-4) ...
6.51 MW (Est from CMU) (part of 6.51 MW aggregated CMU)
(Estimated)
Bonnington Power Station Nr Lanark Scotland, ML11 9TB (1 component)
• Bonnington hydro power station - Unit 1, part of the Lanark hydroelectric scheme
• Bonnington hydro power station - Unit 2, part of the Lanark hydroelectric scheme
Active • 2028-29 (T-4)
10.01 MW
(Estimated)
Carsphairn, St Johns Town of Dalry, Castle Douglas, Dumfries and Galloway, DG7 3TJ (1 component)

Drumjohn hydro power station - Unit 1, part of the Galloway hydroelectric scheme

Active • 2028-29 (T-4), 2027-28 (T-4)
4.40 MW (Est from CMU)
(Estimated)
Connah's Quay 400 kV Substation (1 component)

The East West Interconnector (EWIC) is a 400kV HVDC link between Connah's Quay in Wales and Woodland in Ireland.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
(Estimated)
Connah's Quay 400 kV Substation, Kelsterton Lane, Connah?s Quay, Flintshire, North Wales, CH5 4BP (1 component)

The East West Interconnector (EWIC) is a 400kV HVDC link between Connah's Quay in Wales and Woodland in Ireland.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
544.85 MW (Est from CMU)
(Estimated)
Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ (1 component)

A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3037.88 MW (Est from CMU)
(Estimated)
Deeside 400kV Substation, Kelsterton Road, Connahs Quay, Deeside, Clwyd, CH5 4BP (1 component)

The East West Interconnector (EWIC) is a 400kV HVDC link between Deeside in Wales and Woodland in Ireland.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
50.50 MW (Est from CMU)
(Estimated)
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (1 component)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5209.30 MW (Est from CMU)
(Estimated)
Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (1 component)
• Unit 5 is a Cogeneration unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG244 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power generation units on the site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02).
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG-19, EMD-19 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02). Gross 3 HH av. peak generation from Unit 5 on separate days = 141.040 MW At these three HH times, aux load on Unit 5 = 2.597 MW Net generation from Unit 5 = 138.443 MW
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, EPCO1. All Components of EMG-18, EMD-U3 and EMD-T1 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. Gross 3 HH av. peak generation from Unit 5 on separate days = 139.707 MW At these three HH times, aux load on Unit 5 = 2.517 MW Net generation from Unit 5 = 137.190 MW
Active • 2028-29 (T-4), 2027-28 (T-4) ...
382.93 MW (Est from CMU)
(Estimated)
Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (1 component)
• TG1B is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which TG1B is the larger. This Generating Unit is embedded in the 'E_FAWND' BMU and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of 'EMD244' are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power generation units on the site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (part of MSID 7095). Both Unit 3 and TG1B units share various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested.
• Unit 3 is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which Unit 3 is the smallest. This Generating Unit is embedded in the ?E_FAWND? BMU and is part of the larger site inclusive BM Trading Unit, ?EPCO1?. All Components of ?EMD244? are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 3 is one of three power generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). Both units share various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to Unit 3 and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested.
• TG1B is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which TG1B is the larger. This Generating Unit is embedded in the 'E_FAWND' BMU and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of 'EMD-19' are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power generation units on the site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (part of MSID 7095). Both Unit 3 and TG1B units share various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested. To clarify the 3 units within the refinery boundary, they are Unit 5 (EMG-19) and TG1B and Unit 3 (which make up EMD-19). Gross 3 HH av. peak generation from TG1B on separate days = 49.863 MW At these three HH times, aux load on TG1B = -1.468 MW Net generation from TG1B = 48.394 MW
Active • 2028-29 (T-4), 2027-28 (T-4) ...
774.43 MW (Est from CMU)
(Estimated)
Excel Energy Centre Warehouse R Royal Victoria Dock Northside London E16 1BA (1 component)
• 1.2 MW Combined Heat and Power Engine.
• 1.6 MW Combined Heat and Power Engine
• 3MW Diesel Generators at Excel Exhibition Energy Centre London
Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.82 MW (Est from CMU) (part of 15.82 MW aggregated CMU)
(Estimated)
Ffestiniog Power Station, Tanygrisiau, Blaenau Ffestiniog, LL41 3TP (1 component)
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage).
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
• BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage)
Active • 2025-26 (T-4), 2024-25 (T-4) ...
476.10 MW (Est from CMU)
(Estimated)
Fielding & Johnson Building University Of Leicester University Road LEICESTER Leicestershire LE1 7RH (1 component)
• Combined Heat and Power Plant, University of Leicester, capacity of generator 1.600MW
• Combined Heat and Power Plant, University of Leicester, generator's capacity 1.600MW
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.24 MW (Est from CMU) (part of 12.24 MW aggregated CMU)
(Estimated)
Glyn Rhonwy Pumped Storage Facility, Ffordd Clegir, Caernarfon, Gwynedd LL55 4EL Note: The site is currently brown field with no ability to receive post. As such this address uses the nearest current postcode. (1 component)
• 49.999 MW pumped storage facility in Gwynedd, North Wales.
• 49.950 MW pumped storage facility in Gwynedd, North Wales.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
284.81 MW (Est from CMU)
(Estimated)
Goyt Hall Farm, Dark Lane, Romiley, Stockport SK6 3LH (2 components)
• A distribution connected Battery Energy Storage System
• A Battery Energy Storage System
Active • 2028-29 (T-4), 2025-26 (T-4)
24.27 MW (Est from CMU)
(Estimated)
International Conference Centre, Birmingham, B1 2EA (1 component)

1.6MW Combined Heat and Power at International Conference Centre

Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.73 MW (Est from CMU) (part of 6.73 MW aggregated CMU)
(Estimated)
Land East Of Edgemoor Titchsborough Hill Otterham Station Camelford Cornwall PL32 9XU (1 component)
• A new build diesel and/or gas dual fuel generating station consisting of 47 generator units of 440KW each
• An operational 20 MW diesel fuelled generating station with existing T-1 and T-4 CM Contracts.
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
No capacity data
(Estimated)
No capacity data
(Estimated)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (1 component)
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
• The CMU component JENBA2 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
• The CMU component JENBA1 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
No capacity data
(Estimated)
National Indoor Arena, King Edward Road, Birmingham, B1 2AA (1 component)
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 081171171
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.80 MW (Est from CMU) (part of 7.80 MW aggregated CMU)
(Estimated)
New Galloway, Castle Douglas, Kirkcudbrightshire, DG7 3SF, Scotland (1 component)
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
78.70 MW (Est from CMU)
(Estimated)
Plot 4A, Hurlawcrook Road, East Kilbride, Glasgow G75 0ZZ (1 component)

A distribution connected New Build Battery Energy Storage System

Active • 2028-29 (T-4)
4.19 MW
(Estimated)
Royal South Hants Hospital, Graham Road, Southampton, Hampshire, SO14 0YG (2 components)

0.725MW Combined Heat and Power Plant Royal South Hants Hospital

Active • 2025-26 (T-4), 2024-25 (T-4) ...
47.83 MW (Est from CMU) (part of 47.83 MW aggregated CMU)
(Estimated)
Loading map...