Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing last 44 of 44 unique locations - Page 1 of 2

Sort by: A-Z Components MW Date
Wright Street, Paisley, Renfrew, PA4 8AN (1 component)

Battery Energy Storage, 49.990 MW installed for a 2hr system.

Active • 2028-29 (T-4)
20.94 MW
(Estimated)
Wight Salads Arreton Newport Isle of Wight PO30 3AR (1 component)

The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used

Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
5.48 MW (Est from CMU)
(Estimated)
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (1 component)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. …

Active • 2026-27 (T-4), 2025-26 (T-4) ...
2154.60 MW (Est from CMU)
(Estimated)
West Marsh Road, Spalding, Lincolnshire, PE11 2BB (1 component)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. …

Active • 2028-29 (T-4), 2021-22 (T-4) ...
1338.64 MW (Est from CMU)
(Estimated)
Warehouse R Royal Victoria Dock Northside London E16 1BA (1 component)

1.2MW Combined Heat and Power Engine

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
(Estimated)
Tongland, Kirkcudbrightshire. DG6 4LT. Scotland (1 component)
• Tongland hydro power station - Unit 2 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.
• Tongland hydro power station - Unit 3 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.
• Tongland hydro power station - Unit 1 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
No capacity data
(Estimated)
Tongland, Kirkcudbrightshire, DG6 4LT, Scotland (1 component)
• Tongland hydro power station - Unit 2, part of the Galloway hydroelectric scheme
• Tongland hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Tongland hydro power station - Unit 3, part of the Galloway hydroelectric scheme
Active • 2028-29 (T-4), 2027-28 (T-4) ...
71.83 MW (Est from CMU)
(Estimated)
The Manor Way, Stanford-le-Hope, Essex, SS17 9GN (1 component)

A CCGT station consisting of two Alstom GT26 gas turbines and a steam turbine and is based near Stanford-le-hope in Essex, England. Each turbine is individually metered with output being …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1985.92 MW (Est from CMU)
(Estimated)
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (2 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
32.05 MW (Est from CMU) (part of 32.05 MW aggregated CMU)
(Estimated)
The CMU is located within the physical boundaries of Esso Petroleum Company Linited's Oil Refinery at; Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX (1 component)

The CMU is a Gas Turbine Combined Heat & Power Unit connected to the Local Distribution Network at 132kV at their Fawley North Sub-Station

Inactive • 2020-21 (T-4), 2017-18 (T-1)
103.62 MW
(Estimated)
Tees Valley Nursery, The Moat, Billingham, TS23 4ED (1 component)

Industrial load that is independently metered and controllable via SCADA. Load can be operated for 8+ hours.

Active • 2028-29 (T-4)
2.52 MW (Est from CMU)
(Estimated)
Stonebyres Power Station, Lanark, ML11 9UP (1 component)
• Stonebyres hydro power station - Unit 1, part of the Lanark hydroelectric scheme
• Stonebyres hydro power station - Unit 2, part of the Lanark hydroelectric scheme
Active • 2028-29 (T-4)
5.82 MW
(Estimated)
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (1 component)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.44 MW (Est from CMU) (part of 5.44 MW aggregated CMU)
(Estimated)
St Johns Town of Dalry, Castle Douglas, Kirkcudbrightshire, DG7 3UB, Scotland (1 component)
• Kendoon hydro power station - Unit 2, part of the Galloway hydroelectric scheme
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Kendoon hydro power station - Unit 1 Part of the Galloway hydroelectric scheme Registered capacity = 26.25MVA or 24MW at 0.915PF. Each of the 2 components = 12MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
94.45 MW (Est from CMU)
(Estimated)
St Johns Town of Dalry, Castle Douglas Kirkcudbright, DG7 3ST (1 component)
• Carsfad hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Carsfad hydro power station - Unit 2, part of the Galloway hydroelectric scheme
Active • 2028-29 (T-4), 2027-28 (T-4)
38.26 MW
(Estimated)
St Johns Town of Dalry Castle, Douglas Kirkcudbright, DG7 3SR (1 component)
• Earlstoun hydro power station - Unit 2, part of the Galloway hydroelectric scheme
• Earlstoun hydro power station - Unit 1, part of the Galloway hydroelectric scheme
Active • 2028-29 (T-4), 2027-28 (T-4)
44.63 MW (Est from CMU)
(Estimated)
Sanquhar II, Sanquhar, Dumfries and Galloway. DG4 6LJ (1 component)

New Build Generation CMU - Battery Energy Storage System.

Active • 2028-29 (T-4)
36.44 MW
(Estimated)
Saltend Power Station Saltend Hull HU12 8GA (1 component)
• Unit 2 at Saltend Power Station
• Unit 1 at Saltend Power Station
• Unit 3 at Saltend Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3486.78 MW (Est from CMU)
(Estimated)
SO45 1TX (1 component)
• Unit 3 is part of the aggregated CMU EM3-21, which is made up of 3 Generating Units of which Unit 3 is the smallest. This Generating Unit is embedded in the E_FAWND BMU and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 3 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU - TG1B).
• Unit 5 is part of the aggregated CMU EM3-21, which made up of 3 Generating Units of which Unit 5 is the largest. This Generating Unit forms the E_FAWN-1 BMU on its own and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (MSID 7081). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW.
• TG1B is part of the aggregated CMU EM3-21, which is made up of 3 Generating Units of which TG1B of medium size. This Generating Unit is embedded in the E_FAWND BMU and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power and steam generation units on site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU - Unit 3).
Active • 2021-22 (T-4)
No capacity data
(Estimated)
Royal South Hants Hospital, Graham Road, Southampton, Hampshire, SO14 0YG (2 components)

0.725MW Combined Heat and Power Plant Royal South Hants Hospital

Active • 2025-26 (T-4), 2024-25 (T-4) ...
47.83 MW (Est from CMU) (part of 47.83 MW aggregated CMU)
(Estimated)
Plot 4A, Hurlawcrook Road, East Kilbride, Glasgow G75 0ZZ (1 component)

A distribution connected New Build Battery Energy Storage System

Active • 2028-29 (T-4)
4.19 MW
(Estimated)
New Galloway, Castle Douglas, Kirkcudbrightshire, DG7 3SF, Scotland (1 component)
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
78.70 MW (Est from CMU)
(Estimated)
National Indoor Arena, King Edward Road, Birmingham, B1 2AA (1 component)
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 081171171
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.80 MW (Est from CMU) (part of 7.80 MW aggregated CMU)
(Estimated)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (1 component)
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
• The CMU component JENBA2 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
• The CMU component JENBA1 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
No capacity data
(Estimated)
Land East of Edgemoor, Titchsborough Hill, Otterham Down, Camelford, Cornwall, PL32 9XU (1 component)

A 20MW power generating unit comprising multiple reciprocating engines.

Inactive • 2019-20 (T-1)
No capacity data
(Estimated)
Loading map...