Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing last 2013 of 2013 unique locations - Page 1 of 81

Sort by: A-Z Components MW Date
llanddewi Brefi Road, Tregaron, SY25 6JP (1 component)

STOR diesel engines that will operate environmentally with mixed fuel

Active • 2026-27 (T-4), 2023-24 (T-1)
18.92 MW (Est from CMU)
(Estimated)
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (2 components)
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
• Battery Storage plant
• Gas reciprocating engines
Active • 2027-28 (T-4), 2026-27 (T-4) ...
286.73 MW
(Estimated)
134.75 MW
(Estimated)
land adjacent to Netherlands Way / Europa Way Stallingborough Grimsby DN41 8DT (1 component)

10 x 2MW gas reciprocating engines

Active • 2023-24 (T-4), 2022-23 (T-3)
No capacity data
(Estimated)
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (4 components)
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
No capacity data
(Estimated)
Yorkshire Way, Armthorpe, Doncaster DN3 3GW (1 component)

Behind-the-meter battery storage system at IKEA's Doncaster distribution centre

Inactive • 2021-22 (T-4)
No capacity data
(Estimated)
Yard (see map) near to 137 Netherton Street, Wishaw, ML2 0EY (1 component)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
(Estimated)
Yalberton Road, Paignton, TQ4 7QL (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2025-26 (T-4)
2.99 MW (Est from CMU)
(Estimated)
YWA CENTRAL DIVISION ECCUP WTW, ECCUP MOOR ROAD, LEEDS, WEST YORKSHIRE, LS16 8AW (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
No capacity data
(Estimated)
14.00 MW (Est from CMU) (part of 14.00 MW aggregated CMU)
(Estimated)
YORKSHIRE WATER SERVICES LIMITED, SOUTH MILFORD/WPS, COMMON LANE, SOUTH MILFORD, LEEDS, LS25 5BZ (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
No capacity data
(Estimated)
YORKSHIRE WATER PLC, SEWAGE TREATMENT WORKS, ALDWARKE, ROTHERHAM, SOUTH YORKSHIRE, S65 3SR (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
No capacity data
(Estimated)
YORKSHIRE WATER PLC, KNOSTROP TREATMENT WORKS, KNOWSTHORPE LANE, LEEDS, LS9 0PJ (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
No capacity data
(Estimated)
YORKSHIRE WATER PLC, CHELLOW HEIGHTS W T W, HAWORTH ROAD, BRADFORD, BD9 6NX (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
14.00 MW (Est from CMU) (part of 14.00 MW aggregated CMU)
(Estimated)
No capacity data
(Estimated)
YORKSHIRE WATER PLC, CALDER VALE ROAD, WAKEFIELD, WF1 5PJ (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
No capacity data
(Estimated)
YORKSHIRE WATER PLC, ASHGROVE ROAD, BRADLEY, HUDDERSFIELD, HD2 1FE (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
No capacity data
(Estimated)
No capacity data
(Estimated)
14.00 MW (Est from CMU) (part of 14.00 MW aggregated CMU)
(Estimated)
No capacity data
(Estimated)
YO7 (4 components)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
110.08 MW (Est from CMU) (part of 110.08 MW aggregated CMU)
(Estimated)
Loading map...