Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing last 5 of 5 unique locations

Severnside Energy Recovery Centre Severn Road Hallen, Bristol South Gloucestershire BS10 7SP (1 component)
• Existing Energy from Waste Plant
• New Build Energy from Waste Plant
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
28.91 MW (Est from CMU)
(Estimated)
Kings Yard Energy Centre, Carpenters Lane, Stratford, London E15 2DU (2 components)

Combined Heat and Power Plant Olympic Park London

Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.93 MW (Est from CMU)
(Estimated)
Isis House, Howard Road Park North Farm Redditch Worcester B98 7SE (1 component)

10MW battery storage installed at Worcester

Active • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
(Estimated)
47-53 Charterhouse Street, London, EC1M 6PB (1 component)
• A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
• A site with two reciprocating gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
28.03 MW (Est from CMU)
(Estimated)
100 Montifichet Road, Westfield, Stratford E20 1GR (2 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
52.51 MW (Est from CMU)
(Estimated)
Loading map...