Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing first 98 of 98 unique locations - Page 1 of 4

Sort by: A-Z Components MW Date
*Please see cover letter regarding postcode Aberarder Wind Farm, Aberarder Estate, Strathnairn, Highland Scotland (1 component)

New build wind farm at Aberarder consisting of 12 wind turbines.

Active • 2023-24 (T-4), 2022-23 (T-3)
4.10 MW (Est from CMU)
(Estimated)
4.57 MW
(Estimated)
No capacity data
(Estimated)
Ardrossan Windfarm, Haupland and Busbie Muir, Little Busbie Farm, Ardrossan, Ayrshire, KA22 7NU (1 component)

This CMU is Ardrossan wind farm, an onshore wind farm situated in Scotland

Active • 2028-29 (T-4), 2027-28 (T-4)
4.09 MW
(Estimated)
Boarhunt Rd, Fareham, PO17 6AJ (2 components)

Gas fired reciprocating engines

Inactive • 2020-21 (T-4), 2019-20 (T-1)
No capacity data
(Estimated)
Braes of Doune Wind Farm, Milton of Cambus, Nr Doune,FK16 6HG (1 component)

36-turbine wind farm in Doune with a connection capacity of 74.000 MW

Active • 2028-29 (T-4)
14.74 MW
(Estimated)
C35, Castle Douglas , Scotland, DG7 3UF (1 component)

12-turbine wind farm located in Scotland with the installed capacity of 43.200MW

Active • 2028-29 (T-4), 2025-26 (T-1)
6.14 MW
(Estimated)
C35, DG7 3UF, Castle Douglas , Scotland (1 component)

12-turbine wind farm located in Scotland with the installed capacity of 43.200MW

Active • 2027-28 (T-4), 2026-27 (T-4) ...
23.45 MW (Est from CMU)
(Estimated)
3.13 MW
(Estimated)
Carlton Forest, Blyth Road, Worksop, S81 0TP (1 component)
• A New Build 8MW ACT generating station using a closed loop steam system.
• A New Build 8MW Fuelled Generating Station.
• A New Build 10MW Fuelled Generating Station.
Inactive • 2021-22 (T-4)
No capacity data
(Estimated)
Chirmorie Wind Farm C72 FROM Gowland Terrace Barrhill, South of Chirmorie from Barrhill South Ayrshire Scotland (1 component)

This CMU will be formed of multiple wind turbine generator units controlled centrally & exporting to the Transmission system.

Active • 2023-24 (T-4), 2022-23 (T-3)
No capacity data
(Estimated)
Cirencester Solar Farm Witpit Lane Preston Cirencester GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (1 component)

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm

Active • 2025-26 (T-4), 2024-25 (T-1) ...
30.64 MW (Est from CMU)
(Estimated)
Common Farm Bookers Lane Dinnington Sheffield S25 1ZX England (1 component)

AC coupled lithium Battery Energy Storage System with associated infrastructure.

Active • 2028-29 (T-4)
13.73 MW
(Estimated)
Common Farm Bookers Lane Dinnington Sheffield S25 1ZX United Kingdom (1 component)

Solar photovoltaic array located in Dinnington, Sheffield, South Yorkshire. The site will consist of solar PV panels and the associated necessary infrastructure.

Active • 2028-29 (T-4)
5.27 MW
(Estimated)
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (1 component)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
34.61 MW (Est from CMU)
(Estimated)
Cumberhead Wind Farm, Douglas, Lanark, ML11 0SY (1 component)

New build windfarm.

Active • 2026-27 (T-4), 2023-24 (T-1)
14.94 MW (Est from CMU)
(Estimated)
Dalquhandy Wind Farm, Dalquhandy Opencast Coal Site, Middlemuir Road, Coalburn, ML11 0EL (1 component)

New build onshore wind farm.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
18.81 MW (Est from CMU)
(Estimated)
Dalquhandy Wind Farm, Dalquhandy Opencast Coal Site, Middlemuir Road, Coalburn, ML11 0NN (1 component)

10 turbine onshore wind farm with a gross installed capacity of 42 MW in Lanarkshire, Scotland

Active • 2025-26 (T-1), 2024-25 (T-1)
6.77 MW (Est from CMU)
(Estimated)
Dunsteads Farm, Trueloves Lane, Ingatestone, CM4 0NH (1 component)

20MW gas fuelled plant using new containerised engines with associated switchgear, substation and gas metering kiosk, and connections to the electricity and gas grid. The total planned capital expenditure for …

Active • 2022-23 (T-4)
No capacity data
(Estimated)
Eisteddfa Gurig, Nr Ponterwyd, Aberystwyth, Ceredigion, Wales, UK, SY23 3LE (1 component)
• New Werfa - section of Cambrian wind farm
• Cefyn Croes - section of Cambrian wind farm
Active • 2028-29 (T-4)
7.77 MW
(Estimated)
FULWOOD GRANGE FARM PINXTON LANE SUTTON IN ASHFIELD NG17 1JF (1 component)
• NEW BUILD GAS FUELLED GENERATING STATION
• NEW BUILD GAS FUELLED GENERATION STATION
Active • 2021-22 (T-4), 2020-21 (T-4)
No capacity data
(Estimated)
Farr and Glenkyllachy Estate, Inverness-shire. IV13 7YA (1 component)

20 turbine Onshore wind farm.

Active • 2023-24 (T-4), 2022-23 (T-3)
No capacity data
(Estimated)
Grand Union Farm Rising Lane Baddesley Clinton SOLIHULL B93 0FJ (1 component)

CMU consists of Stationary Lithium ion Battery with ability to export or import 10MW via grid site connection

Inactive • 2018-19 (T-1)
No capacity data
(Estimated)
Hadyard Hill Wind Farm, Girvan, Ayrshire, KA26 9TH (1 component)

Wind farm consisting of 52 wind turbines,7km to the east of Girvan town

Active • 2028-29 (T-4)
6.63 MW
(Estimated)
Harting Rig Wind Farm, Lambhill Road, Nr Strathaven, South Lanarkshire, ML106XF (1 component)

Wind Turbine Generators x 15

Active • 2026-27 (T-4), 2024-25 (T-1) ...
24.82 MW (Est from CMU)
(Estimated)
Loading map...