*Please see cover letter regarding postcode Aberarder Wind Farm, Aberarder Estate, Strathnairn, Highland Scotland (1 component)

New build wind farm at Aberarder consisting of 12 wind turbines.

Active • 2023-24 (T-4), 2022-23 (T-3)
4.10 MW (Est from CMU)
(Estimated)
Ash Road, Protos, CH2 4RX (1 component)

49.5 MW Gas Reciprocating Engines envisaged to be made up of multiple modules.

Active • 2024-25 (T-4)
47.13 MW (Est from CMU)
(Estimated)
Birch Holt Farm Burton By Lincoln LN1 2RG (1 component)

The CMU component at Leverton Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 9.8 MW export capacity and an import capacity of 5MW.

Inactive • 2018-19 (T-1)
No capacity data
(Estimated)
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (2 components)
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
• 1.200MW Battery Energy Storage System
• 1.2 MW of demand reduction
Active • 2024-25 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Bullo Road, Fieldhouse, Awre, GL14 1EL (1 component)

New build 1.5 hour duration battery storage

Active • 2026-27 (T-4)
1.60 MW
(Estimated)
Carlton Forest, Blyth Road, Worksop, S81 0TP (1 component)
• A New Build 8MW ACT generating station using a closed loop steam system.
• A New Build 8MW Fuelled Generating Station.
• A New Build 10MW Fuelled Generating Station.
Inactive • 2021-22 (T-4)
No capacity data
(Estimated)
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (2 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …

Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.27 MW (Est from CMU)
(Estimated)
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (1 component)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
34.61 MW (Est from CMU)
(Estimated)
Duncombe Road Bradford BD8 9RR (1 component)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4)
No capacity data
(Estimated)
Europa Energy Centre, Hills Court Road, Ash, Kent, CT3 2AP (1 component)
• The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component BREH02 consists of one CHP engine supplying heat, CO2 and power to the on-site Nursery.
• The CMU BREH14 consists of two CHP components supplying heat, CO2 and power to the on-site Nursery.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
95.49 MW (Est from CMU)
(Estimated)
Glasgow and Edinburgh Rd, Motherwell ML1 5SY, UK (1 component)

diesel and or gas reciprocating engines

Inactive • 2020-21 (T-4), 2017-18 (T-1)
No capacity data
(Estimated)
Kirkthorpe Weir Kirkthorpe Wakefield West Yorkshire WF1 5SY (1 component)

The CMU component at Kirkthorpe is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW

Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
(Estimated)
Land Adjacent to Britannia House Dock Road Poulton CH41 1DF (1 component)
• 15MW BESS envisaged to be made up of multiple modules operated at 5MW
• 10MW Gas Reciprocating Engines envisaged to be made up of multiple modules
Active • 2021-22 (T-4)
No capacity data
(Estimated)
Land Adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Active • 2022-23 (T-4)
No capacity data
(Estimated)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (1 component)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
12.74 MW
(Estimated)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
7.10 MW (Est from CMU)
(Estimated)
Land West of Honiley Road (A4177), Honiley, Kenilworth, CV35 7LY (2 components)

A 57.000 MW / 85.500 MWh battery energy storage system

Active • 2028-29 (T-4), 2027-28 (T-4)
24.54 MW
(Estimated)
31.32 MW
(Estimated)
Land at Ellbridge Farm, Ellbridge Lane, Hatt Saltash PL12 6PU (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2028-29 (T-4)
16.07 MW
(Estimated)
Land close to Smeaton Shaw Farm, Dalkeith, EH22 2NL (1 component)

2H duration Lithium Ion Battery Storage New Build CMU.

Active • 2028-29 (T-4)
35.18 MW
(Estimated)
Land directly South to Coventry Substation Parrotts Grove Coventry CV2 1NQ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2024-25 (T-4)
No capacity data
(Estimated)
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2023-24 (T-1)
49.98 MW (Est from CMU)
(Estimated)
Land north east of Bustleholm Substation Painswick Close Walsall WS5 4SJ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2024-25 (T-4)
No capacity data
(Estimated)
Land north east of Bustleholm Substation, M6, Walsall, WS5 4SJ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2023-24 (T-1)
33.32 MW (Est from CMU)
(Estimated)
Land north of Indian Queens Substation, Domellick Hill (B3279), St Dennis, St Austell, Cornwall, PL26 8BY (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4), 2025-26 (T-1)
32.03 MW
(Estimated)