Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing first 1513 of 1513 unique locations - Page 1 of 61

Sort by: A-Z Components MW Date
"Arqiva Crawley Court Winchester Hampshire" SO212QA (1 component)

Battery/generator UPS

Active • 2018-19 (T-1)
No capacity data
(Estimated)
No capacity data
(Estimated)
No capacity data
(Estimated)
No capacity data
(Estimated)
No capacity data
(Estimated)
No capacity data
(Estimated)
"Arqiva Site Pontop Pike Lane Dipton Stanley Durham" DH99AT (1 component)

Battery/generator UPS

Active • 2018-19 (T-1)
No capacity data
(Estimated)
No capacity data
(Estimated)
"Arqiva Site Wychbold Nr. Droitwich Worcestershire" WR90DF (1 component)

Battery/generator UPS

Active • 2018-19 (T-1)
No capacity data
(Estimated)
No capacity data
(Estimated)
"Butchersfield Landfill Site, Rixton Old Hall, Manchester Road, Rixton, WARRINGTON, WA3 6EW" (1 component)

2 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery

Inactive • 2020-21 (T-4), 2017-18 (T-1)
No capacity data
(Estimated)
"CROYDON SOUTH NORWOOD HILL Croydon Greater London 2" SE256BQ (1 component)

Battery/generator UPS

Active • 2018-19 (T-1)
No capacity data
(Estimated)
"Caldbeck Maintenance Centre Brocklebank Caldbeck Wigton Cumbria" CA78DW (1 component)

Battery/generator UPS

Active • 2018-19 (T-1)
No capacity data
(Estimated)
"Emley Moor SC Jagger Lane Emley Moor Huddersfield West Yorkshire" HD89TQ (1 component)

Battery/generators UPS

Active • 2018-19 (T-1)
No capacity data
(Estimated)
"Grimsargh Preston Lancashire PR2 5LE " (1 component)

Turn down CMU

Inactive • 2017-18 (T-1)
No capacity data
(Estimated)
"SANDY HEATH MAINTENANCE CENTRE Sandy Potton Bedfordshire" SG192NH (1 component)

Battery/generator UPS

Active • 2018-19 (T-1)
No capacity data
(Estimated)
"Site Rowridge Rowridge Lane Rowridge Newport Isle of Wight" PO304HT (1 component)

Battery/generator UPS

Active • 2018-19 (T-1)
No capacity data
(Estimated)
(TEESSIDE), ORMESBY PUMPING STATION, MIDDLESBROUGH, CLEVELAND,TS7 9JH (1 component)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW (Est from CMU) (part of 3.74 MW aggregated CMU)
(Estimated)
1 MW - Oakhill Farm, ST10 4JH (1 component)

1 MW diesel gensets

Active • 2020-21 (T-4)
No capacity data
(Estimated)
53.56 MW (Est from CMU)
(Estimated)
No capacity data
(Estimated)
120 London Wall, London EC2Y 5ET (1 component)

This is an office building with large chillings

Active • 2017-18 (TR)
No capacity data
(Estimated)
132 Manchester Road, Carrington, Manchester, M31 4AY (1 component)
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
• New combined cycle gas turbine unit comprising the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed on Carrington Manchester
• 5 x 9.98MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
Active • 2027-28 (T-4), 2024-25 (T-4) ...
1761.93 MW (Est from CMU)
(Estimated)
133 Balornock Road, Glasgow, G21 3UW (1 component)

Generators on hospital site

Active • 2024-25 (T-1), 2023-24 (T-4) ...
13.41 MW (Est from CMU) (part of 13.41 MW aggregated CMU)
(Estimated)
1345 Govan Rd., Glasgow, G51 4TF (1 component)

CHPs at Queen Elizabeth Hospital

Active • 2024-25 (T-1), 2023-24 (T-1) ...
8.60 MW (Est from CMU)
(Estimated)
Loading map...