Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing first 1629 of 1629 unique locations - Page 1 of 66

Sort by: A-Z Components MW Date
'The Black Shed', Belleknowes Industrial Estate, Inverkeithing, KY11 1HY (1 component)

A new build, gas fuelled generation station.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
37.95 MW (Est from CMU)
(Estimated)
(TEESSIDE), ORMESBY PUMPING STATION, MIDDLESBROUGH, CLEVELAND,TS7 9JH (1 component)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW (Est from CMU) (part of 3.74 MW aggregated CMU)
(Estimated)
1 Loicher Ln, Sheffield S35 9XN, UK (1 component)

2MW 60 minute frequency response battery storage

Active • 2021-22 (T-4)
No capacity data
(Estimated)
1 Maxwell Road, Woodston Industrial Estate, Peterborough PE2 7JB (1 component)
• This CMU is 10*2MW reciprocating engines using HVO.
• This CMU is 6*2MW reciprocating engines.
• This CMU is 10*2MW reciprocating engines.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
37.40 MW (Est from CMU) (part of 37.40 MW aggregated CMU)
(Estimated)
1 Ratty's Lane, Hoddesdon, Hertfordshire, EN11 0RF (1 component)
• Combined Cycle Gas Turbine plant
• Combined Cycle Gas Turbine
Active • 2028-29 (T-4), 2026-27 (T-4)
978.64 MW
(Estimated)
No capacity data
(Estimated)
643.50 MW (Est from CMU)
(Estimated)
1 Ratty's Lane, Hoddesdon. Hertsfordshire. EN11 ORF (1 component)

Combined Cycle Gas Turbine

Inactive • 2020-21 (T-4), 2017-18 (T-1)
313.17 MW (Est from CMU)
(Estimated)
1020 CENTRE PARK, WARRINGTON WA1 1QL (1 component)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.

Active • 2020-21 (T-4)
No capacity data
(Estimated)
1020 CENTRE PARK, WARRINGTON WA1 1QY (1 component)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
(Estimated)
1020 Slutchers Lane, Centre Park, Warrington, WA1 1QL (1 component)
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
59.66 MW (Est from CMU)
(Estimated)
1092 Ransomes Way, Ipswich IP3 8TF, UK (1 component)

16MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Active • 2022-23 (T-4)
No capacity data
(Estimated)
120 London Wall, London EC2Y 5ET (1 component)

This is an office building with large chillings

Active • 2017-18 (TR)
No capacity data
(Estimated)
133 Balornock Road, Glasgow, G21 3UW (1 component)

Generators on hospital site

Active • 2024-25 (T-1), 2023-24 (T-4) ...
13.41 MW (Est from CMU) (part of 13.41 MW aggregated CMU)
(Estimated)
1345 Govan Rd., Glasgow, G51 4TF (1 component)

CHPs at Queen Elizabeth Hospital

Active • 2024-25 (T-1), 2023-24 (T-1) ...
8.60 MW (Est from CMU)
(Estimated)
160 Ipswich Road, Stoke Holy Cross, Norwich NR14 8PQ, UK (1 component)
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
2 Parsonage Lane, Rochester, Kent, ME2 4UR (1 component)

New Gas-fired 20MW CMU connected on the distrbution network boundary via a standard COP2 meter with no auxilliary load on site

Active • 2021-22 (T-4)
No capacity data
(Estimated)
2-6 Judds Lane, Coventry, West Midlands, CV6 6AQ (1 component)
• Gas reciprocating engines.
• Battery Storage Facility
• Diesel and/or gas reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
(Estimated)
4 Chemistry Lane, Pentre, Deeside CH5 2DA, UK (1 component)

14MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Active • 2028-29 (T-4)
25.71 MW
(Estimated)
4 Chemistry Lane, Pentre, Deeside, CH5 2DW (1 component)

14MW Power plant comprising 7x2MW gas reciprocating engines. The power plant is connected to the local distribution and gas network.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
No capacity data
(Estimated)
4 Chemistry Ln, Pentre, Deeside, CH5 2DA (1 component)
• Peak power plant
• Reciprocating engine
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
40 Burrowfields, Welwyn Garden City, Hertfordshire, AL7 4SR (1 component)

6 MW power plant comprising a series of gas reciprocating engines

Inactive • 2020-21 (T-4), 2017-18 (T-1)
No capacity data
(Estimated)
No capacity data
(Estimated)
5 Howick Place London SW1P 1WG (1 component)

The CMU component is an aggregation of turn-down and onsite generation

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
No capacity data
(Estimated)
5 Mile Drive, Northwick, GL56 9TR (2 components)

Reciprocating engines

Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
No capacity data
(Estimated)
Loading map...