Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing first 5 of 5 unique locations

Cwm Rheidol Aberystywth, Ceredigion SY23 3NF Aberystwyth (2 components)
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Cwm Rheidol Power Station (being one out of two) which is supplied by water from the Dinas Reservoir.
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Dinas Power Station, which is supplied by water from the Nant-y-Moch reservoir.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
150.57 MW (Est from CMU)
(Estimated)
East Tarelgin Farm, Ayr, KA6 6NF (2 components)
• BESS to be installed within a Greener Grid Park
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
Active • 2028-29 (T-4), 2025-26 (T-4)
74.41 MW (Est from CMU)
(Estimated)
Land 475m NW of Hillcrest Cottage, Shebster KW14 7QY (1 component)

New build BESS to be installed within a future Greener Grid Park.

Active • 2028-29 (T-4)
30.57 MW
(Estimated)
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire PA2 8UY (1 component)

BESS project to be installed within a future Greener Grid Park.

Active • 2028-29 (T-4)
729.20 MW
(Estimated)
Thornton Greener Grid Park, Thornton, Melbourne, York, YO42 4RZ (2 components)

BESS project to be installed within a future Greener Grid Park.

Active • 2028-29 (T-4), 2025-26 (T-1)
55.01 MW
(Estimated)
Loading map...