Showing first 46 of 46 unique locations - Page 1 of 2

Sort by: A-Z Components MW Date
*Please see cover letter regarding postcode Aberarder Wind Farm, Aberarder Estate, Strathnairn, Highland Scotland (1 component)

New build wind farm at Aberarder consisting of 12 wind turbines.

Active • 2023-24 (T-4), 2022-23 (T-3)
4.10 MW (Est from CMU)
(Estimated)
1 Ratty's Lane, Hoddesdon, Hertfordshire, EN11 0RF (1 component)
• Combined Cycle Gas Turbine plant
• Combined Cycle Gas Turbine
Active • 2028-29 (T-4), 2026-27 (T-4)
978.64 MW
(Estimated)
No capacity data
(Estimated)
643.50 MW (Est from CMU)
(Estimated)
1 Ratty's Lane, Hoddesdon. Hertsfordshire. EN11 ORF (1 component)

Combined Cycle Gas Turbine

Inactive • 2020-21 (T-4), 2017-18 (T-1)
313.17 MW (Est from CMU)
(Estimated)
61.58 MW (Est from CMU)
(Estimated)
Basin Road South, Portslade, East Sussex, BN41 1WF (1 component)

Combined Cycle Gas Turbine plant

Active • 2028-29 (T-4), 2023-24 (T-4) ...
573.24 MW (Est from CMU)
(Estimated)
Basin Road South. Portslade. East Sussex. BN41 1WF (1 component)

Combined Cycle Gas Turbine plant

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
186.15 MW (Est from CMU)
(Estimated)
Carlton Forest, Blyth Road, Worksop, S81 0TP (1 component)
• A New Build 8MW ACT generating station using a closed loop steam system.
• A New Build 8MW Fuelled Generating Station.
• A New Build 10MW Fuelled Generating Station.
Inactive • 2021-22 (T-4)
No capacity data
(Estimated)
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (1 component)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
34.61 MW (Est from CMU)
(Estimated)
Kincardine on Forth. Clackmannanshire. FK10 4AA. Scotland (1 component)
• Longannet coal fired power station - Unit 2
• Longannet coal fired power station - Unit 1
• Longannet coal fired power station - Unit 3
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
(Estimated)
Kingsnorth, Hoo, Rochester, Kent, ME3 9TX (1 component)
• Combined Cycle Gas Turbine plant
• A new combined cycle gas turbine (unit 5) at Damhead Creek 2 power plant
• A new Combined Cycle Gas Turbine unit (unit 4) at Damhead Creek 2 power plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5480.84 MW (Est from CMU)
(Estimated)
No capacity data
(Estimated)
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (1 component)
• Combined Cycle Gas Turbine plant
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
1887.09 MW (Est from CMU)
(Estimated)
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (Next to Damhead Creek Power Station CMU SP17DC) (1 component)
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
• New reciprocating generating plant.
Active • 2021-22 (T-4)
1557.00 MW (Est from CMU)
(Estimated)
No capacity data
(Estimated)
Land Adjacent to Braintree Substation Braintree 400kV substation Braintree Road Cressing CM77 8DJ (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Inactive • 2022-23 (T-4)
No capacity data
(Estimated)
Land Adjacent to Norwich Substation Mangreen Lane Stoke Holy Cross Norwich NR14 8PG (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Inactive • 2022-23 (T-4)
No capacity data
(Estimated)
Land Adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Active • 2022-23 (T-4)
No capacity data
(Estimated)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (1 component)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
12.74 MW
(Estimated)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
7.10 MW (Est from CMU)
(Estimated)
Land adjacent to Netherlands Way / Europa Way Stallingborough Grimsby DN41 8DT (3 components)
• 10x 2MW Gas Reciprocating Engines
• 10 x 2MW gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-3)
37.99 MW (Est from CMU)
(Estimated)
Land at Ellbridge Farm, Ellbridge Lane, Hatt Saltash PL12 6PU (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2028-29 (T-4)
16.07 MW
(Estimated)
Land at Queens Road, Immingham, DN40 1QR (1 component)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
Active • 2028-29 (T-4), 2021-22 (T-4) ...
29.54 MW (Est from CMU)
(Estimated)
Land directly South to Coventry Substation Parrotts Grove Coventry CV2 1NQ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2024-25 (T-4)
No capacity data
(Estimated)