Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

Showing first 17000 of 17000 unique locations - Page 1 of 680

Sort by: A-Z Components MW Date
"Arqiva Crawley Court Winchester Hampshire" SO212QA (1 component)

Battery/generator UPS

Active • 2018-19 (T-1)
No capacity data
(Estimated)
No capacity data
(Estimated)
No capacity data
(Estimated)
No capacity data
(Estimated)
No capacity data
(Estimated)
No capacity data
(Estimated)
"Arqiva Site Pontop Pike Lane Dipton Stanley Durham" DH99AT (1 component)

Battery/generator UPS

Active • 2018-19 (T-1)
No capacity data
(Estimated)
No capacity data
(Estimated)
"Arqiva Site Wychbold Nr. Droitwich Worcestershire" WR90DF (1 component)

Battery/generator UPS

Active • 2018-19 (T-1)
No capacity data
(Estimated)
No capacity data
(Estimated)
"Butchersfield Landfill Site, Rixton Old Hall, Manchester Road, Rixton, WARRINGTON, WA3 6EW" (1 component)

2 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery

Inactive • 2020-21 (T-4), 2017-18 (T-1)
No capacity data
(Estimated)
"CROYDON SOUTH NORWOOD HILL Croydon Greater London 2" SE256BQ (1 component)

Battery/generator UPS

Active • 2018-19 (T-1)
No capacity data
(Estimated)
"Caldbeck Maintenance Centre Brocklebank Caldbeck Wigton Cumbria" CA78DW (1 component)

Battery/generator UPS

Active • 2018-19 (T-1)
No capacity data
(Estimated)
"Emley Moor SC Jagger Lane Emley Moor Huddersfield West Yorkshire" HD89TQ (1 component)

Battery/generators UPS

Active • 2018-19 (T-1)
No capacity data
(Estimated)
"Grimsargh Preston Lancashire PR2 5LE " (1 component)

Turn down CMU

Inactive • 2017-18 (T-1)
No capacity data
(Estimated)
"Land to the east of Marl Road, Knowsley, Kirkby, L33 7UH (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
No capacity data
(Estimated)
"Mercia EnvirRecover EfW Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB" (1 component)
• This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 MW grid connection size, in line with rule 3.5.3 using historic data. Mercia Waste Management Ltd 250kT Energy from Waste plant with c. 19MW electrical output net. Auxilliary load is not included in connection capacity .i.e the export is net.
• Mercia Waste Management Ltd Hartlebury Trading Estate Kidderminster DY10 4JB. In build Energy from Waste plant in Hartlebury. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
168.99 MW (Est from CMU)
(Estimated)
"SANDY HEATH MAINTENANCE CENTRE Sandy Potton Bedfordshire" SG192NH (1 component)

Battery/generator UPS

Active • 2018-19 (T-1)
No capacity data
(Estimated)
"Site Rowridge Rowridge Lane Rowridge Newport Isle of Wight" PO304HT (1 component)

Battery/generator UPS

Active • 2018-19 (T-1)
No capacity data
(Estimated)
' WHISTLEY HALL LOVE LANE ASHBURTON NEWTON ABBOTT DEVON TQ13 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
No capacity data
(Estimated)
'The Black Shed', Belleknowes Industrial Estate, Inverkeithing, KY11 1HY (1 component)

A new build, gas fuelled generation station.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
37.95 MW (Est from CMU)
(Estimated)
(TEESSIDE), ORMESBY PUMPING STATION, MIDDLESBROUGH, CLEVELAND,TS7 9JH (1 component)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW (Est from CMU) (part of 3.74 MW aggregated CMU)
(Estimated)
*Please see cover letter regarding postcode Aberarder Wind Farm, Aberarder Estate, Strathnairn, Highland Scotland (1 component)

New build wind farm at Aberarder consisting of 12 wind turbines.

Active • 2023-24 (T-4), 2022-23 (T-3)
4.10 MW (Est from CMU)
(Estimated)
*Please see cover letter regarding postcode Blary Hill wind farm, Off C20 road (Barr Glen Road), Glenbarr, Tarbert, Scotland, UK (1 component)

New build wind farm at Blary Hill consisting of 14 wind turbines.

Active • 2023-24 (T-4), 2022-23 (T-3)
2.87 MW (Est from CMU)
(Estimated)
Loading map...