Combined Cycle Gas Turbine (CCGT) Locations

Showing first 65 of 65 unique locations - Page 1 of 3

Sort by: A-Z Components MW Date
1 Ratty's Lane, Hoddesdon, Hertfordshire, EN11 0RF (1 component)
• Combined Cycle Gas Turbine plant
• Combined Cycle Gas Turbine
Active • 2028-29 (T-4), 2026-27 (T-4)
978.64 MW
(Estimated)
No capacity data
(Estimated)
643.50 MW (Est from CMU)
(Estimated)
111 Brancroft Way Enfield Middlesex EN3 7PL (1 component)

Enfield CCGT Power Station - (one unit station)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1595.21 MW (Est from CMU)
(Estimated)
132 Manchester Road, Carrington, Manchester, M31 4AY (1 component)
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
• New combined cycle gas turbine unit comprising the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed on Carrington Manchester
• 5 x 9.98MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
Active • 2027-28 (T-4), 2024-25 (T-4) ...
1761.93 MW (Est from CMU)
(Estimated)
No capacity data
(Estimated)
No capacity data
(Estimated)
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (2 components)
• Existing OCGT module
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
• Existing CHP module
Active • 2024-25 (T-4), 2023-24 (T-4) ...
428.74 MW (Est from CMU)
(Estimated)
Basin Road South, Portslade, East Sussex, BN41 1WF (1 component)

Combined Cycle Gas Turbine plant

Active • 2028-29 (T-4), 2023-24 (T-4) ...
573.24 MW (Est from CMU)
(Estimated)
Basin Road South. Portslade. East Sussex. BN41 1WF (1 component)

Combined Cycle Gas Turbine plant

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
186.15 MW (Est from CMU)
(Estimated)
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (1 component)
• The CMU component is a combined cycle gas turbine
• This CMU (CGTN_3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
• This CMU (CARRI3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3471.17 MW (Est from CMU)
(Estimated)
Centrica Barry Power Station, Sully Moors Rd, Sully, CF64 5RP. (1 component)

Centrica Barry Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
363.08 MW
(Estimated)
Clough Lane North Killingholme North Lincolnshire DN40 3JP (1 component)

A combined cycle gas turbine generating plant

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1282.77 MW (Est from CMU)
(Estimated)
Corringham, Stanford-le-Hope, Essex SS17 9LP UK (1 component)

A new combined cycle power station comprising the latest technology gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land …

Active • 2021-22 (T-4), 2020-21 (T-4)
1095.30 MW (Est from CMU)
(Estimated)
Cottam Development Centre Power Station Cottam Retford DN22 0TF (1 component)

Cottam Development Centre (CDC) CCGT single unit station

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1362.24 MW (Est from CMU)
(Estimated)
Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ (1 component)

A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3037.88 MW (Est from CMU)
(Estimated)
Deeside Power Station Weighbridge Road Zone 4, Deeside Industrial Park Deeside Flintshire CH5 2UL (1 component)
• Deeside CCGT Power Station.
• Deeside CCGT Power Station. Please note: The TEC deferral box has been ticked on the CMU Main Page. The text on the EMR Portal screen mentions Rule 3.6.3(b) and the commitment to secure TEC by 18 months before the Delivery Year. DEEP_1 is applying for the Supplementary Auction only and therefore this option has been used in relation to Rule 3.10A.2, where TEC is required by 6 months prior to the Delivery Year.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
370.02 MW
(Estimated)
Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU (1 component)
• Didcot B6 - CCGT MSID: 4055
• Didcot B5 - CCGT MSID: 4055
• Didcot B5 - CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4732.58 MW (Est from CMU)
(Estimated)
Drakelow Power Station, Burton on Trent, DE15 9TZ (1 component)

The unit is a four on two air cooled CCGT utilizing Siemens Industrial Trent DLE aero-derivitive gas turbines. The plant will be located at Drakelow, South Derbyshire.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
175.50 MW (Est from CMU)
(Estimated)
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (2 components)
• West Burton B Power Station CMU 2 WB2-19= 100% T_WBURB-2
• West Burton B Power Station CMU 1 WB1-19= 100% T_WBURB-1
• West Burton B Power Station CMU 1 WB1-18= 100% T_WBURB-1
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1246.05 MW (Est from CMU)
(Estimated)
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ (1 component)

EP Humber Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
252.00 MW (Est from CMU) (part of 252.00 MW aggregated CMU)
(Estimated)
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ. (1 component)

EP Humber Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
252.00 MW (Est from CMU) (part of 252.00 MW aggregated CMU)
(Estimated)
EP Langage Power Station, Holland Road, Plymouth, PL7 5AW (1 component)

EP Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2028-29 (T-4)
No capacity data
(Estimated)
EP Langage Power Station, Holland Road, Plymouth, PL7 5AW. (1 component)

EP Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1757.33 MW (Est from CMU)
(Estimated)
EP South Humber Bank Power Station, South Marsh Road, Stallingborough, DN41 8BZ (2 components)
• EP South Humber Bank Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
• EP South Humber Bank Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
Active • 2028-29 (T-4), 2025-26 (T-4)
263.67 MW
(Estimated)