Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 4h) Locations

Showing first 73 of 73 unique locations - Page 1 of 3

Sort by: A-Z Components MW Date
24a Flightway Dunkeswell Honiton EX14 4LG (1 component)

New Build Generating CMU comprising of a battery storage asset

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Adjacent to National Grid Stalybridge substation SK15 3DA. (1 component)

Lithium ion battery storage plant.

Active • 2027-28 (T-4)
15.39 MW
(Estimated)
Anglian Water Services Limited, Pineham, Milton Keynes, MK15 9PA (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2027-28 (T-4), 2024-25 (T-1)
0.13 MW (Est from CMU) (part of 0.13 MW aggregated CMU)
(Estimated)
Birch House, Forge Lane, Moorlands Trading Estate, Saltash, PL12 6LX (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1)
0.22 MW (part of 0.22 MW aggregated CMU)
(Estimated)
Bullen Lane, Bramford, Mid Suffolk, Suffolk, England, IP8 4JH, United Kingdom (1 component)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Active • 2027-28 (T-4)
122.81 MW
(Estimated)
22.54 MW
(Estimated)
Cirencester Solar Farm Witpit Lane Preston Cirencester GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (1 component)

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm

Active • 2025-26 (T-4), 2024-25 (T-1) ...
30.64 MW (Est from CMU)
(Estimated)
Coal Aston, Dronfield, S18 3AA (1 component)
• A Distribution Connected Battery Energy Storage System
• A 45MW Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
37.63 MW
(Estimated)
Dellsome Power, Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (1 component)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2027-28 (T-4), 2025-26 (T-1) ...
5.57 MW (Est from CMU)
(Estimated)
Dounreay, Thurso KW14 7RE (1 component)
• A Distribution Connected Battery Energy Storage System
• A 34MW Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
28.43 MW
(Estimated)
Dragons Lane, Moston, Sandbach, CW11 3QH (1 component)

12 MW Connection 48 MWh Distribution unit

Active • 2026-27 (T-4), 2023-24 (T-1)
20.46 MW (Est from CMU)
(Estimated)
Eccles Birgham Farm TD12 4LU (2 components)
• Lithium ion battery storage plant
• 50MW battery storage located near to the SPT Eccles substation.
• 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
Active • 2028-29 (T-4), 2027-28 (T-4) ...
80.75 MW
(Estimated)
Eccles Birgham Farm, TD12 4LU (1 component)

Lithium ion battery storage plant

Active • 2027-28 (T-4)
15.39 MW
(Estimated)
Farr & Harris Ltd, Brassey Road, Shrewsbury, SY3 7FA (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW (part of 0.27 MW aggregated CMU)
(Estimated)
Farr & Harris Ltd, Maes Y Clawdd, Maesbury Road Industrial Estate, Oswestry SY10 8NN (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.26 MW (part of 0.26 MW aggregated CMU)
(Estimated)
Farr & Harris Ltd, Unit 3, Dyffryn Industrial Estate, Pool Road, Newtown, SY16 3BD (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.26 MW (part of 0.26 MW aggregated CMU)
(Estimated)
33.39 MW
(Estimated)
Glowhouse Power, 135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2025-26 (T-1)
2.58 MW
(Estimated)
Heysham Road, Bootle, L30 6TU (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW (part of 0.27 MW aggregated CMU)
(Estimated)
Hollybush, Ebstree Road, Trysull, Wolverhampton, WV5 7JE United Kingdom (1 component)

BESS stand alone projec connected to 49.9MVA import/export to Penn-Wolverhampton West n2 132kV OHL (NGED). The purpose of the BESS is to provide balancing services to the local electricity grid. …

Active • 2028-29 (T-4)
7.93 MW
(Estimated)
61.13 MW (Est from CMU)
(Estimated)
Land And Buildings Adjoining Saxilby Road Burton Fen LN1 2BE (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW (part of 0.27 MW aggregated CMU)
(Estimated)
Land At South End of Mullacott Cross Industrial Estate, West Down EX34 8FN (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2024-25 (T-1)
0.09 MW (part of 0.09 MW aggregated CMU)
(Estimated)
Loading map...