Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h) Locations

Showing first 361 of 361 unique locations - Page 1 of 15

Sort by: A-Z Components MW Date
53.56 MW (Est from CMU)
(Estimated)
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (2 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• CMU consisting of multiple reciprocating engines and alternators
Active • 2024-25 (T-4), 2023-24 (T-4) ...
9.68 MW (Est from CMU)
(Estimated)
165 Fordhouse Lane Stirchley Birmingham B30 3AG (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
8.38 MW
(Estimated)
322 Broomloan Rd, Glasgow G51 2JQ (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
20.94 MW
(Estimated)
72-77 Lower Tower Street, Hockley, Birmingham, B19 3NF (1 component)

New build battery storage

Active • 2028-29 (T-4)
17.80 MW
(Estimated)
Abbey Home Farm, Burford Road, Cirencester, GL7 5HF (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
11.12 MW (Est from CMU)
(Estimated)
Adswood Road, Cheadle Hulme, Stockport, Greater Manchester, SK8 5QY (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4)
36.62 MW
(Estimated)
Aikengall 2a Wind Farm Innerwick EH42 1SG (1 component)

New Build Battery Energy Storage System. To be connected at WesterDod 132kV substation.

Active • 2027-28 (T-4), 2024-25 (T-1)
18.03 MW
(Estimated)
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (1 component)
• Battery storage plant
• Existing generating battery storage unit.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
50.58 MW (Est from CMU)
(Estimated)
Ardencaple Farm, Rhu, Helensburgh, Argyll & Bute, G84 8JX (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
10.47 MW
(Estimated)
Arran View Jameston Farm Dalry North Ayrshire KA24 4EY (1 component)

13 x 3.800MW / 7.491MWh storage units installed on designated land within a brownfield site at Jameston Farm, Dalry, North Ayrshire, KA24 4EY

Active • 2026-27 (T-4)
11.79 MW
(Estimated)
Ashlett Creek, Fawley, Hampshire, SO45 1DT (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
11.08 MW
(Estimated)
Ashley Clinton Estate, Milford-on-Sea, Lymington, SO41 0LA (1 component)

A standalone 0.949MW BESS connected directly to the DNO network

Active • 2025-26 (T-1)
0.52 MW (part of 0.52 MW aggregated CMU)
(Estimated)
Auchteraw Farm, Fort Augustus, PH32 4BT (1 component)
• New build battery storage CMU with CMU ID 24AUC1
• New build battery storage CMU with CMU ID 23AUC1
• New build battery storage CMU with CMU ID 22AUC1
Active • 2025-26 (T-1), 2024-25 (T-1) ...
73.66 MW (Est from CMU)
(Estimated)
B970, Boat of Garten, Highland, Scotland, PH24 3BY, United Kingdom (1 component)

New build 49.9MW / 99.8MWh battery energy storage system

Active • 2027-28 (T-4)
4.62 MW
(Estimated)
61.58 MW (Est from CMU)
(Estimated)
Barton Hill Way, Torquay, TQ2 8JG (2 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
• New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
41.27 MW (Est from CMU)
(Estimated)
Basingstoke Energy Storage Facility, Basing Road, Old Basing, Basingstoke, Hampshire, RG24 7AL (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4), 2024-25 (T-1)
5.21 MW (Est from CMU)
(Estimated)
Birch Road, Colchester CO2 0EJ (1 component)

This CMU component represents the BESS system of a co-located (solar and storage) site

Active • 2025-26 (T-1)
15.16 MW
(Estimated)
Blandford Road, Poole, BH16 6AB (1 component)
• A 25 MW Battery Storage Site
• A 25MW New Build Battery Storage Site
• A 25MW Battery Storage Site
Active • 2026-27 (T-4), 2025-26 (T-1) ...
41.55 MW (Est from CMU)
(Estimated)
Braehead Farm Riccarton Kilmarnock KA1 5LN (1 component)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land, approximately 250 Metres north of Kilmarnock Substation. …

Active • 2028-29 (T-4)
71.20 MW
(Estimated)
Bristol Avenue, Blackpool, FY2 0JF (1 component)
• New Build CMU comprising of battery storage and associated plant
• Existing CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-1) ...
33.36 MW (Est from CMU) (part of 33.36 MW aggregated CMU)
(Estimated)
Bronze Cricket Club, Chapel Lane, Great Barr, Walsall, WS9 0QU (1 component)

2 hr duration Battery Energy Storage System located in England

Active • 2028-29 (T-4)
8.79 MW
(Estimated)
Bullen Lane, Bramford, Mid Suffolk, Suffolk, England, IP8 4JH (1 component)

Two hour duration battery storage

Active • 2028-29 (T-4)
25.13 MW
(Estimated)
Loading map...