Combined Cycle Gas Turbine (CCGT) Locations

Showing last 65 of 65 unique locations - Page 1 of 3

Sort by: A-Z Components MW Date
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP (1 component)
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire. Metering of output is Net of auxillary load.
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
• Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
720.00 MW (Est from CMU)
(Estimated)
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (1 component)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. …

Active • 2026-27 (T-4), 2025-26 (T-4) ...
2154.60 MW (Est from CMU)
(Estimated)
West Marsh Road, Spalding, Lincolnshire, PE11 2BB (1 component)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. …

Active • 2028-29 (T-4), 2021-22 (T-4) ...
1338.64 MW (Est from CMU)
(Estimated)
West Marsh Road Spalding Lincolnshire PE11 2BB (1 component)
• A new combined cycle power station comprising gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
• A new combined cycle power station comprising the latest technology gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active • 2021-22 (T-4), 2020-21 (T-4)
No capacity data
(Estimated)
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (2 components)
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2330.50 MW (Est from CMU)
(Estimated)
Thorpe Marsh Power Station, nr Barnby Dun, Doncaster DN3 1ET (1 component)
• New combined cycle gas turbine power station comprising two units of the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed nr Barnby Dun
• CCGT Unit
• CCGT Unit 1 (connected as G1)
Active • 2022-23 (T-4), 2021-22 (T-4) ...
No capacity data
(Estimated)
The Manor Way, Stanford-le-Hope, Essex, SS17 9GN (1 component)

A CCGT station consisting of two Alstom GT26 gas turbines and a steam turbine and is based near Stanford-le-hope in Essex, England. Each turbine is individually metered with output being …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1985.92 MW (Est from CMU)
(Estimated)
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (2 components)
• Existing CCGT to be refurbished
• Existing CCGT
• Sutton Bridge Project: The construction at the Sutton Bridge Power CMU (23SB01), an existing Combined Cycle Gas Turbine (CCGT) plant will include both installation of new generating equipment and the upgrade or refurbishment of the current equipment at the site. The construction will include the installation of new combustion turbines (CT), installation of new CT generators, installation of a new steam turbine (ST) and ST generator, refurbishment of the heat recovery steam generators (HRSGs), installation of a new distributed control system (DCS) and balance of plant refurbishments.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2257.82 MW (Est from CMU)
(Estimated)
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (1 component)
• Staythorpe 3 - CCGT MSID: 7210
• Staythorpe 1 - CCGT MSID: 7210
• Staythorpe 2 - CCGT MSID: 7210
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6018.18 MW (Est from CMU)
(Estimated)
Site of the former Teesside Power Station Greystone Road Grangetown Middlesbrough TS6 8JF (1 component)

Tees CCPP is a 542.6MW CCGT unit to be installed on designated land within the (former ICI) Wilton Site this will be connected to Greystones 275kV 'A' Substation and Greystones …

Active • 2023-24 (T-4)
488.34 MW (Est from CMU)
(Estimated)
434.35 MW (Est from CMU)
(Estimated)
Severn Power Station West Nash Road Nash Newport NP18 2BZ (1 component)
• Existing CCGT Unit
• Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
Active • 2028-29 (T-4), 2025-26 (T-1) ...
1551.59 MW (Est from CMU)
(Estimated)
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (1 component)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
55.09 MW (Est from CMU)
(Estimated)
966.27 MW (Est from CMU) (part of 966.27 MW aggregated CMU)
(Estimated)
2171.63 MW (Est from CMU) (part of 2171.63 MW aggregated CMU)
(Estimated)
1.63 MW
(Estimated)
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (2 components)
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Hythe Power Station - Auxiliary load behind boundary meter
• Three (3) Reciprocating Gas Engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
(Estimated)
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (3 components)
• Peterhead CCGT
• Peterhead 1 for Delivery Year 2017/18 only
• Peterhead 1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6471.35 MW (Est from CMU)
(Estimated)
Pembroke Power Station Pembroke Dyfed SA71 5SS (1 component)
• Pembroke 11 - CCGT MSID: 7237
• Pembroke 41 - CCGT MSID: 7237
• Pembroke 21 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6359.67 MW (Est from CMU)
(Estimated)
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (1 component)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
• The CMU is a combined cycle gas turbine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3397.00 MW (Est from CMU)
(Estimated)
Medway Power Station, Rochester, Medway, ME3 0AG (1 component)
• Medway CCGT
• Medway
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6669.90 MW (Est from CMU)
(Estimated)
Marchwood Power, Marchwood Industrial Park, Oceanic Way, Marchwood, Southampton, SO40 4BD (1 component)
• Marchwood CCGT
• Gensets 1. 2 & 3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3678.80 MW (Est from CMU)
(Estimated)
Livesey Branch Rd. Feniscowles. Blackburn. Lancashire. BB2 5HX (1 component)

Small Combined Cycle Gas Turbine plant Registered capacity 75MVA or 60MW at 0.8PF.

Active • 2022-23 (T-4), 2021-22 (T-4)
No capacity data
(Estimated)
Livesey Branch Rd, Feniscowles, Blackburn, Lancashire, BB2 5HX (1 component)
• Small Combined Cycle Gas Turbine plant with contracted connection capacity 75MVA or 60MW at 0.8PF
• Small Combined Cycle Gas Turbine plant with registered capacity 75MVA or 60MW at 0.8PF.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
220.53 MW (Est from CMU)
(Estimated)
Little Barford Power Station Little Barford St Neots PE19 6YT (1 component)
• Little Barford 1 CCGT MSID: 4052
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052
• Little Barford 1 OCGT . fuel type is distillate
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3881.97 MW (Est from CMU)