Storage (Duration 2h) Locations

Showing last 359 of 359 unique locations - Page 1 of 15

Sort by: A-Z Components MW Date
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (1 component)
• A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity.
• A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
15.25 MW (Est from CMU)
(Estimated)
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (2 components)
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
• Battery Storage plant
• Gas reciprocating engines
Active • 2027-28 (T-4), 2026-27 (T-4) ...
286.73 MW
(Estimated)
land at Keelings Road, Southminster, CM0 7JF (1 component)
• New build generating CMU component known as Dengie Solar Park
• New build generating CMU component known as Dengie BESS
Active • 2027-28 (T-4), 2025-26 (T-1)
4.43 MW
(Estimated)
lLand off Lincomb Lane, Lincomb, Stourport On Severn, DY13 9RB (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
41.46 MW
(Estimated)
former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (1 component)

CMU to comprise multiple individual storage units metered and despatched centrally

Active • 2026-27 (T-4), 2025-26 (T-4)
73.76 MW (Est from CMU)
(Estimated)
adjacent to Kilmarnock South Substation KA1 3TN (1 component)
• 200MW battery storage located near to the SPT Kilmarnock South substation, split into two BMU's
• 200MW battery storage located near to theSPT Kilmarnock South substation, split into two BMU's
Active • 2026-27 (T-4)
47.26 MW
(Estimated)
Wright Street, Paisley, Renfrew, PA4 8AN (1 component)

Battery Energy Storage, 49.990 MW installed for a 2hr system.

Active • 2028-29 (T-4)
20.94 MW
(Estimated)
41.75 MW
(Estimated)
Withy Place, Bramley Road, Silchester, Reading, RG7 2LN (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
10.47 MW
(Estimated)
Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (1 component)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2025-26 (T-1), 2024-25 (T-1) ...
29.64 MW (Est from CMU) (part of 29.64 MW aggregated CMU)
(Estimated)
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (1 component)
• New build generating CMU component - Whaddon Farm BESS
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park.
Active • 2027-28 (T-4), 2024-25 (T-1)
6.23 MW (Est from CMU)
(Estimated)
Westfield Road, Carlton, Wakefield, WF3 3RJ (1 component)

Battery energy storage system

Active • 2028-29 (T-4)
20.90 MW
(Estimated)
West of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4)
8.98 MW
(Estimated)
West Marsh Road Spalding Lincolnshire PE11 3BB (2 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
259.70 MW (Est from CMU)
(Estimated)
West House Farm, Scruton, Northallerton, DL7 0RQ (1 component)

18MW, 2-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. Solar PV farm has secured …

Active • 2028-29 (T-4)
7.54 MW
(Estimated)
Wellington Street, Oldham, Lancashire OL4 1SA (2 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment.
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2026-27 (T-4), 2023-24 (T-4) ...
29.30 MW (Est from CMU)
(Estimated)
Welkin Road, Bredbury, SK6 2BH (2 components)
• Battery Energy Storage System
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.79 MW (Est from CMU)
(Estimated)
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (1 component)
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
• A new build 32MW battery energy storage system
Active • 2024-25 (T-4), 2023-24 (T-1) ...
66.68 MW (Est from CMU)
(Estimated)
Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (1 component)
• A 50MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
62.68 MW
(Estimated)
No capacity data
(Estimated)
Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom (1 component)
• New build CMU. A co-located battery and solar PV site, with a solar generation capacity of 70MW and a shared grid connection.
• New build 49.995MW / 99.990 MWh battery energy storage system.
Active • 2027-28 (T-4), 2025-26 (T-1)
18.20 MW
(Estimated)
Uskmouth Power Station, West Nash Road, Newport, NP18 2BZ (1 component)

115MW battery energy storage system on a shared transmission connection

Active • 2028-29 (T-4)
16.12 MW (part of 16.12 MW aggregated CMU)
(Estimated)
Uskmouth Power Station West Nash Road, Nash, Newport, Wales, NP18 2BZ (1 component)

AW1 Energy Storage Limited (AW1) will develop a Battery Energy Storage System (BESS) at land adjacent to the substation and will initially develop a 120 MW / 240 MWh BESS …

Active • 2028-29 (T-4)
40.20 MW
(Estimated)
Unit 1, Brindley Close, Cheney Manor Industrial Estate, Swindon, SN2 2YW (1 component)

12MW 24MWh battery storage located at Brindley Close in Swindon

Active • 2025-26 (T-4), 2023-24 (T-1)
13.65 MW (Est from CMU)
(Estimated)