Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (1 component)
• BESS project to be installed within a future Greener Grid Park.
• 50MW of BESS to be installed within a future Greener Grid Park.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
58.42 MW
(Estimated)
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (1 component)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
Active • 2025-26 (T-1), 2024-25 (T-1)
4.47 MW (Est from CMU)
(Estimated)
Land south of Inglis Farm, Cockenzie, East Lothian, EH32 0JT. (1 component)

New build battery energy storage unit.

Active • 2028-29 (T-4)
36.57 MW
(Estimated)
Land north west of Braintree Substation, Braintree Road, Cressing, Braintree, CM77 8EZ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2025-26 (T-1)
30.96 MW
(Estimated)
Dellsome Power, Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (1 component)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2027-28 (T-4), 2025-26 (T-1) ...
5.57 MW (Est from CMU)
(Estimated)