Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (1 component)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
9.05 MW (Est from CMU)
(Estimated)
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (1 component)
• One 1.5 MW gas CHP engine in a horticultural environment
• 2MW gas CHP engine in a horticultural environment
• One 1.354 MW gas CHP engine in a horticultural environment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.85 MW (Est from CMU) (part of 9.85 MW aggregated CMU)
(Estimated)
No capacity data
(Estimated)
No capacity data
(Estimated)
207.86 MW (Est from CMU)
(Estimated)
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (1 component)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
232.80 MW (Est from CMU)
(Estimated)
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (1 component)
• One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
• Gas CHP in a horticultiral environment providing heat for crop growth
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.93 MW (Est from CMU) (part of 3.93 MW aggregated CMU)
(Estimated)
Warehouse R Royal Victoria Dock Northside London E16 1BA (1 component)

1.2MW Combined Heat and Power Engine

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
(Estimated)
Waddon Marsh Purley Way Croydon CR0 4NX (1 component)

A reciprocating gas engine CHP providing hot water to a local heat network

Active • 2021-22 (T-4), 2018-19 (T-1)
0.09 MW (part of 0.09 MW aggregated CMU)
(Estimated)
14.53 MW (Est from CMU)
(Estimated)
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (1 component)
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
• Gas CHP engines 1.5MW and 1.48MW. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2026-27 (T-4) ...
8.29 MW (Est from CMU)
(Estimated)
Thearne Lane Woodmansey Beverley HU17 0SA (1 component)

Two gas CHP engines in commercial horticultural environment with no auxilliary load

Active • 2025-26 (T-4), 2023-24 (T-4) ...
1.13 MW (Est from CMU)
(Estimated)
The Royal Marsden NHS Foundation Trust, Downs Road, Sutton, SM2 5PT (1 component)
• Gas Fired - CHP
• CHP
Inactive • 2023-24 (T-4), 2019-20 (T-1) ...
No capacity data
(Estimated)
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (1 component)
• Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel type = Natural Gas
• Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
6.37 MW (Est from CMU)
(Estimated)
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (2 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
32.05 MW (Est from CMU) (part of 32.05 MW aggregated CMU)
(Estimated)
The Billingham Synthetic Plant Haverton Hill Road Billingham TS23 1PY (1 component)

The turbo alternator at the Billingham site

Active • 2018-19 (T-1)
7.20 MW
(Estimated)
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (1 component)
• CHP engine in horticultural environment with no auxilliary load
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2023-24 (T-4) ...
11.64 MW (Est from CMU)
(Estimated)
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (1 component)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
24.33 MW (Est from CMU)
(Estimated)
Stoneykirk Road, Stranraer, DG9 7BU (1 component)
• Gas fired CHP unit
• CHP unit
Active • 2024-25 (T-1), 2023-24 (T-1) ...
12.50 MW (Est from CMU) (part of 12.50 MW aggregated CMU)
(Estimated)
Staverton, Trowbridge, Wiltshire, BA14 6PH (1 component)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
23.13 MW (Est from CMU)
(Estimated)
Station Road, Wigton, Cumbria CA7 9BG (1 component)
• Gas turbine
• Gas engine
• Back pressure steam turbine
Active • 2025-26 (T-4), 2024-25 (T-4) ...
57.56 MW (Est from CMU)
(Estimated)
No capacity data
(Estimated)
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (1 component)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.44 MW (Est from CMU) (part of 5.44 MW aggregated CMU)
(Estimated)
No capacity data
(Estimated)
Speke Operations, Fleming Rd, Liverpool L24 9LN (1 component)
• 2 x gas turbines with a total rated gross power capacity of 6.830 MW and total net power capacity of 6.807
• Speke combined heat and power plant.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...