Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT) Locations

Showing last 64 of 64 unique locations - Page 1 of 3

Sort by: A-Z Components MW Date
land at Hoon Hay Farm, Marston Lane, Hatton, Derbyshire, DE65 5EA (1 component)

gas powered generator to be installed on designated land within a manufacturing compound at the Hoon Hay Farm.

Active • 2024-25 (T-4)
No capacity data
(Estimated)
No capacity data
(Estimated)
Wytch Farm, Wareham BH20 5JR (1 component)

Two gas turbines (CX501-KB7) rated at 5.3MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
No capacity data
(Estimated)
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (1 component)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
232.80 MW (Est from CMU)
(Estimated)
Whitewalls Road, Rochester, Kent, ME2 4DZ (1 component)

A series of gas generators on an existing site.

Active • 2025-26 (T-1)
37.40 MW
(Estimated)
Whitewall Road, Rochester, Kent, ME2 4DZ (1 component)

A series of gas generators on an existing site.

Active • 2024-25 (T-1), 2023-24 (T-1)
75.98 MW (Est from CMU)
(Estimated)
104.35 MW (Est from CMU)
(Estimated)
West Marsh Road Spalding Lincolnshire PE11 3BB (2 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
259.70 MW (Est from CMU)
(Estimated)
Victory Road, Derby, Derbyshire, DE24 9HX (1 component)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
Active • 2026-27 (T-4), 2023-24 (T-4) ...
113.94 MW (Est from CMU)
(Estimated)
426.46 MW
(Estimated)
Ty Coch Farm Greenfield Holywell CH87HT (2 components)

Gas fuelled generation plant

Active • 2024-25 (T-4), 2023-24 (T-4) ...
9.50 MW (Est from CMU)
(Estimated)
The Yard, Holme Road, Stoney Holme, Burnley, BB12 0BJ (1 component)

3 x 2MW gas reciprocating engines used for power generation, with associated infrastructure

Active • 2023-24 (T-4), 2022-23 (T-4) ...
5.70 MW (Est from CMU)
(Estimated)
The Manorway, Stanford-le-Hope, Essex SS17 9LP (1 component)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
Active • 2024-25 (T-4), 2023-24 (T-4)
24.31 MW (Est from CMU)
(Estimated)
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HW (1 component)
• NEW BUILD GAS FUELLED GENERATING STATION
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2020-21 (T-4), 2019-20 (T-1)
No capacity data
(Estimated)
18.26 MW (Est from CMU)
(Estimated)
Rockingham South, Smoke Lane, Avonmouth, BS11 0YT. (1 component)

The CMU will consist of 1 x 2 MW OCGT gas fired engine. It will have its own individual metering arrangements, but will share the grid connection point with 4 …

Inactive • 2022-23 (T-4)
No capacity data
(Estimated)
Rockingham South, Smoke Land, Avonmouth BS11 0YT (1 component)
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs which already have CM agreements. The meterign will be expanded so the CMU can be metered seperatly.
• 10 x 2MW OCGT gas reciprocating engines
• 3 x 2MW OCGT gas reciprocating engines
Active • 2027-28 (T-4), 2021-22 (T-4) ...
9.44 MW (Est from CMU)
(Estimated)
Redditch Generation Station Windsor Road Redditch B97 6HE (2 components)

Gas turbine generator

Active • 2025-26 (T-4), 2024-25 (T-1) ...
116.16 MW (Est from CMU)
(Estimated)
Ratcliffe-on-Soar Nottingham NG11 0EE (2 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• Ratcliffe Unit 3 coal-fired unit
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3602.30 MW (Est from CMU)
(Estimated)
RWE Generation UK plc Ferrybridge A Workshop Site Old Great North Road Knottingley WF11 8PR (1 component)

A CMU will be formed of an Open Cycle Gas Turbine unit.

Active • 2022-23 (T-4)
No capacity data
(Estimated)
Progress Power Station, Eye Airfield, Diss, Suffolk, IP23 7HE (1 component)

A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant

Active • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Power Station Road Isle of Grain Rochester ME3 0AR (1 component)
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
• Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5014.90 MW (Est from CMU)
(Estimated)
Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT (1 component)

Existing OCGT plant.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
918.41 MW (Est from CMU)
(Estimated)
Newton Aycliffe CO Durham DL5 6EA (1 component)
• Existing Gas Engine
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
27.91 MW (Est from CMU) (part of 27.91 MW aggregated CMU)
(Estimated)
New Hall Farm School Lane Birchwood Warrington WA3 6LH (1 component)

New Gas fulled generation station

Active • 2024-25 (T-4), 2023-24 (T-4) ...
5.70 MW (Est from CMU)
(Estimated)
Loading map...